IR 05000225/2005003 | 4 June 1985 | Insp Rept 50-458/85-18 on 850225-0503.Deviation Noted: Ranges of Display Instrumentation for HPCS Flow & RHR Svc Water Flow Contrary to Table 7.5-1 of Fsar,Amend 11, Dtd Jan 1984 | |
IR 05000311/2004019 | 10 May 1985 | Insp Rept 50-458/85-22 on 850311-0419.No Violation or Deviation Noted.Major Areas Inspected:Maint Program,Test & Measurement Equipment,Surveillance Testing & Calibr Control Program,Design Changes & Mods & Document Control | Temporary Modification Fire Watch |
IR 05000311/2005017 | 1 August 1985 | Insp Rept 50-458/85-19 on 850311-0517.Violation Noted: Failure to Incorporate Engineering & Design Coordination Rept Info Into Drawings & Use External Historical Data in Evaluation of Suppliers | Squib Scaffolding |
IR 05000311/2008010 | 23 January 1986 | Insp Rept 50-458/85-09 on 850311-0810.Violations Noted: Failure to Adequately Check Calculations,Document & Verify Assumptions & Provide Basis for Design Input | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
IR 05000401/2008009 | 17 September 1985 | Insp Rept 50-458/85-29 on 850401-0809.Violation Noted: Failure to Assure Conformance of safety-related Structural Steel Welds W/Requirements of Aws D1.1-75 Structural Steel Welding Code | Loctite |
IR 05000415/2006027 | 15 August 1985 | Insp Rept 50-458/85-33 on 850415-0627.Violation Noted: Failure to Adequately Document Changes to Insp Rept Results | |
IR 05000458/1978005 | 22 September 1978 | Insp Rept 50-458/78-05 on 780905-08.No Noncompliance Noted. Major Areas Inspected:Previously Identified Unresolved Items & Const Deficiency Rept Re Nonconforming Rebar | |
IR 05000458/1982002 | 19 May 1982 | IE Insp Rept 50-458/82-02 on 820419-23.No Noncompliance Noted.Major Areas Inspected:Review of QA Program for Welding & Nondestructive Exam of safety-related Piping & Observation of Work for Subj Piping | |
IR 05000458/1982006 | 15 July 1982 | IE Insp Rept 50-458/82-06 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Previous Insp Findings,Qa Program Review & Work for Erection/Installation & Welding of safety-related Structural Steel & Supports | |
IR 05000458/1985027 | 3 June 1985 | Insp Rept 50-458/85-27 on 850401-04.No Violation or Deviation Noted.Major Areas Inspected:Implementation of Fire Protection Program & Compliance w/10CFR50,App R Re Safe Shutdown Per FSAR Commitments & SER Evaluation | Safe Shutdown Fire Barrier Emergency Lighting Fire Protection Program Fire Watch |
IR 05000458/1985032 | 5 August 1985 | Insp Rept 50-458/85-32 on 850624-28.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Program,Tmi Action Items & Emergency Preparedness Activities | Loop seal Grab sample |
IR 05000458/1985036 | 19 June 1985 | Insp Rept 50-458/85-36 on 850506-10.No Violation or Deviation Noted.Major Areas Inspected:Training,Organization, Coordination W/Offsite Groups,Emergency Procedures & Emergency Response Facilities & Equipment | |
IR 05000458/1985037 | 29 May 1985 | Insp Rept 50-458/85-37 on 850506-10.No Violation or Deviation Noted.Major Areas Inspected:Correction of Deficiencies Previously Identified Per 10CFR50.55(e) | |
IR 05000458/1985038 | 17 July 1985 | Insp Rept 50-458/85-38 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Test Witnessing,Preoperational Test Results Evaluation & TMI Action Items | |
IR 05000458/1985039 | 20 June 1985 | Insp Rept 50-458/85-39 on 850520-25.No Violation or Deviation Noted.Major Areas Inspected:Preoperational Test Performance & Results & Licensee Actions on Previous Insp Findings & 10CFR50.55(e) Items | |
IR 05000458/1985041 | 29 August 1985 | Insp Rept 50-458/85-41 on 850522-0712.No Violation or Deviation Noted.Major Areas Inspected:Followup on Previous Findings,Comparison of as-built Plant to FSAR Description, Verification of as-built Electrical Routing & Terminations | Safe Shutdown Fire Barrier Emergency Lighting Fire Watch |
