BSEP 15-0090, Response to Request for Additional Information Regarding License Amendment Request to Adopt Topical Report ANP-10298P-A, Revision 1 | 5 November 2015 | Response to Request for Additional Information Regarding License Amendment Request to Adopt Topical Report ANP-10298P-A, Revision 1 | Anticipated operational occurrence |
BSEP 16-0070, Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program | 15 August 2016 | Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program | Probabilistic Risk Assessment Surveillance Frequency Control Program |
BSEP 16-0072, Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program | 4 August 2016 | Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program | Surveillance Frequency Control Program |
BSEP 16-0100, Clarification of Responses for Requests for Additional Information License Amendment Request for Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program | 1 November 2016 | Clarification of Responses for Requests for Additional Information License Amendment Request for Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program | High winds Fire Barrier Internal Flooding Surveillance Frequency Control Program Large early release frequency |
BSEP 16-0101, Response to Request for Supplemental Information for License Amendment Request Regarding Core Flow Operating Range Expansion | 9 November 2016 | Response to Request for Supplemental Information for License Amendment Request Regarding Core Flow Operating Range Expansion | Safety Limit Minimum Critical Power Ratio MELLLA Power Uprate Affidavit |
BSEP 16-0104, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident | 15 December 2016 | Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident | Safe Shutdown Earthquake Probabilistic Risk Assessment |
BSEP 16-0109, Response to Request for Additional Information, Revision to Requested Implementation Schedule, and Status Update - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to Licensee- | 17 November 2016 | Response to Request for Additional Information, Revision to Requested Implementation Schedule, and Status Update - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to Licensee- | Internal Flooding Surveillance Frequency Control Program |
BSEP 16-0112, (Bsep), Unit Nos. 1 and 2 - Individual Plant Examination of External Events (IPEEE) Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding ... | 15 December 2016 | (Bsep), Unit Nos. 1 and 2 - Individual Plant Examination of External Events (IPEEE) Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding ... | Probabilistic Risk Assessment Fukushima Dai-Ichi |
BSEP 16-0113, High Frequency Supplement to Seismic Hazard Screening Report, Response to Nrg Request for Information Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | 15 December 2016 | High Frequency Supplement to Seismic Hazard Screening Report, Response to Nrg Request for Information Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
BSEP 17-0019, Enclosure 2 - Response to Request for Additional Information Regarding License Amendment Request for Reactor Protection System (RPS) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2. | 1 March 2017 | Enclosure 2 - Response to Request for Additional Information Regarding License Amendment Request for Reactor Protection System (RPS) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.2 an | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
BSEP 17-0026, Response to Request for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423,Revision 1, Technical Specifications End States, NEDC-32988-A. | 25 March 2017 | Response to Request for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423,Revision 1, Technical Specifications End States, NEDC-32988-A. | Backfit |
BSEP 17-0029, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion | 6 April 2017 | Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion | Power Uprate |
BSEP 17-0048, Clarification of Responses for Requests for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specification End States.. | 24 May 2017 | Clarification of Responses for Requests for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specification End States.. | |
BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. | 24 November 2017 | Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. | FLEX Overspeed trip |
BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | 4 January 2018 | Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | Water Inventory Control |
BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. | 4 December 2017 | Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. | Safe Shutdown |
BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. | 6 December 2017 | Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. | Safe Shutdown High winds Mission time Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Large early release frequency Continuous fire watch Very Early Warning Fire Detection |
BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. | 7 December 2017 | Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. | High winds Probabilistic Risk Assessment FLEX B.5.b |
BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure | 5 February 2018 | Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Abnormal operational transient Flow Accelerated Corrosion MELLLA Fuel cladding Power Uprate Exclusive Use Affidavit Water rod |
BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion | 29 March 2018 | Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion | Time Critical Operator Action |
BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion | 10 April 2018 | Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion | Affidavit |
BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations | 11 April 2018 | Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations | License Renewal |
BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. | 24 April 2018 | Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. | Hydrostatic Power Uprate |
ML15350A096 | 23 November 2015 | Response to Request for Additional Information Re Adoption of Emergency Action Level Scheme Per NEI 99-01, Rev. 6 | |
ML16209A225 | 13 July 2016 | Response to Request for Additional Information Regarding License Amendment Request for Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency License Renewal GOTHIC |
