Issue date | Title | Topic | |
---|---|---|---|
L-08-231, Updated Final Safety Analysis Report, Rev. 17, List of Effective Pages | 20 November 2008 | Updated Final Safety Analysis Report, Rev. 17, List of Effective Pages | |
L-17-029, Redacted - Beaver Valley Power Station, Unit 1, Revision 30 to Updated Final Safety Analysis Report, Section 8, Electrical Systems | 21 April 2017 | Redacted - Beaver Valley Power Station, Unit 1, Revision 30 to Updated Final Safety Analysis Report, Section 8, Electrical Systems | Safe Shutdown Boric Acid Emergency Lighting Design basis earthquake Earthquake |
L-17-262, First Energy Nuclear Operating Co., Quality Assurance Program Manual, Revision 21 | 20 November 2017 | First Energy Nuclear Operating Co., Quality Assurance Program Manual, Revision 21 | Offsite Dose Calculation Manual Nondestructive Examination Temporary Modification Condition Adverse to Quality Aging Management Process Control Program License Renewal Fire Protection Program Grace period |
L-18-144, Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report | 13 November 2018 | Submittal of Beaver Valley Unit 1, Revision 31 to Updated Final Safety Analysis Report | |
L-20-051, Technical Specification Bases, Revision 37, Reactor Coolant System (RCS) (Part 2 of 2) | 20 May 2020 | Technical Specification Bases, Revision 37, Reactor Coolant System (RCS) (Part 2 of 2) | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Time to boil Post Accident Monitoring Qualified Offsite Circuit Surveillance Frequency Control Program Battery sizing Earthquake Power Operated Valves Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Power change |
L-20-186, 5 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | 23 November 2020 | 5 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | Safe Shutdown Boric Acid High Radiation Area Anticipated operational occurrence Emergency Lighting Tornado Missile Protection Power Uprate |
L-21-164, 3 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations | 22 November 2021 | 3 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations | |
L-22-058, Submittal of Revision 26 to Updated Final Safety Analysis Report | 18 May 2022 | Submittal of Revision 26 to Updated Final Safety Analysis Report | |
ML072250025 | 8 August 2007 | Responses to a Request for Additional Information (RAI) Dated July 3, 2007 in Support of License Amendment Request Nos. 334 and 205 | |
ML14339A410 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 4, Reactor | Boric Acid Shutdown Margin Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Thermoset Fuel cladding Power change Flow Induced Vibration |
ML14339A411 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 5, Reactor Coolant System and Connected Systems | Safe Shutdown Boric Acid Loop seal Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination License Renewal Liquid penetrant Pressure Boundary Leakage Pressure boundary leak Flow Induced Vibration Unidentified leakage |
ML14339A412 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 2, Engineered Safety Features | |
ML14339A413 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, List of Effective Pages | |
ML14339A414 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 1, Introduction and General Description of Plant | Safe Shutdown Boric Acid Ultimate heat sink Grab sample Offsite Dose Calculation Manual Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Incorporated by reference Finite Element Analysis Process Control Program Earthquake Control of Heavy Loads Turbine Missile Fuel cladding Pressure Boundary Leakage Fire Protection Program Uranium Hexafluoride Unidentified leakage Measurement Uncertainty Recapture |
ML14339A415 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 2, the Site, Part 1 of 2 | Safe Shutdown Boric Acid Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Hydrostatic Frazil ice Earthquake Biofouling |
ML14339A416 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 2, the Site, Part 2 of 2 | |
ML14339A418 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 3, Design of Structures, Components, Equipment, and Systems, Part 2 of 2 | |
ML14339A420 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 7, Instrumentation and Controls | |
ML14339A429 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 11, Radioactive Waste Management | Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Process Control Program Fuel cladding Power Uprate |
ML14339A430 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 12, Radiation Protection | Safe Shutdown Boric Acid High Radiation Area Anticipated operational occurrence Emergency Lighting Tornado Missile Protection Power Uprate |
