|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] |
Text
CATEGORY1REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9809150164 DOC.DATE:
98/09/08NOTARIZED:
NOFACIL:50-335 St.LuciePlant,Unit1,FloridaPo~er&LightCo.50-389St.LuciePlant,Unit2,FloridaPower&LightCo.AUTH.NAME.AUTHORAFFILIATION STALL,J.A.
FloridaPower&LightCo.RECXP.NAME RECIPIENT AFFILIATION RecordsManagement Branch(Document ControlDesk)DOCKET0500033505000389
SUBJECT: Forwardsrev2toEmergency ResponseDataSys(ERDS)DataPointLibraries forStLucieUnits1&2.Submittal completes corrective actionsforviolations notedininsprepts50-355/98-07 650-389/98-07.
DISTRIBUTION CODE:A026DCOPIESRECEIVED:LTR 1ENCLSIZE:ITITLE:Emergency ResponseDataSystem(ERDS)NOTES:AE'ECIPIENT IDCODE/NAME AEOD/IRB01'NTERNAL:
ACRSAEOD/DOA/IRB
'GN2ERCCOPIESLTTRENCL11111111RECIPXENT IDCODE/NAME GLEAVES,W LCENTERRGN2FILECOPIESLTTRENCL1'111111EXTERNAL:
NRCPDR11NOTETOALL"RZDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LZTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTOLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
LTTR9ENCL9 FloridaPower5LightCompany,6501SouthOceanDrive,JensenBeach,FL34957FPLSeptember 8,1998L-98-22410CPR50AppendixEU.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555RE:St.LucieUnits1and2DocketNos.50-335and50-389Emergency ResponseDataSystem.DataPointLibRevision2Pursuantto10CPR50,AppendixESectionVI.3.a.,FloridaPower&LightCompany(FPL)submitsRevision2oftheEmergency ResponseDataSystem(ERDS)DataPointLibraries forSt.LucieUnit1andUnit2.Therevisions providex'eplacement pagesandfollowtheformatxecommended byNUREG1394,Emergettcy ResponseDataSystem(ZRDS)Implementation, Revision1AppendixC(DataPointLibrary).
ThelastrevisionoftheSt.LucieUnit1andUnit2Emergency ResponseDataSystem(ERDS)DataPointLibraries weresubmitted byPPLletterL-92-300datedOctober22,1992.Thissubmittal completes thecorrective actionsfortheviolation of.minorsignificance discussed inparagraph E1.2.bofNRCIntegrated Inspection ReportNos.50-335/98-I and50-389/98-07.
ThefailuretonotifytheNRCofminorERDSDataPointLibruydatachangesinaccordance with10CPR50,AppendixEVI.3wasclassified asaviolation ofminorsignificance intheinspection reportandwasnotsubjecttoenforcement action.Attachment 1isthexeplacement pagesfortheSt.LucieUnit1ERDSDataPointLibrary.Attachment 2isthexeplacement pagesfortheSt.LucieUnit2ERDSDataPointLibrary.Inpreparation ofthissubmittal, FPLidentified apotential omissionin10CPR50.4(b)(5),
Emergency planandrelatedsubmittals.
Thepotential omissionisthattheERDSDataPointLibruysubmittals xequixedby10CFR50,AppendixEVI.3shouldbeaddedto10CFR50.4(b)(5),
andthat10CPR50,AppendixEshouldbemodifiedtoxefexence 10CPR50.4.Thiswouldeliminate anyconfusion xegarding theaddressee ordistribution ofthexettuired submittals.
Pleasecontactusifthereareanytluestions xegarding thissubmittal.
Verytrulyyours,J.A.StallVicePresident St.LuciePlantJAS/GRM9809k50'4980908PDRADOCK05000335'PGRcc:RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlantanFPLGroupcompany St.LucieUnits1and2DocketsNos.50-335and50-389L-98-224Attachment 1Attachment 1St.LucieUnit1ERDSDataPointLibraryUpdates St.LucieUnits1and2DocketsNos.50-335and50-389L-98-224Attachment IUNIT1DPLUPDATESPaePlantPointDescrition%POWERWIDERANGEAVERAGE3CPSPOWERLEVEL12FEEDWATER FLOWA13FEEDWATER FLOWBOriinalRane1.0E-08to150%0.0to1.0E+30.00to6.0E+06LBM/HR0.00to6.0E+06LBM/HR'datedrane2.0E-08to20000%0.0to1.0E+50.00to6.040E+06 LBM/HR0.00to6.038E+06 LBM/HRReasonforUdateNewNuclearInstrumentation wasinstalled NewNuclearInstrumentation'was installed Acalibration rangechange,toimproveinstrument accuracy, wasmadeAcalibration rangechange,toimproveinstrument accuracy, wasmade141516AUXFEEDWATER HEADERAFLOWAUXFEEDWATER HEADERBFLOWAUXFEEDWATER HEADERCFLOW0.00to400.00GPM0.00to400.00GPM0.00to600.00GPM0.00to500.00GPM0.00to500.00GPM0.00to1000.00GPMArangechangetosuorthiherflowArangechangetosuorthiherflow'rangechangetosuorthiherflow St.LucieUnits1and2DocketsNos.50-335and50-389L-98-224Attachment lSL1DATAPOINTLIBRARYREFERENCE FILEPage2of47REV02Date'/23/98 ReactorUnit:....SL1DataFeeder:.N/ANRCERDSParameter:
.....................NI INTERRNGPointID:PWR-WR-%-1 PlantSpecPointDesc:...................
