ML20136E9192 January 1986PNS-I-86-001:on 860102,contract Const Security Force Received Bomb Threat from Unidentified Caller.Contingency Plan Implemented.Drywell & Reactor Bldg Searched W/Negative Results.Security Increased Due to Lay Offs of Craft Workers
ML20198R6165 June 1986PNS-I-86-007:on 860605,two 35-mm Photographic Film Containers Found in Contractor Employee Lunch Box During Routine Search of Vehicle.One Container Contained Marijuana. Unknown Substance in Pill Form Found in Second Container
ML20207G53630 December 1977PNO-77-227:on 771230,crane Operator Employed at Hope Creek Construction Site Killed While Assisting in Unloading of Gravel from Barges.Worker Apparently Fell from Pier Into Water.No Witnesses to Accident.Body Recovered from Water
ML20213G73412 November 1986PNO-I-DRILL86-1:during Fuel Handling in Spent Fuel Pool to Inspect Fuel Suspected to Contain Failed Fuel,Handling Machine Became Stuck in Upright Position W/Fuel in Machine. Fuel Remained Submerged in Pool
PNO-I-85-039, on 850522,several Fires Identified & Extinguished Outside Facility Structure & Inside Industrial Security Area.Caused by Apparent Arson.Investigation Initiated & Security Measures Increased23 May 1985PNO-I-85-039:on 850522,several Fires Identified & Extinguished Outside Facility Structure & Inside Industrial Security Area.Caused by Apparent Arson.Investigation Initiated & Security Measures Increased
PNO-I-85-064, on 850904,carbon Dioxide Fire Protection Sys Initiation Occurred,Causing Discharge of 17 Tons of Liquid Cardox Into Fuel Storage Area.Plant Evacuated & Search & Rescue Stations Established4 September 1985PNO-I-85-064:on 850904,carbon Dioxide Fire Protection Sys Initiation Occurred,Causing Discharge of 17 Tons of Liquid Cardox Into Fuel Storage Area.Plant Evacuated & Search & Rescue Stations Established
PNO-I-85-064A, on 850904,gas Discharged Into Diesel Generator Through Fire Suppression Sys Nozzles & Drifted to Access Bay for Four Fuel Tank Rooms & Adjacent Areas.Cause Unknown. Investigation Underway5 September 1985PNO-I-85-064A:on 850904,gas Discharged Into Diesel Generator Through Fire Suppression Sys Nozzles & Drifted to Access Bay for Four Fuel Tank Rooms & Adjacent Areas.Cause Unknown. Investigation Underway
PNO-I-86-027, on 860411,NRC Issued License NPF-50,authorizing Operation of Reactor at Max 3,293 Mwt.Fuel Loading Planned for 860412 Delayed Due to Problems W/Two of Four Source Range Monitors.Loading Planned for 86041414 April 1986PNO-I-86-027:on 860411,NRC Issued License NPF-50,authorizing Operation of Reactor at Max 3,293 Mwt.Fuel Loading Planned for 860412 Delayed Due to Problems W/Two of Four Source Range Monitors.Loading Planned for 860414
PNO-I-86-036, on 860502,facility Lost Offsite Power to Vital Buses While Two of Four Emergency Diesel Generators Out of Svc.Caused by Technician Error.Offsite Power Restored & Alert Terminated5 May 1986PNO-I-86-036:on 860502,facility Lost Offsite Power to Vital Buses While Two of Four Emergency Diesel Generators Out of Svc.Caused by Technician Error.Offsite Power Restored & Alert Terminated
PNO-I-86-045, on 860628,reactor Achieved Criticality.Initial Criticality Followed by Full Core Shutdown Margin Demonstration & source-range Detector Nonsaturation demonstration.Twenty-fourth Criticality Coverage Provided30 June 1986PNO-I-86-045:on 860628,reactor Achieved Criticality.Initial Criticality Followed by Full Core Shutdown Margin Demonstration & source-range Detector Nonsaturation demonstration.Twenty-fourth Criticality Coverage ProvidedShutdown Margin
