ML17335A76422 October 1998LER 98-004-00:on 980923,inadvertent Actuation of Efs Occurred During Surveillance Testing.Caused by Personnel Error.Personnel Involved with Event Were Counseled & Procedure Changes Were Implemented.With 981022 Ltr
ML19207B88428 August 1979LER 79-059/03L-0:on 790730,during Mode 1 Operation,Power Supply Failed Causing Isolation of Control Room Ventilation. Caused by Circuitry Failure.Power Supply Was Repaired, Operationally Checked & Radiation Monitor Returned to Svc
ML19207B88528 August 1979LER 79-013/03L-0:on 790808,decay Heat Boron Concentration Was Not Monitored During Prescribed Interval & Inservice Decay Heat Loop Was Switched W/O Switching Sample Lineup. Caused by Communications Breakdown Between Depts
ML19208A1025 September 1979LER 79-068/03L-0:on 790812,emergency Feedwater Flow Control Valve 2CV-1025-1 from Pump 2P7B to Steam Generator a Failed to Fully Close from Control Room Demand Signal.Caused by Nonalignment of Limit Stop Switch.Switch Realigned
ML19208A1035 September 1979LER 79-067/04L-0:on 790808,auxiliary Bldg Radwaste Area Radiation Monitor 2RE-E542 Sample Pump Found W/Broken Coupling.Cause Not Stated.Plastic Coupling Replaced W/Metal Coupling.Appropriate Grab Samples TakenGrab sample
ML19208A1045 September 1979LER 79-064/03L-0:on 790807,trips in Plant Protection Sys D Placed in Bypass to Investigate Oscillations in delta-T Power Indication.Caused by Cold Leg Temp Indication Oscillation.All Related Signal Connections Tightened
ML19208A1055 September 1979LER 79-069/03L-0:on 790814,diesel Generator 2 Could Not Be Stopped from Control Room Handswitch 2HS-2829-2 During Mode 2 Operation.Caused by Internal Spring on Handswitch Contact Being Out of Adjustment.Spring & Switch Contacts Adjusted
ML19208A73931 August 1979LER 79-063/03L-0:on 790806,containment Atmosphere Sample Reactor Bldg Penetration Outside Isolation Valve 2SV-8263-2 Would Not Indicate Closed During Stroke Test.Caused by Limit Switch Being Out of Adjustment.Limit Adjusted
ML19208A75031 August 1979LER 79-065/03L-0:on 790809,battery Charger 2D31 Failed, Rendering Dc Bus a Inoperable.Caused by Dc Output Lamp Socket Burning Up Due to Higher Voltage & Increased Resistance in Circuit.Unit Cleaned
ML19208A75731 August 1979LER 79-066/03L-0:on 790809,containment Isolation Valve 2CV-2201-2 Would Not Fully Close After Routine Draining of Reactor Drain Tank.Caused by Foreign Matl Damaging Seats & Ball,Resulting in Valve Leaking Through.Valve Cleaned
ML19208A78731 August 1979LER 79-012/03L-1:on 790810,during Cold Shutdown,Testing of Reactor Bldg Penetration V-1 Showed Leak Rate Exceeding 50,000 Cc/Minutes.Caused by Isolation Valve CV-7402 Needing Adjustment of Shims on Seat to Match Butterfly Surface
ML19208D45320 September 1979LER 79-058/03X-1:on 790724,as Result of Analysis of Seismic Category I Pipe Supports,Nine Restraints Were Identified as Having Safety Factor of Less than Two.As Result,Reactor Bldg Sump Drain Declared Inoperable
ML19208D46120 September 1979LER 79-076/03L-0:on 790821,control Room Emergency Air Conditioning Unit 2VE1B Failed to Start.Caused by Crankcase Oil Leak.Leak Repaired,Oil & Freon Added
ML19208D46420 September 1979LER 79-077/03L-0:on 790826,safety Injection Tank 2T2D Level Could Not Be Maintained Above 80.1% Due to Makeup Valve 2CV-5064 Failing to Open on Command.Caused by Improper Spring Tension on Valve Operator Gate.Tension Adjusted
ML19208D47214 September 1979LER 79-015/99X-0:on 790817,as Result of Analysis of Seismic Category I Pipe supports,37 Restraints Were Identified to Have Safety Factor of Less than Two.Supports Modified
ML19208D47914 September 1979LER 79-016/03L-0:on 790827,diesel Generator 2 Tripped on Low Oil Pressure,Rendering Generator Inoperable.Caused by Leak Allowing Water to Enter Oil Sys,Causing High Crankcase Pressure.Oil Cooler Replaced