IR 05000458/1985044 | 12 September 1985 | Insp Rept 50-458/85-44 on 850603-0726.No Violations or Deviations Identified.Major Areas Inspected:Open Significant Const Deficiencies Per 10CFR50.55(e) & Previous Insp Findings | Scram Discharge Volume Grace period |
IR 05000458/1985045 | 17 July 1985 | Insp Rept 50-458/85-45 on 850520-0603.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings & Site Tours | Temporary Modification |
IR 05000458/1985046 | 29 July 1985 | Insp Rept 50-458/85-46 on 850603-07.No Violations or Deviations Noted.Major Areas Inspected:Radwaste Mgt & Transportation Activities,Including Organization,Audits & Process Control Plan | Process Control Program |
IR 05000458/1985047 | 19 July 1985 | Insp Rept 50-458/85-47 on 850610-14.No Violations or Deviations Noted.Major Areas Inspected:Chemistry/ Radiochemistry Program,Including Organization,Staffing,Staff Qualifications,Facilities & Equipment & QA Program | |
IR 05000458/1985048 | 9 August 1985 | Insp Rept 50-458/85-48 on 850624-28.No Violations or Deviations Identified.Major Areas Inspected:Preoperational Test Results Evaluation & Operating Procedures | |
IR 05000458/1985050 | 28 August 1985 | Insp Rept 50-458/85-50 on 850624-29.No Violation or Deviation Noted.Major Areas Inspected:Alarm Stations, Security Sys Power Supply,Access control-personnel & Access control-packages.Details Withheld (Ref 10CFR73.21) | |
IR 05000458/1985052 | 23 August 1985 | Insp Rept 50-458/85-52 on 850708-12.No Violation or Deviation Noted.Major Areas Inspected:Emergency & Abnormal Operating Procedures,Ie Bulletin & post-TMI Action Plan Requirements Followup & Corrective Actions Taken | Fuel cladding |
IR 05000458/1985053 | 4 September 1985 | Insp Rept 50-458/85-53 on 850805-09.No Violation or Deviation Noted.Major Areas Inspected:Radiation Protection Training,Selected TMI Action Items,Chemistry Sample Stations,Radwaste Processing Sys & Environ Program | Grab sample Process Control Program |
IR 05000458/1985054 | 4 October 1985 | Insp Rept 50-458/85-54 on 850722-26 & 31-0802.No Violation or Deviation Noted.Major Areas Inspected: Preoperational Test Results Evaluation & IE Bulletin Followup | |
IR 05000458/1985055 | 13 September 1985 | Insp Rept 50-458/85-55 on 850715-19 & 29-0801.No Violation or Deviation Noted.Major Areas Inspected:Mgt Effectiveness, Security Organization,Records & Repts & Lock & Key Controls. Details Withheld (Ref 10CFR73.21) | |
IR 05000458/1985056 | 30 August 1985 | Special Insp Rept 50-458/85-56 on 850715-17.No Violations or Deviations Noted.Major Areas Inspected:Followup in Findings from Emergency Appraisal & 1985 Emergency Exercise | Siren |
IR 05000458/1985057 | 24 August 1985 | Insp Rept 50-458/85-57 on 850722-26.No Violation or Deviation Noted.Major Areas Inspected:Training Program, Chemistry/Radiochemistry Program,Facilities & Equipment & Administrative & Analytical Procedures | |
IR 05000458/1985058 | 23 August 1985 | Insp Rept 50-458/85-58 on 850722-26.No Violation or Deviation Noted.Major Areas Inspected:Tech Specs & Implementing Procedures | |
IR 05000458/1985059 | 17 October 1985 | Insp Rept 50-458/85-59 on 850819-23.Violation Noted: Improper Disposition of Nonconformance Repts Re Test Procedure Criteria | Fitness for Duty |
IR 05000458/1985060 | 9 October 1985 | Insp Rept 50-458/85-60 on 850909-13.No Violation or Deviation Noted.Major Areas Inspected:Deficiency Repts,Tmi Action Items & Fuel Load Witnessing | Shutdown Margin |
IR 05000458/1985061 | 15 October 1985 | Insp Rept 50-458/85-61 on 850823-25.No Violations or Deviations Noted.Major Areas Inspected:Allegations of Improprieties on Part of Certain Licensee Contractor &/Or Subcontractor Personnel | Liquid penetrant |
