SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:
THERMAL POWER shall be
- 25% RTP.
2.1.1.2 With the reactor steam dome pressure 2 785 psig and core flow 2 10% rated core flow:
For Unit 1, MCPR shall be 2 1.10 for two recirculation loop operation or 2 1.11 for single recirculation loop operation.
For Unit 2, MCPR shall be 2 1.09 for two recirculation loop operation or 2 1.10 for single recirculation loop operation.
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be
- 1345 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control *rods.
Quad Cities 1 and 2 2.0-1 Amendment No. 215