ML19210C71112 November 1979LER 79-086/03L-0:on 791013,during Mode 6 Operation,Increased Radiation Monitor Indication Noted on Shutdown Cooling Heat Exchanger 2E35B.Caused by Small Tube Leak in Heat Exchanger. Anomalies Will Be Analyzed
ML19210D11414 November 1979LER 79-019/03L-0:on 791012,condensate Isolation Valve CV-1065 to Quench Tank Failed to Close from Control Panels C-16 & 18.Caused by Burnt Out Solenoid Coils.Replaced AC Coils by Coils & Tested Valve
ML19210D37016 November 1979LER 79-020/04L-0:on 791017,excessive Radioactive Gas Release Occurred During Routine Makeup Tank Gas Space Sampling. Caused by Increase in Failed Fuel.Sampling Temporarily Discontinued & Procedures Being Revised
ML19210D5757 November 1979LER 79-018/03L-0:on 791008,tank Discharge Valve Failed & Control Valve 1616 Declared Inoperaple.Caused by Pinched Control Wire Blowing Fuse in Breaker Cubicle.Wire Reinsulated & Fuse Replaced.Craft Personnel Cautioned
ML19211A2526 December 1979LER 79-021/03L-0:on 791115,while Securing Makeup & Purification Sys,Inside Containment Isolation Seal Return Valve Failed to Fully Close on Demand.Caused by Valve Operator Torque Switch Failing to Make Up.Switch Replaced
ML19211A2556 December 1979Updated LER 79-012/03X-1:on 790810,leak Rate Testing of Reactor Bldg Purge Valves at Penetration V-1 Indicated Leak Rate in Excess of Tech Spec Limits.Caused by Maladjusted Valve Seat Shims.Leak Rate Test Performed
ML19211A2626 December 1979LER 79-087/03L-0:on 791114,during Mode 5 Operation,Leakage Discovered in Socket Weld on Low Pressure Safety Injection Flow Orifice Valve.Caused by Mechanical Fatigue Failure at Weld.Injection Sys Out of Svc 3-h During Repair
ML19211A2646 December 1979LER 79-039/03X-1:on 790527,during NRC Audit of Category E Valve Positions in Mode 3 Operation,Low Pressure Safety Injection Discharge Header Valve 2SI-5091-3 Found Closed. Caused by Operator Error.Valve Modified
ML19225B03316 July 1979LER 79-007/03L-0 on 790616:during Heatup,Emergency Feedwater Pump Automatically Started W/Inadvertent Actuation.Caused by Valve Lineup Error.Outboard Pump Bearing Found to Be Hot Due to Faulty Installation.Maint Procedure Revised
ML19225C43118 July 1979LER 79-046/03L-0 on 790619:leakage of Seal on Personnel Escape Hatch Was in Excess of 50,000 Cubic Centimeters/ Minute.Cause Not Given.Seal Replaced.Retest Indicated No Leakage
ML19225C79727 July 1979LER 79-009/03L-0 on 790628:during Power Operation Reactor Bldg Hydrogen Purge Fan VSF-30A Tripped After 90 Minutes of 10-h Run.Caused by Overcurrent.Fan Restarted Using Less Sealing Water
ML19225C81127 July 1979LER 79-010/01T-0 on 790714:design of Main Steamline Restraints Did Not Consider Steam Hammer Transient Forces. Review Performed.Overstressed Area Will Be Modified
ML19225C81927 July 1979LER 79-047/04L-0 on 790627:condenser Vacuum Pump Radiation Monitors Inoperable More than Seven Days During Mode 1 Operation.Caused by Moisture Buildup.Engineering Evaluation Is Being Conducted
ML19241A68727 June 1979LER 79-040/03L-0 on 790603:during Mode 3 Operation, Emergency Feedwater Valve from Electric Pump to B Steam Generator,Would Not Stroke Shut.Caused by Coil & Tripper Bar Being Out of Adjustment.Valve Repaired
ML19241A69327 June 1979LER 79-043/03L-0 on 790609:during Mode 3 Operation, Emergency Feedwater Control Valves from Electric Pump to a Steam Generator Failed to Close.Caused by Loose Wire on Handswitch.Valve Filled & Vented W/Oil
ML19241B1646 July 1979LER 79-041/03L-0 on 790607:failure to Perform Surveillance Test on Containment Personnel Hatch within Specified Time Limit.Caused by Irregularity of Testing on Weekends.Testing Rescheduled to Fall on Monday,Wednesday & Friday
ML19241B1656 July 1979LER 79-042/03L-0 on 790607:reheat Stop Valve 4 Would Not Open During Mode 1 Operation W/Main Turbine Latched. Caused by Mechanical Binding of Reheat Stop Valve to Seat. Valve Freed & Trip Tested