IR 05000458/1985063 | 24 October 1985 | Insp Rept 50-458/85-63 on 850923-27.No Violation or Deviation Noted.Major Areas Inspected:Followup of Various Open Items & License Conditions | Shutdown Margin |
IR 05000458/1985064 | 16 October 1985 | Insp Rept 50-458/85-64 on 850916-20.No Violation or Deviation Noted.Major Areas Inspected:Radwaste Mgt Controls, Training & Qualifications,Radwaste Startup & Liquid & Gaseous Waste Sys | |
IR 05000458/1985065 | 21 October 1985 | Insp Rept 50-458/85-65 on 850916-20.No Violation or Deviation Noted.Major Areas Inspected:Radiological Environ Monitoring Program,Including Organization & Mgt Controls, Meteorological Monitoring Program & QA Program | Grab sample Offsite Dose Calculation Manual |
IR 05000458/1985068 | 1 November 1985 | Insp Rept 50-458/85-68 on 850930-1003.No Violation or Deviation Noted.Major Areas Inspected:Quality Concerns Program,Asme Certification Program & Followup on Previous Insp Findings | Fitness for Duty Hydrostatic |
IR 05000458/1985070 | 21 October 1985 | Insp Rept 50-458/85-70 on 851002-03.No Violation or Deviation Noted.Major Areas Inspected:Licensee Actions to Resolve OL Precriticality Conditions,Including Plant Air Flow Characteristics | |
IR 05000458/1985072 | 2 December 1985 | Insp Rept 50-458/85-72 on 851009-11.No Violation or Deviation Noted.Major Areas Inspected:Emergency Procedures Appraisal Findings Identified in Insp Rept 50-458/84-34 | |
IR 05000458/1985079 | 10 January 1986 | Insp Rept 50-458/85-79 on 851202-06.No Violation or Deviation Noted.Major Areas Inspected:Startup Test Procedure Review (Turbine Trip) & Startup Test Witnessing | |
IR 05000458/1985082 | 9 January 1986 | Insp Rept 50-458/85-82 on 851216-20.Violation Noted: Electronic Calibr on Primary Containment Area Radiation Monitor Only Included Every Other Decade Range Between 0 & 100% Full Scale | |
IR 05000458/1986012 | 29 May 1986 | Insp Repts 50-458/86-12 & 50-458/86-18 Cancelled | |
IR 05000458/1986017 | 23 May 1986 | Partially Withheld Insp Rept 50-458/86-17 on 860331-0404 & 0502 (Ref 10CFR73.21).Violations Noted Re Vital Area Physical Barriers & Personnel Access Control | |
IR 05000458/1986021 | 9 June 1986 | Insp Rept 50-458/86-21 on 860512-16.No Violation or Deviation Noted.Major Areas Inspected:Licensed Operator Training & Nonlicensed Staff Training | |
IR 05000458/1986023 | 19 August 1986 | Insp Rept 50-458/86-23 on 860615-0731.No Violations or Deviations Noted.Major Areas Inspected:Evaluation of Startup Test Results,Operational Safety Verification,Safety Sys Walkdown,Maint Witnessing & Surveillance Witnessing | |
IR 05000458/1986024 | 21 October 1986 | Insp Rept 50-458/86-24 on 860818-22.Deviation Noted:Failure to Verify Certain Abnormal Operating Procedures | |
IR 05000458/1986025 | 8 August 1986 | Insp Rept 50-458/86-25 on 860721-25.Violation Noted:Failure to Follow Procedures.Deficiencies Noted Re Dose Assessment Training & Equipment | |
IR 05000458/1986026 | 19 December 1986 | Insp Rept 50-458/86-26 Canceled | |
IR 05000458/1986027 | 16 October 1986 | Insp Rept 50-458/86-27 on 860801-0915.Violations Noted: Failure to Meet Electrical Spec Requirements & Failure to Follow Surveillance Test Procedure | Safe Shutdown Half scram Ultimate heat sink Coast down |
IR 05000458/1986028 | 1 October 1986 | Insp Rept 50-458/86-28 on 860825-29.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Organization & Mgt Controls,Alara Program, Training & Qualifications | |
IR 05000458/1986029 | 31 October 1986 | Partially Withheld Insp Rept 50-458/86-29 on 860825-28 (Ref 10CFR73.21).Violation Noted:Inadequate Safeguards Contingency Plan Implementation | Safeguards Contingency Plan |