ML16041A268
ML16041A268 | |
Person / Time | |
---|---|
Site: | Fermi ![]() |
Issue date: | 01/26/2016 |
From: | DTE Electric Company |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
EP-290001, Rev 9 | |
Download: ML16041A268 (2) | |
Text
DETROIT EDISON -FERMI 2AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST01/26/16To: 00935US NRCDOCUMENT CNTRL DESKPAGE 1WASHINGTON, DC 20555Media: 8 1/2 X 11Number Cnt IssueDTC Dcc. Serial Number Page Rev Copies Lvi Date Sec StatusTPEPT EP-290001 9 1 ST 01/26/16 AFCPlease destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway,Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: e58683 NUCLEAR PLANT EVENT NOTIFICATION FORMCommunicate lines1.-6 verbally.
(Initial Notifications) 1.El Actual EventEl DrillP2.Plant C~ontact Information Fermi 2Nuclear Power Plant:Plant Communicator:
Plant Message NumberCalling From: El Control Room El TSC LI EOF LI Other_____
Call Back Telephone Number: _______________
- 3. Current Classification
[']E Unusual Event El Alert El Site Area Emergency El General Emergency El Termination (TDF pg.]1 Required)
This classification was declared at: Date: _______ Time:_________
- 4. Reason for Classification
[] Abnormal Rad Level/Rad Effluents El Fission Product Barrier Degradation Fermi IC Number: _ ____Fermi IC Number:_____
El Hazards and Other Conditions Affecting Plant Safety El System Malfunction Fermi IC Number: ______Fermi IC Number: _____El Independent Spent Fuel Storage Installation El Cold Shutdown
/ Refueling System Malfunction Fermi IC Number: ______Fermi IC Number: _____5. Radiological Release in Progress Due to EventEl Yes El No6. Protective Action Recommendations
- 6. E NoneRecommend the following protective actions:
Implement the State of Michigan K! plan. All other areas monitor and prepare.Evacuation of Area(s):
El 1 El 2 El 3 El 4 El 5In-Place Shelter of Area(s):
El 1 El 2 El 3 El 4 El 5Clear Lake Area(s):
El 6 El 7PAR based on Dose Calculations*:
El YES El NOpARs are beyond 10 Miles*: El YES El NO*TDF pg 2 required and a conference call with the ORO must be complete within 15 minutes of "notification" by this form.Meteorological DataNOTE: The TPCS "Straight Line Plume Plot" is the preferred source.Wind Direction (degrees):
From ______to
_______Wind Speed (MPH):______
Stability Class: __ _Precipitation:
El Yes El NoApproved:______________
____________
__ ____Signature Print Name Date TimeSEOC Functional El Yes El No If Yes, DO NOT call counties.
Notifications Time Contacted Name Telephone No. or Select Auto-Dial Monroe County ______________________
_________E Auto-Dial Wayne County _______________________________E Auto-Dial Michigan State Police/SEOC
_________
_____________
__________E Auto-Dial NRC Operations CenterProvince of Ontario (Canada)
_________
_____________
__________E Auto-Dial A. Nuclear Information S a ____________________
_____________________
!DTC: TPEPT DSN: EP-290001 Rev. 9 P1/1 IP: I File: 1703.10 Issued:flL621 File: 0926.09 lIP: I DETROIT EDISON -FERMI 2AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST01/26/16To: 00935US NRCDOCUMENT CNTRL DESKPAGE 1WASHINGTON, DC 20555Media: 8 1/2 X 11Number Cnt IssueDTC Dcc. Serial Number Page Rev Copies Lvi Date Sec StatusTPEPT EP-290001 9 1 ST 01/26/16 AFCPlease destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway,Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: e58683 NUCLEAR PLANT EVENT NOTIFICATION FORMCommunicate lines1.-6 verbally.
(Initial Notifications) 1.El Actual EventEl DrillP2.Plant C~ontact Information Fermi 2Nuclear Power Plant:Plant Communicator:
Plant Message NumberCalling From: El Control Room El TSC LI EOF LI Other_____
Call Back Telephone Number: _______________
- 3. Current Classification
[']E Unusual Event El Alert El Site Area Emergency El General Emergency El Termination (TDF pg.]1 Required)
This classification was declared at: Date: _______ Time:_________
- 4. Reason for Classification
[] Abnormal Rad Level/Rad Effluents El Fission Product Barrier Degradation Fermi IC Number: _ ____Fermi IC Number:_____
El Hazards and Other Conditions Affecting Plant Safety El System Malfunction Fermi IC Number: ______Fermi IC Number: _____El Independent Spent Fuel Storage Installation El Cold Shutdown
/ Refueling System Malfunction Fermi IC Number: ______Fermi IC Number: _____5. Radiological Release in Progress Due to EventEl Yes El No6. Protective Action Recommendations
- 6. E NoneRecommend the following protective actions:
Implement the State of Michigan K! plan. All other areas monitor and prepare.Evacuation of Area(s):
El 1 El 2 El 3 El 4 El 5In-Place Shelter of Area(s):
El 1 El 2 El 3 El 4 El 5Clear Lake Area(s):
El 6 El 7PAR based on Dose Calculations*:
El YES El NOpARs are beyond 10 Miles*: El YES El NO*TDF pg 2 required and a conference call with the ORO must be complete within 15 minutes of "notification" by this form.Meteorological DataNOTE: The TPCS "Straight Line Plume Plot" is the preferred source.Wind Direction (degrees):
From ______to
_______Wind Speed (MPH):______
Stability Class: __ _Precipitation:
El Yes El NoApproved:______________
____________
__ ____Signature Print Name Date TimeSEOC Functional El Yes El No If Yes, DO NOT call counties.
Notifications Time Contacted Name Telephone No. or Select Auto-Dial Monroe County ______________________
_________E Auto-Dial Wayne County _______________________________E Auto-Dial Michigan State Police/SEOC
_________
_____________
__________E Auto-Dial NRC Operations CenterProvince of Ontario (Canada)
_________
_____________
__________E Auto-Dial A. Nuclear Information S a ____________________
_____________________
!DTC: TPEPT DSN: EP-290001 Rev. 9 P1/1 IP: I File: 1703.10 Issued:flL621 File: 0926.09 lIP: I