ML16330A505 | 9 November 2016 | Response to Request for Supplemental Information in Support of MELLLA + LAR, Non-Proprietary Information - Class I (Public) | Safety Limit Minimum Critical Power Ratio MELLLA |
ML17087A263 | 1 March 2017 | Response to Request for Additional Information Regarding License Amendment Request for Reactor Protection System (RPS) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance... | |
ML18075A330 | 1 March 2018 | Response to Request for Additional Information SNPB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865) | Exclusive Use Affidavit |
RA-16-0001, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation. | 18 January 2016 | Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation. | Time of Discovery Operability Determination |
RA-16-0027, Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations | 14 July 2016 | Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
RA-16-0035, Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation | 3 October 2016 | Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation | |
RA-17-0039, Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001) | 9 August 2017 | Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001) | Finite Element Analysis Stress corrosion cracking Weak link |
RA-18-0100, Request for License Amendment Regarding Application of Advanced Framatome Methodologies | 11 October 2018 | Request for License Amendment Regarding Application of Advanced Framatome Methodologies | Anticipated operational occurrence Power Uprate Affidavit |
RA-18-0144, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Report | 27 September 2018 | Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Report | Fukushima Dai-Ichi Flooding Focused Evaluation |
RA-18-0163, Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report | 27 September 2018 | Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report | Shutdown Margin Hydrostatic Finite Element Analysis Pressure and Temperature Limits Report License Renewal Power Uprate Affidavit |
RA-18-0178, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for ... | 2 November 2018 | Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for ... | High winds Mission time Fire Barrier Tornado Missile Internal Flooding Hydrostatic Probabilistic Risk Assessment FLEX B.5.b Tornado Generated Missile Surveillance Frequency Control Program Large early release frequency TORMIS Risk-Informed Steering Committee Turbine Missile Continuous fire watch Fire Watch GOTHIC |
RA-18-0246, Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature .. | 11 December 2018 | Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature .. | Pressure and Temperature Limits Report |
RA-19-0010, Response to NRC RAI Re Application to Adapt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | 13 February 2019 | Response to NRC RAI Re Application to Adapt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment FLEX Continuous fire watch Fire Watch |
RA-19-0089, Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure... | 8 February 2019 | Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure... | Safe Shutdown Ultimate heat sink Qualified Offsite Circuit Offsite Circuit |
RA-19-0150, Response to Request for Additional Information - Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation | 3 April 2019 | Response to Request for Additional Information - Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation | Grace period |
RA-19-0152, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,Systems, and Components (Sscs) for Nuclear Power Reactors. | 8 April 2019 | Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,Systems, and Components (Sscs) for Nuclear Power Reactors. | High winds Mission time Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Large early release frequency TORMIS Continuous fire watch Fire Watch GOTHIC |
RA-19-0217, Supplement to Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ... | 16 May 2019 | Supplement to Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ... | Safe Shutdown Ultimate heat sink Qualified Offsite Circuit Offsite Circuit |
RA-19-0240, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request | 29 May 2019 | Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request | Feedwater Controller Failure MELLLA Fuel cladding Power Uprate Affidavit |
RA-19-0241, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request | 18 June 2019 | Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request | Anticipated operational occurrence Feedwater Controller Failure MELLLA Fuel cladding Power Uprate Affidavit |
RA-19-0295, Response to Request for Additional Information - License Amendment Request to Revise Units 1 & 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 25 July 2019 | Response to Request for Additional Information - License Amendment Request to Revise Units 1 & 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | |
RA-19-0380, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request | 17 October 2019 | Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request | |
RA-20-0324, Response to Request for Additional Information for Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements | 27 October 2020 | Response to Request for Additional Information for Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements | |
RA-20-0364, 1 & 2 - Response to RAI for License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors Categorization Process | 24 November 2020 | 1 & 2 - Response to RAI for License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors Categorization Process | Safe Shutdown High winds Hydrostatic Probabilistic Risk Assessment Flooding Focused Evaluation |
RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4 | 11 February 2021 | Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)( | |
RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan | 11 March 2021 | 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan | Safe Shutdown Health Physics Network Offsite Dose Calculation Manual Tornado Missile Met Tower Emergency Lighting Incorporated by reference FLEX Open House Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Siren Overexposure |