ML14339A431 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 8, Electric Power | Safe Shutdown Boric Acid Loop seal Fire Barrier Slow transfer Safe Shutdown Earthquake Hydrostatic Tornado-Generated Missile Design basis earthquake Overtravel License Renewal Earthquake Offsite Circuit |
ML14339A433 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 9, Auxiliary Systems | |
ML14339A434 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 10, Steam and Power Conversion System | |
ML14339A435 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 13, Conduct of Operations | Safe Shutdown Temporary Modification Incorporated by reference Scaffolding |
ML14339A437 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Chapter 14, Initial Test Program | Boric Acid Shutdown Margin Stroke time Hydrostatic Emergency Lighting Power-Operated Valves Power change Unidentified leak |
ML14339A438 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 15, Accident Analysis | Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Emergency Lighting Earthquake Deep Dose Equivalent Fuel cladding Coast down |
ML14339A439 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 16, Technical Specifications | Loop seal Pressure and Temperature Limits Report |
ML14339A440 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 17, Quality Assurance | |
ML14339A453 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 18, Human Factors Engineering | |
ML14339A454 | 24 November 2014 | Updated Final Safety Analysis Report, Revision 21, Section 19, Managing the Effects of Component Aging | Boric Acid Non-Destructive Examination Fire Barrier Safe Shutdown Earthquake Weld Overlay Coatings Incorporated by reference Aging Management Design basis earthquake License Renewal Earthquake Control of Heavy Loads Biofouling Fire Protection Program Power Uprate |
ML16298A304 | 24 October 2016 | Updated Final Safety Analysis Report (Ufsar), Chapter 16, Revision 11 Redacted, Table of Contents | Loop seal |
ML16298A305 | 24 October 2016 | 020 UFSAR Section 17 - Redacted, Revision 13 | |
ML16298A306 | 24 October 2016 | 021 UFSAR Section 18_REDACTED | |
ML17117A435 | 21 April 2017 | Submittal of Revision 30 to Updated Final Safety Analysis Report | Aging Management License Renewal Fire Protection Program |
ML17117A438 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Summary List of Effective Pages | |
ML17117A439 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 1, Introduction and Summary | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Coatings Nondestructive Examination Design basis earthquake Earthquake Fuel cladding Power change Flow Induced Vibration |
ML17117A441 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 3, Reactor | Boric Acid Shutdown Margin Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Design basis earthquake Earthquake Fuel cladding Power change Flow Induced Vibration |
ML17117A442 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 4, Reactor Coolant System | |
ML17117A443 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 5, Containment Systems | |
ML17117A444 | 21 April 2017 | 007 Beaver Valley Power Station, Unit 1, Revision 30 to Updated Final Safety Analysis Report, Section 6, Engineered Safety Features | |
ML17117A445 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 7, Instrumentation and Controls | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Emergency Lighting Design basis earthquake Earthquake Power change Flow Induced Vibration |
ML17117A447 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 9, Auxiliary and Emergency System | |
ML17117A449 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 10, Steam and Power Conversion System | Safe Shutdown Stroke time Hydrostatic Earthquake Turbine Missile |
ML17117A450 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 11, Radioactive Wastes and Radiation Protection | High Radiation Area |
ML17117A451 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 12, Conduct of Operations | |
ML17117A452 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 13, Initial Tests and Operation | Boric Acid Hydrostatic Liquid penetrant |
ML17117A453 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 14, Safety Analysis | |
ML17117A454 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 15, Technical Specifications and Bases | Pressure and Temperature Limits Report |
ML17117A455 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Section 16, Managing the Effects of Component Aging | |
ML17117A456 | 21 April 2017 | Revision 30 to Updated Final Safety Analysis Report, Appendix a, Quality Assurance | Safe Shutdown Boric Acid Nondestructive Examination |