ML19241B1666 July 1979LER 79-037/03L-1 on 790514:supply Valves 2CV-1039-2 & CV-1076-2 to Steam Generator 2E24B Would Not Respond During Mode 3 Operation.Caused by Blown Fuse & Stuck Relay.Repairs Made & Valves Proven Operable
ML19242A18225 July 1979LER 79-008/03L-0 on 790621:emergency Feed Actuation Received When once-through Steam Generator a Startup Level Transmitter Selection Was Shifted.Caused by Overspeed Trips Due to Water in Steam Supply Line
ML19246B5189 July 1979LER 79-044/03L-0 on 790610:valve Operator Tripped Circuit Breaker on Overload & Affected Containment Penetration Automatic Isolation Valve Deactivated in Closed Position. Caused by Valve Shaft Binding in Packing.Valve Tested
ML19246B5209 July 1979LER 79-045/03L-0 on 790613:channel a Core Protection Calculator Taken Out of Bypass,Resulting in Linear Power Density & DNBR Trip.Cause Unknown.Channel Tested & Returned to Svc
ML19248C81026 June 1979LER 79-039/03L-0 on 790527:during NRC Audit of Category E Valve Positions,While in Mode 3 Operation,Low Pressure Safety Injection Discharge Header Valve 25I-5091-3 Was Discovered in Closed Position.Cause Unstated.Valve Opened
ML19248C81526 June 1979LER 79-038/03L-0 on 790527:during Main Steam Safety Valve Testing in Mode 3 Operation,Steam Generator a Pressure indicator,2PI-1041-4 on Channel Dpps,Failed High.Caused by Heat Breakdown of Some Component
ML19249B53330 August 1979LER 79-060/03L-0:on 790802,failure of Reactor Drain Tank 2T68 Discharge Reactor Bldg Penetration to Close from Control Signal.Caused by Crystallization of Boron in Vent on Valve Operator Piston.Valve Cleaned & Returned to Svc
ML19249B53630 August 1979LER 79-061/03L-0:on 790804,failure of Low Pressure Nitrogen Supply in Reactor Bldg Penetration,Outside Isolation Valve, to Close on Control Signal.Caused by Limit Setpoint Drift. Limit Adjusted & Valve Returned to Svc
ML19249B55430 August 1979LER 79-062/03L-0:on 790804,failure of Full Length Control Element Assembly 39 to Move.Caused by Failed Control Element Assembly Enable Card.Card Replaced & Assembly Declared Operable within 1-h of Failure
ML19249C76412 September 1979LER 79-014/99X-0:on 790813,w/75% Reactor Power,Switchyard Relay 21Z1 Failed,Causing Turbine Trip.Caused by Lug Failure on Terminal Leads to Turbine Lockout Relay 286-T.Failed Lug Replaced,Terminals Tightened & Turbine Interlocks Tested
ML19249C77412 September 1979LER 79-070/03L-0:on 790816,during Mode 1 Operation,Battery Eliminator 2D35 Failed,Causing Reactor Trip Breakers to Open.Caused by Relay Coil Failure Due to Sticking Plunger. Relay Replaced & Breakers Reclosed
ML19249C77812 September 1979LER 79-071/03L-0:on 790818,during Mode 1 Operation,B Core Protection Calculator Failed.Caused by Memory Failure. Memory Module Replaced,Software Loaded,Core Protection Calculator Functionally Tested & Returned to Svc
ML19249C77912 September 1979LER 79-074/03L-0:on 790821,during Mode 1,core a Projection Computer Trips Bypassed,Allowing Change Out of Power Supplies & Causing Erroneous Position Indication Inputs.Core a Projection Computer Supplies Replaced
ML19249C78012 September 1979LER 79-072/03L-0:on 790818,following Plant Trip,Emergency Feedwater Pump Turbine Driver 2K3 for Pump 2P7A Tripped on Overspeed.Caused by Sticky Linkage on Turbine Governor.Trip Reset & 2P7A Sucessfully Tested
ML19249C78112 September 1979LER 79-075/03L-0:on 790822,during Mode 1,data Link to Core B Projection Computer Dropped Bit,Causing Inaccurate Output. Caused by Failed Optical Amplifier.Data Link Repaired & Returned to Svc
ML19249C78212 September 1979LER 79-073/03L-0:on 790820,during Mode 1 Operation,Spurious Control Element Assembly Calculator Penalty Factor Outputs Caused Reactor Trip.Caused by Dirty Input Card Contacts.Edge Connector Cleaned & Calculators Verified Operable
ML19250A49219 October 1979LER 79-080/03L-0:on 790921,indication for Sodium Hydroxide Addition Tank Discharge Valve 2CV-5667-2 Was Lost.Caused by Failed Power Supply Fuse.Power Fuse Was Replaced & Control Circuit Current Verified