ML19249C782

From kanterella
Jump to navigation Jump to search
LER 79-073/03L-0:on 790820,during Mode 1 Operation,Spurious Control Element Assembly Calculator Penalty Factor Outputs Caused Reactor Trip.Caused by Dirty Input Card Contacts.Edge Connector Cleaned & Calculators Verified Operable
ML19249C782
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/12/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19249C772 List:
References
LER-79-073-03L, LER-79-73-3L, NUDOCS 7909180498
Download: ML19249C782 (1)


Text