05000254/LER-1993-01224 August 1993LER 93-012-00:on 930726,light Socket Shorted Out When Operator Reset HPCI Logic Power.Caused by Short Circuit in Light Socket.Light Socket & Blown Fuses replaced.W/930824 Ltr
05000254/LER-2014-005Main Control Room Door Unable to Close Causes Loss of Control Room Envelope Boundary
05000254/LER-2015-007Loss of Main Control Room Envelope Boundary Due to Damper Inspection
IR 05000254/198600924 June 1986Insp Repts 50-254/86-09 & 50-265/86-08 on 860413-0607.No Violation Noted.Major Areas Inspected:Previous Insp Findings,Operations,Radiological Controls,Emergency Preparedness & Security
IR 05000254/198701325 August 1987Insp Repts 50-254/87-13 & 50-265/87-13 on 870607-0801. Violations Noted.Major Areas Inspected:Operations,Maint, Surveillance,Ler Review,Routine Repts,Training,Bulletins, Generic Ltrs,Radiation Control,Outages & Licensee Meetings
IR 05000254/198701915 October 1987Insp Repts 50-254/87-19 & 50-265/87-19 on 870802-1003. Violations Noted.Major Areas Inspected:Operations,Maint, Surveillance,Ler Review,Routine Repts,Training,Radiation Control,Outages & Administrative Controls Affecting Quality
IR 05000254/198703324 February 1988Insp Repts 50-254/87-33 & 50-265/87-33 on 871206-880206. Violations & Deviations Noted.Major Areas Inspected: Operations,Maint & Surveillance,Ler Review,Routine Repts & Administrative Controls Affecting Radiation Control
IR 05000254/19880011 December 1988SALP Repts 50-254/88-01 & 50-265/88-01 for Apr 1987 - Sept 1988
IR 05000254/198800412 April 1988Insp Repts 50-254/88-04 & 50-265/88-04 on 880207-0402. Violations Noted.Major Areas Inspected:Operations,Maint, Surveillance,Ler Review,Routine Repts,Temporary Instructions & Administrative Controls Affecting Quality
IR 05000254/199601226 November 1996Insp Repts 50-254/96-12 & 50-265/96-12 on 960823-0923. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support
IR 05000254/19980092 July 1998Insp Repts 50-254/98-09 & 50-265/98-09 on 980401-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support
IR 05000254/19980112 July 1998Insp Repts 50-254/98-11 & 50-265/98-11 on 980504-22. Violations Noted.Major Areas Inspected:Quad Cities Safe Shutdown Analysis & Supporting Procedures
IR 05000254/199830313 April 1998Exam Repts 50-254/98-303OL & 50-265/98-303OL on 980316-20. Exam Results:All Three Applicants Passed All Portions of Respective Exams
IR 05000254/19990017 October 1999Insp Repts 50-254/99-01 & 50-265/99-01 on 990721-0908.No Violations Noted.Major Areas Inspected:Initiating Events, Mitigating Sys & Barrier Integrity
IR 05000254/199900614 May 1999Insp Repts 50-254/99-06 & 50-265/99-06 on 990307-0420.Three Violations Noted & Being Treated as non-cited Violations. Major Areas Insptected:Aspects of Licensee Operations,Maint, Engineering & Plant Support
IR 05000254/200200530 July 2002IR 05000254-02-005, IR 05000265-02-005, Exelon Nuclear, on 04/01-06/30/2002, Quad Cities Nuclear Power Station, Units 1 & 2, non-routine Evolutions, Operability Evaluations, Event follow-up, and Other
IR 05000254/200400520 July 2004IR 05000254-04-005, IR 05000265-04-005 on 04/01/2004-06/30/2004 for Quad Cities Nuclear Power Station, Units 1 & 2; Event Followup
IR 05000254/200400929 October 2004IR 05000254-04-009; 05000265-04-009; on 07/01/2004 - 09/30/2004; Quad Cities Nuclear Power Station, Units 1 & 2; Problem Identification and Resolution, Event Followup; Other Activities
IR 05000254/200500329 July 2005IR 05000254-05-003, IR 05000265-05-003 on 04/01/2005-06/30/2005 for Quad Cities Nuclear Power Station, Units 1 & 2; Operability Evaluations, Identification and Resolution of Problems, and Event Followup
IR 05000254/20080021 May 2008IR 05000254-08-002 & 05000265-08-002, on 01/01/2008 to 03/31/2008, Quad Cities Nuclear Power Station, Units 1 and 2
IR 05000254/200800410 November 2008IR 05000254-08-004, 05000265-08-004; on 07/01/2008 - 09/30/2008; Quad Cities Nuclear Power Station, Units 1 & 2; Flooding, Maintenance Risk Assessment, and Emergent Work Control
IR 05000254/201600128 April 2016NRC Integrated Inspection Report 05000254/2016001; 05000265/2016001, January 1, 2016 Through March 31, 2016
IR 05000254/202201317 November 2022Biennial Problem Identification and Resolution Inspection Report 05000254/2022013 and 05000265/2022013
IR 05000254/202301020 December 2023Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units23 March 1990Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown25 February 1992Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization8 April 1993Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels10 August 1993Thermal Stratification of Water in BWR Reactor Vessels
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications26 November 1993Potential Problems with BWR Level Instrumentation Backfill Modifications
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System24 May 1994Undetected Accumulation of Gas in Reactor Coolant System
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 115 July 1994Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel18 January 1996Partial Bypass of Shutdown Cooling Flow from Reactor Vessel
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown18 June 1996Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves5 August 1996Unexpected Opening of Multiple Safety Relief Valves
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power22 October 1996Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown11 December 1996Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown5 December 1997Recent Events Involving Reactor Coolant System Inventory Control During Shutdown
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick5 May 1999Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position27 September 2021Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position
ML02042001630 January 2002Assessment of the Impact of Appendix R Fire Protection Exemption on Fire Risk for Quad Cities Units 1 and 2 and Dresden Nuclear Power Station, Units 2 and 3
ML02212058929 July 2002Quad-Cities Units 1, Tech Spec 2.0 Safety Limits for Amendment No. 207
ML02294029610 October 2002Co., Llc. (EGC) Application for Amendment to Licenses DPR-19, DPR-25, DPR-29 & DPR-30, Related to Application of Alternative Source Term, Attachments E-2 - F-2
ML03035059412 December 2002Initial Examination 12/2002
ML0308301014 February 2003Initial Submittal of the Written Examination, for the Quad Cities Examination - Dec 2002 (Part 1of 2)
ML0308302494 February 2003Initial Submittal of the Written Examination for the Quad Cities Examination - Dec 2002 Part 2 of 2)
ML03115058529 January 1985Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations
ML03120073322 November 20022002 RO NRC Exam as Administered with Actual Answer Key
ML0335603029 December 2003Exelon/Amergen 180-Day Response to NRC Generic Letter 2003-01, Control Room Habitability.
ML04005044618 February 2004License Amendments, Lowering the Allowable Value for the Main Steam Line Low Pressure Isolation Function
ML04070078710 March 2004Technical Specifications, Amendment 215 Re Safety Limit Minimum Critical Power Ratio