PNO-I-86-047, on 860706,alert Declared When Sabotage Suspected as Possible Cause for Initiation of Diesel Generator Bldg Fire Suppression Sys When Water Deluge Valve Opened.Caused by Failed Heat Sensor.Alert Terminated7 July 1986PNO-I-86-047:on 860706,alert Declared When Sabotage Suspected as Possible Cause for Initiation of Diesel Generator Bldg Fire Suppression Sys When Water Deluge Valve Opened.Caused by Failed Heat Sensor.Alert Terminated
PNO-I-86-063, on 860808,licensee Identified Deficiency That Would Prevent Torus Reactor Bldg Vacuum Relief Valves from Fulfilling Safety Function.Control Logic Reversed for Valves Causing Valves to Isolate on Negative Pressure Condition8 August 1986PNO-I-86-063:on 860808,licensee Identified Deficiency That Would Prevent Torus Reactor Bldg Vacuum Relief Valves from Fulfilling Safety Function.Control Logic Reversed for Valves Causing Valves to Isolate on Negative Pressure Condition
PNO-I-86-078, on 860911 & 19,during Loss of Offsite Power (LOP) Testing,Numerous Equipment Failures Identified.Cause Unknown.Licensee to Seek NRC Concurrence Prior to Initiating LOP Testing & Reactor Restart24 September 1986PNO-I-86-078:on 860911 & 19,during Loss of Offsite Power (LOP) Testing,Numerous Equipment Failures Identified.Cause Unknown.Licensee to Seek NRC Concurrence Prior to Initiating LOP Testing & Reactor Restart
PNO-I-87-072, on 870730,reactor Scrammed Due to Low Reactor Vessel Water Level After Power Lost to Reactor Feedwater Control Circuit.Caused by Failed Transfer Circuit to Instrumentation Inverter.Investigation Continuing30 July 1987PNO-I-87-072:on 870730,reactor Scrammed Due to Low Reactor Vessel Water Level After Power Lost to Reactor Feedwater Control Circuit.Caused by Failed Transfer Circuit to Instrumentation Inverter.Investigation ContinuingReactor Vessel Water Level
PNO-I-87-094, on 871013,explosion & Fire Occurred in Main Transformer Phase a Causing Turbine Generator Trip.Cause of Fire Unknown.Licensee Fire Dept Responded & Automatic Water Deluge Sys initiated.One-wk Outage Anticipated13 October 1987PNO-I-87-094:on 871013,explosion & Fire Occurred in Main Transformer Phase a Causing Turbine Generator Trip.Cause of Fire Unknown.Licensee Fire Dept Responded & Automatic Water Deluge Sys initiated.One-wk Outage Anticipated
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom16 February 1988PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom
PNO-I-88-115, on 881101,reactor Scrammed from Full Power Due to Main Turbine Trip.Caused by Loss of Electrical Field on Main Generator.Reactor Stabilized in Shutdown Condition & Entered Into 5-day Outage,Including Deinerting of Drywell2 November 1988PNO-I-88-115:on 881101,reactor Scrammed from Full Power Due to Main Turbine Trip.Caused by Loss of Electrical Field on Main Generator.Reactor Stabilized in Shutdown Condition & Entered Into 5-day Outage,Including Deinerting of DrywellReactor Vessel Water Level
PNO-I-93-062, on 931112,informed That Current 30-day Contract Extension W/United Govt Security Officers of America Will Expire on 931115.Licensee Indicated That They Have Adequate Personnel Trained & Available to Satisfy Security Plan12 November 1993PNO-I-93-062:on 931112,informed That Current 30-day Contract Extension W/United Govt Security Officers of America Will Expire on 931115.Licensee Indicated That They Have Adequate Personnel Trained & Available to Satisfy Security Plan
PNO-I-98-053, on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie16 November 1998PNO-I-98-053:on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie
PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power16 September 1999PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power