Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML08029023428 January 2008Radioactive Waste Management System and Effluent Control System Description from Vogtle Electric Generating Plant, Final Safety Analysis Report, Revision 13, Burke County, GeorgiaSafe Shutdown
Boric Acid
Shutdown Margin
Offsite Dose Calculation Manual
Anticipated operational occurrence
Abnormal operational transient
Process Control Program
Earthquake
Fuel cladding
ML16330A3892 November 2016Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of PlantSafe Shutdown
Boric Acid
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Met Tower
Operating Basis Earthquake
Nondestructive Examination
VT-2
Incorporated by reference
Battery sizing
License Renewal
Earthquake
Turbine Missile
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
Power Uprate
Measurement Uncertainty Recapture
ML16330A3912 November 2016Updated Final Safety Analysis Report, Chapter 2, Hydrologic Engineering
ML16330A3922 November 2016Updated Final Safety Analysis Report, Figures 3.7.B.2-27 Through 3D-17Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
Tornado-Generated Missile
Aging Management
Earthquake
Power Operated Valves
Turbine Missile
Fuel cladding
Liquid penetrant
Scaffolding
Power change
Coast down
ML16330A3932 November 2016Updated Final Safety Analysis Report, Figures 3D-18 Through 3D-40Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML16330A3942 November 2016Updated Final Safety Analysis Report, Figures 3D-41 Through 3D-65Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML16330A3952 November 2016Updated Final Safety Analysis Report, Figures 3D-66 Through 3D-92Safe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
ML16330A3962 November 2016Updated Final Safety Analysis Report, Figures 3D-93 Through 3D-136
ML16330A3972 November 2016Updated Final Safety Analysis Report, Figures 3D-137 Through 4.3-41Safe Shutdown
Boric Acid
Shutdown Margin
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
Power change
GOTHIC
ML16330A3982 November 2016Updated Final Safety Analysis Report, Table 4.3-1 (Sheet 1 of 3) Through Figure 6-2.1-15 (Sheet 14 of 65)Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Packing leak
Stroke time
Safe Shutdown Earthquake
Weld Overlay
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Aging Management
Pressure and Temperature Limits Report
License Renewal
Liquid penetrant
Scaffolding
Power change
Unidentified leakage
Unidentified leak
Power Uprate
ML16330A3992 November 2016Updated Final Safety Analysis Report, Figure 6.2.1-15 (Sheet 15 of 65) Through Figure 6.2.1-21 (Sheet 74 of 74)
ML16330A4122 November 2016Updated Final Safety Analysis Report, Figure 7.6.5-1 (Sheet 1 of 2) Through Figure 8.3.1-1 (Sheet 4 of 34)Safe Shutdown
High winds
ML16330A4152 November 2016Updated Final Safety Analysis Report, Technical Requirements ManualBoric Acid
Time of Discovery
Shutdown Margin
Grab sample
ML16330A4162 November 2016Updated Final Safety Analysis Report, Bases for Improved Technical SpecificationsSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Qualified Offsite Circuit
Missed surveillance
Surveillance Frequency Control Program
Battery sizing
Earthquake
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
ML16330A4252 November 2016Updated Final Safety Analysis Report, Figure 8.3.1-1 (Sheet 5 of 34) Through Figure 8.3.1-1 (Sheet 24 of 34)
ML16330A4292 November 2016Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figure 8.3.1-1 (Sheet 25 of 34) Through Figure 10.2.2-2bSafe Shutdown
Boric Acid
High winds
Loop seal
High Radiation Area
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Nondestructive Examination
Emergency Lighting
FLEX
Aging Management
Tornado Missile Protection
Overtravel
License Renewal
Earthquake
Continuous fire watch
Fire Protection Program
Fire Watch
Early Warning Fire Detection
Power Uprate
ML16330A4332 November 2016Updated Final Safety Analysis Report, Section 10.3 Through Section 15.1Safe Shutdown
Boric Acid
Fitness for Duty
Shutdown Margin
High Radiation Area
Ultimate heat sink
Mission time
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
Coatings
Temporary Modification
Emergency Lighting
Aging Management
Process Control Program
Power-Operated Valves
Fuel cladding
Fire Protection Program
Unidentified leakage
Power Uprate
ML16330A4842 November 2016Updated Final Safety Analysis Report, Reference Drawings, Part 1 of 11
ML16330A4852 November 2016Updated Final Safety Analysis Report, Reference Drawings, Part 2 of 11
ML16330A4862 November 2016Updated Final Safety Analysis Report, Reference Drawings, Part 3 of 11
ML17032A1392 November 2016Updated Final Safety Analysis Report, Section 15.2Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Aging Management
License Renewal
Earthquake
Power-Operated Valves
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Scaffolding
ML17032A1432 November 2016Updated Final Safety Analysis Report, Section 15.2 Decrease in Heat Removal by the Secondary System, RedactedSafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Fire Barrier
Safe Shutdown Earthquake
Weld Overlay
Coatings
Nondestructive Examination
Incorporated by reference
Condition Adverse to Quality
Aging Management
License Renewal
Earthquake
Fuel cladding
Fire Protection Program
Power change
Coast down
Operability Assessment
Power Uprate
Measurement Uncertainty Recapture
Failure to Scram
ML17032A1442 November 2016Updated Final Safety Analysis Report, Reference Drawings, Part 6 of 11, Redacted
ML17032A1462 November 2016Updated Final Safety Analysis Report, Reference Drawings, Part 7 of 11, Redacted
ML17032A1492 November 2016Updated Final Safety Analysis Report, Reference Drawings, Part 8 of 11, Redacted
ML17032A1552 November 2016Updated Final Safety Analysis Report, Reference Drawings, Part 9 of 11, Redacted
ML17032A1562 November 2016Updated Final Safety Analysis Report, Reference Drawings, Part 10 of 11, Redacted
ML17032A1572 November 2016Updated Final Safety Analysis Report, Reference Drawings, Part 11 of 11, Redacted
ML17032A1602 November 2016Updated Final Safety Analysis Report, Reference Drawings, Part 4 of 11, Redacted
ML21102A22230 March 20213 to Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments ReportPost Accident Monitoring
Internal Flooding
Temporary Modification
Fuel cladding
Accident Tolerant Fuel
