TMI-12-108, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14

From kanterella
Jump to navigation Jump to search
Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14
ML12198A300
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 07/13/2012
From: Atherholt D
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TMI-12-108
Download: ML12198A300 (3)


Text

SAFEGUARDS INFORMATION A Exelon Generation.,

10 CFR 50.54(p)(2) 10 CFR 50.4(b)(4)

TMI-12-108 July 13, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Three Mile Island Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon Generation Company, LLC (EGC) is submitting Revision 14 to the Three Mile Island Security Plan. Changes to this document were implemented on July 13, 2012. In accordance with 10 CFR 50.54(p)(2), EGC is submitting these changes within 60 days of implementation (i.e., no later than September 11, 2012).

The Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan has been revised to:

1. Implement the NRC approved NEI 03-12, Revision 7 Security Plan Template.
2. Implement the NRC approve deviations to NEI 03-12, Revision 7 as described in NRC responses to SFAQ's 12-03, 12-04, 12-05, 12-06 and 12-07.
3. Update TMI's Security Plan Figure #1 & Figure #2 with additional detail specific to existing and/or recently constructed site structures, to improve existing labeling of site structures and to more accurately depict the location of the alternate LLEA command center.
4. Modify descriptions of the Perimeter Intrusion Detection System (PIDS) at the Unit #1 Air Intake to reflect the retirement of a system that no longer meets the requirements of 10 CFR 73.55.
5. Incorporate descriptions of existing and recently installed security systems and/or barriers that serve to enhance the defensive strategy.

EGC has concluded that the changes do not decrease the safeguards effectiveness of the Three Mile Island Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.

Attachments -1and 2 contain Safeguards Information. Therefore, EGC requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (d)(1), and 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements," paragraph (a)(1)(i).

ATTACHMENTS I AND 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION July 13, 2012 U. S. Nuclear Regulatory Commission Page 2 There are no commitments in this letter.

Should you have any questions concerning this letter, please contact Mr. Gregory J. DeHoff at (7.17) 948-8375.

Respectfully, David W. Atherholt Manager - TMI Licensing and Regulatory Affairs Attachments:

1. Three Mile Island, Description of Changes Report, Revision 14 (Contains Safeguards Information)
2. Three Mile Island Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 (Contains Safeguards Information) cc: Regional Administrator - NRC Region I ATTACHMENTS I AND 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION bcc: NRC Project Manager, NRR - Three Mile Island (without attachments)

Site Vice President - Three Mile Island (without attachments)

Regulatory Assurance Manager - Three Mile Island (without attachments)

Director - Licensing and Regulatory Affairs - East (without attachments)

Licensing Engineer - East (without attachments)

Pennsylvania Emergency Management Agency - division of Nuclear Safety (without attachments)

Exelon Document Control Desk - Licensing (Hard Copy)

Commitment Tracking Coordinator - East (R. Gropp)

Regulatory Assurance Specialist - A. Hambly C. Kelley - Cantera (without attachments)

D. Pallansch - Cantera (without attachments)

W. Trump - Kennett Square (without attachments)

ATTACHMENTS I AND 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED