BSEP 02-0159, Application for Technical Specification Change Regarding Elimination of Post Accident Sampling System Requirements | 13 November 2002 | Application for Technical Specification Change Regarding Elimination of Post Accident Sampling System Requirements | Post Accident Monitoring Incorporated by reference |
BSEP 02-0163, Revision of Request for License Amendment - Frequency of Performance-Based Leakage Rate Testing | 8 October 2002 | Revision of Request for License Amendment - Frequency of Performance-Based Leakage Rate Testing | Non-Destructive Examination Probabilistic Risk Assessment Coatings Large early release frequency Safeguards Contingency Plan Moisture barrier Fire Protection Program |
BSEP 02-0167, September 2002 Monthly Operating Report for Brunswick Units 1 & 2 | 11 October 2002 | September 2002 Monthly Operating Report for Brunswick Units 1 & 2 | Power Uprate |
BSEP 02-0169, GE Nuclear Energy Report NEDO-33063, Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus. | 30 November 2002 | GE Nuclear Energy Report NEDO-33063, Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus. | Safe Shutdown Shutdown Margin Safety Limit Minimum Critical Power Ratio Ultimate heat sink Anticipated operational occurrence Probabilistic Risk Assessment Abnormal operational transient Flow Accelerated Corrosion Feedwater Controller Failure Large early release frequency MELLLA Stress corrosion cracking Fuel cladding Fire Protection Program Flow Induced Vibration Power Uprate |
BSEP 02-0174, Request for License Amendment Regarding Technical Specification 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ratio Safety Limit | 7 November 2002 | Request for License Amendment Regarding Technical Specification 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ratio Safety Limit | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding Affidavit |
BSEP 02-0175, Inservice Inspection Program Relief Request - Service Water System Piping Through-Wall Flaw | 25 October 2002 | Inservice Inspection Program Relief Request - Service Water System Piping Through-Wall Flaw | Non-Destructive Examination Through-Wall Leak Through Wall Leak |
BSEP 02-0177, Submittal of Technical Specification Bases Changes for Revisions 28 (Unit 1) & 25 (Unit 2) | 25 October 2002 | Submittal of Technical Specification Bases Changes for Revisions 28 (Unit 1) & 25 (Unit 2) | Missed surveillance |
BSEP 02-0181, October 2002 Monthly Operating Report for Brunswick Units 1 & 2 | 14 November 2002 | October 2002 Monthly Operating Report for Brunswick Units 1 & 2 | Power Uprate |
BSEP 02-0182, Revisions to Plant Emergency Procedures | 7 November 2002 | Revisions to Plant Emergency Procedures | |
BSEP 02-0186, Response to Request for Additional Information, Proposed License Amendment to Revise Pressure - Temperature Curve Limits | 22 November 2002 | Response to Request for Additional Information, Proposed License Amendment to Revise Pressure - Temperature Curve Limits | |
BSEP 02-0188, Letter from Edward T. O'Neil to NRC Subject: Brunswick Steam Electric Plant, Unit Nos. 1 and 2, License Nos. DPR-71 and DPR-62 NRC Service/Distribution List Addressee Change | 18 November 2002 | Letter from Edward T. O'Neil to NRC Subject: Brunswick Steam Electric Plant, Unit Nos. 1 and 2, License Nos. DPR-71 and DPR-62 NRC Service/Distribution List Addressee Change | |
BSEP 02-0189, Correction to Application for Technical Specification Change | 20 November 2002 | Correction to Application for Technical Specification Change | Offsite Dose Calculation Manual |
BSEP 02-0191, Cycle 14 Startup Report | 12 December 2002 | Cycle 14 Startup Report | Shutdown Margin |
BSEP 02-0192, November 2002 Monthly Operating Report for Brunswick Units 1 & 2 | 10 December 2002 | November 2002 Monthly Operating Report for Brunswick Units 1 & 2 | Power Uprate |
BSEP 02-0200, Submittal of TS Bases Changes for Revisions 29 (Unit 1) & 26 (Unit 2) | 12 December 2002 | Submittal of TS Bases Changes for Revisions 29 (Unit 1) & 26 (Unit 2) | |
BSEP-02-0198, Response to Request for Additional Information Regarding Request for Approval of Relief Request for Reactor Pressure Vessel Nozzle Inner Radius Volumetric Examinations | 18 December 2002 | Response to Request for Additional Information Regarding Request for Approval of Relief Request for Reactor Pressure Vessel Nozzle Inner Radius Volumetric Examinations | Non-Destructive Examination EVT-1 Unidentified leakage |
IR 05000324/2002003 | 28 October 2002 | IR 05000325-02-003 & IR 05000324-02-003, on 06/30/2002 to 09/28/2002, Brunswick, Units 1 & 2. Fire Protection | Safe Shutdown High Radiation Area Offsite Dose Calculation Manual Fire Barrier Internal Flooding Met Tower Temporary Modification Significance Determination Process Annual Radiological Environmental Operating Report Process Control Program Excess Flow Check Valve Safeguards Contingency Plan Earthquake Maintenance Rule Program Fire Protection Program |
ML022800092 | 1 October 2002 | Closed Meeting Summary - Security Issues at Brunswick, Crystal River, Shearon Harris & H.B. Robinson Plants | |
ML022820032 | 1 October 2002 | Stability Option III: Possible Successive Confirmation Count Resets | |
ML022830278 | 1 October 2002 | Part 21.21 Report Involving Stability Option III: Possible Successive Confirmation Count Resets | |
ML023190056 | 14 November 2002 | Meeting with CP&L Green, non-cited Violation for Inadequate Fire Suppression in the Cable Spreading Room at Brunswick, Units 1 & 2 | |
ML023260012 | 13 November 2002 | Petitions for Review of Orders of the NRC | |
ML023290162 | 18 November 2002 | Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not Reportable | MELLLA |
ML023300394 | 21 November 2002 | Technical Specification Pages for Amendment 250 | High Radiation Area Offsite Dose Calculation Manual Post Accident Monitoring Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent |
ML023310270 | 21 November 2002 | License Amendment 250 Regarding Containment Leakage Rate Testing Program | Probabilistic Risk Assessment Large early release frequency Stress corrosion cracking |
ML023310569 | 22 November 2002 | Part 21 Report Re General Electric Identified the Stability Option III Period Based Detection Algorithm T-Min Specification Has a Defect | |
ML023330442 | 25 November 2002 | Spectrum Technologies, Part 21 Initial Notification - Cutler-Hammer A200 NEMA Size 1 Starters | MELLLA |
ML023360069 | 22 November 2002 | Reportable Condition Stability Option III: Period Based Algorithm T Specification | |
ML023450559 | 4 December 2002 | February 5, 2003 Generic Fundamentals Examination Section, Administration of Written Operator Licensing Exam | Generic Fundamentals Examination |
ML023530500 | 13 December 2002 | License Amendment No.251, Delete Requirement to Include Check Valve MVD-V5008 in Facility Check Valve Program | Safe Shutdown Earthquake Seismically rugged |
ML051860334 | 30 December 2002 | Information Concerning a Forthcoming Shipment of Irradiated Nuclear Reactor Fuel by CP&L | |
TAC:MB5631 | 4 October 2002 | | |
TAC:MB5854 | 18 December 2002 | | |
TAC:MB6372 | 13 December 2002 | | |