ML21102A22430 March 20213 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (Part 2) & Chapter 8, Electric Power (Part 1)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Reactor Vessel Water Level
Fire Barrier
Anticipated operational occurrence
Water Inventory Control
Operator Manual Action
FLEX
Aging Management
Surveillance Frequency Control Program
Open Phase Condition
Residual voltage transfer
Power change
ML21102A22530 March 20213 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 2)Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
Tornado-Generated Missile
Aging Management
Earthquake
Power Operated Valves
Turbine Missile
Fuel cladding
Liquid penetrant
Scaffolding
Power change
Coast down
GOTHIC
ML21102A22730 March 20213 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (Part 2); & Chapters 11, 12, 13, 14, 15, Accident Analyses (Part 1)Safe Shutdown
Boric Acid
Fitness for Duty
Shutdown Margin
High Radiation Area
Ultimate heat sink
Mission time
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Temporary Modification
Emergency Lighting
Incorporated by reference
Aging Management
Surveillance Frequency Control Program
Process Control Program
License Renewal
Earthquake
Power-Operated Valves
Fuel cladding
Fire Protection Program
Unidentified leakage
Power Uprate
Measurement Uncertainty Recapture
Exclusive Use
ML21102A22830 March 20213 to Updated Final Safety Analysis Report, Chapter 4, Reactor (Part 2); Chapter 5, Reactor Coolant System and Connected Systems; & Chapter 6, Engineered Safety Features (Part 1)Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Loop seal
Packing leak
Stroke time
Safe Shutdown Earthquake
Weld Overlay
Post Accident Monitoring
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Aging Management
Pressure and Temperature Limits Report
License Renewal
Earthquake
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Scaffolding
Power change
Unidentified leakage
Unidentified leak
Power Uprate
ML21102A22930 March 20213 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (Part 2); & Chapters 16, 17, 18, 19; Table of Contents; Revision 23 to List of Effective PagesSafe Shutdown
Boric Acid
Health Physics Network
Shutdown Margin
Loop seal
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Weld Overlay
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Condition Adverse to Quality
Aging Management
Time Critical Operator Action
License Renewal
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Power change
Coast down
GOTHIC
Operability Assessment
Unidentified leakage
Power Uprate
Measurement Uncertainty Recapture
Failure to Scram
ML21102A23130 March 20213 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 4)Safe Shutdown Earthquake
Operating Basis Earthquake
ML21102A23230 March 20213 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant & Chapter 2, Site Characteristics (Part 1)Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Met Tower
Operating Basis Earthquake
Nondestructive Examination
VT-2
Incorporated by reference
Abnormal operational transient
Surveillance Frequency Control Program
Battery sizing
License Renewal
Earthquake
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
Power Uprate
Measurement Uncertainty Recapture
ML21102A23430 March 20213 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 3) & Chapter 7, Instrumentation and Controls (Part 1)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Packing leak
High Radiation Area
Ultimate heat sink
Grab sample
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
FLEX
Tornado-Generated Missile
Aging Management
License Renewal
Earthquake
Power-Operated Valves
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Scaffolding
Power Uprate
ML21102A23530 March 20213 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 2)
ML21102A23930 March 20213 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 3)Safe Shutdown Earthquake
Operating Basis Earthquake
ML21102A24030 March 20213 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (Part 2) & Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 1)Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Tornado-Generated Missile
Tornado Missile Protection
Design basis earthquake
Tornado Missile Risk Evaluator
Earthquake
Turbine Missile
Through-Wall Leakage
Fire Protection Program
Power change
Weak link
ML21102A24130 March 20213 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Part 2)
ML21102A24230 March 20213 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 7) & Chapter 4, Reactor (Part 1)Safe Shutdown
Boric Acid
Shutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Fuel cladding
Power change
GOTHIC
ML21102A24530 March 20213 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 6)
ML21102A24730 March 20213 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 5)Safe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
ML21179A09315 June 20210 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary SystemsHot Short
Safe Shutdown
Boric Acid
Health Physics Network
Shutdown Margin
Loop seal
High Radiation Area
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Squib
Emergency Lighting
FLEX
Abnormal operational transient
Overtravel
Earthquake
Control of Heavy Loads
Fire Protection Program
Scaffolding
Power change
Unidentified leak
Siren
Exclusive Use
ML21179A09615 June 20210 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and ControlsSafe Shutdown
Boric Acid
Shutdown Margin
Grab sample
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Squib
Water level shrink
Incorporated by reference
Fuel cladding
Power change
ML21179A09815 June 2021Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual SubmittalHot Short
Safe Shutdown
Shutdown Margin
High Radiation Area
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Squib
Cyber Security
Emergency Lighting
Incorporated by reference
Earthquake
Fire Protection Program
Fire Watch
ML21179A09915 June 20210 to Updated Final Safety Analysis Report, Chapter 8, Electric PowerSafe Shutdown
Fire Barrier
Safe Shutdown Earthquake
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Emergency Lighting
Residual voltage transfer
Maintenance Rule Program
Accidental discharge
Offsite Circuit
Coast down
ML21179A10015 June 20210 to Updated Final Safety Analysis Report, Chapter 16, Technical SpecificationsProbabilistic Risk Assessment
Incorporated by reference