~..%POWERWIDERANGEAVERAGEGeneric/Cond Desc:.NuclearInstiuments, Inter.RangeAnalog/Digital:.
~~~~~oAEngrUmts/DigStates:......................
%EngrUmtsConversion:
.....................LOG MuumumInstrRangeooooooooooooooooooooo2oOE48
/R02MaximumInstrRange:....................200
/R02ZeroPointReference:
.......................N/A Reference PointNote:.......................N/A PROCorSENS..PNumberofSensors:..........................4 HowProcessed:.
AVERAGEWITHEXPANDEDQUALITYSensorLocations:
..OUTERCIRCUMFERENCE OFREACTORVESSELAlarm/Trip SetPoints:......................V~LE NIDetectorPowerSupplyCutoffPowerLevel:.......................N/A NIDetectorPowerSupplyTurneonPowerLevel:.......................N/A'nstrument FailureMode:...................
N/ATemperature Compensation fofDPTransmltterso
~oo~o~~~ooo~~~~~ooo~~~~~~LevelReference Leg:........................
N/AUniqueSystemDescription:................
Thisparameter isderivedfromfourReactorProtection System(RPS)channels.
Below1000cpsthesechannelsareconfigured forsourcerange.Datainputstothisparameter aretheReactorPowerWideRangesignalsJI001-P-1, JI002P-1,JI003-P-1, andJI004-P-1 whicharelogarithmic.
Thesesignalsareprocessed byanalgorithm whichprovidesanaveragewithexpandedquality.Thisfunctionobtainstheaverageofallvalueswithagoodstatus.Italsosetsthequalityoftheresultbasedonthenumberofvalueswithgoodstatus,versusthetotalnumberofinputs.Thepossiblestatusvaluesare:Greaterthan50%ofallinputshavegoodstatus,resultisgood;Onlyonegoodvalueandthetotalinputsare3ormore,theresultispoor;Whentherearenogooddatavaluesbuttherearesomewithpoororsuspect,theresultispoor;Theresultissuspectforallothercasesexceptallbad,inthiscasetheresultisba St.LucieUnitsland2DocketsNos.50-335and50-389L-98-224Attachment lSL1DATAPOINTLIBRARYREFERENCE FILEPage3of47REV02Date..........
........~............
.7/23/98ReactorUnit:SL1DataFeeder:.N/ANRCERDSParameter:
.....................NI SOURCRNGPointID:.QA0040-IPlantSpecPointDesc:......................
CPSPOWERLEVELGeneric/Cond Desc:.........................
NuclearInstruments, SourceRangeAnalog/Digital:
.AEngrUnits/Dig States:......................CPS EngrUnitsConversion:
.~...................
LOGMuumumIns'trRange~~~~~~~~~~~~~~~~~~o00MaximumInstrRanget....................1.0E+5
/R02ZeroPointReference:
.......................N/A Reference PointNote:.......................N/A PROCorSENS.PNumberofSensors:..........................4 HowProcessed:
.AVERAGEOFGOODVALUESSensorLocations:................OUTER CIRCUMFERENCE OFREACTORVESSELAlarm/Trip SetPoints:......................
VARIABLENIDetectorPowerSupplyCut&IfPowerLevel:.......................
>1000CPSNIDetectorPowerSupplyTurinPowerLevel:.......................
(1000CPSInstrument FailureMode:...................
N/ATemperature Compensation forDPTransmitters:
.........................
LevelReference Leg:........................
N/AUniqueSystemDescription:................
Thisparameter isderivedfromfourReactorProtection System(RPS)channels.
Theyareactiveinthesourcerangeupto1000cps.Datainputstothisparameter arethesignalsJI001-C-1, JI002-C-1, JI003-C-1, andJI004-C-1whicharelogarithmi St.LucieUnits1and2DocketsNos.50-335and50-389L-98-224Attachment 1SL1DATAPOINTLIBRARYREFEIKNCE FILEPage12of47REV02Date:..7/23/98 ReactorUnit:SL1DataFeeder:.N/ANRCERDSParameter:
.....................MN FDFL1/APointID:.QA0025-IPlantSpecPointDesc:......................FEEDWATER FLOWAGeneric/Cond Desc'......
StmGenAMainFeedwater FlowAnalog/Digital:
.............
AEngrUnits/Dig States:......................LBM/HR EngrUnitsConversion:
.....................
N/AMinimumInstrRange:.~....................0.00 MaximumInstrRange.....................6.040E+06
/R02ZeroPointReference:
.......................
N/AReference PointNotes:......................
N/APROCorSENS'..PNumberofSensors:.-.3HowProcessed:
.REDUNDANT SENSORALGORITHM SensorLocations:
TURBINEBUILDING43FT.LVLAlarm/Trip SetPoints:......................
VARIABLENIDetectorPowerSupplyCut-OffPowerLevel........................N/A NIDetectorPowerSupplyTurn-onPower,Level........................
N/AInstrument FailureMode....................
N/ATemperature Compensation fofDPTfansnutters
~~~oo~~~~~~~~oo~~~~~~oo~~~LevelReference Leg:..................~.....
N/AUniqueSystemDescription:..........~.....
Thisparameter isthe"A"steamgenerator mainfeedwater flow.ItisderivedfromSteamGenerator MainFeedwater FlowsignalsFT09-3A1-1, FT09-3A2-1,andFT09-3A3-1 whicharesquareroots.Thesesignalsareprocessed
"witharedundant sensoralgorithm.
Thisfunctionobtainstheaverageofthecurrentvaluesthathaveagoodstatusandareclosetothestatistical majorit St.LucieUnitsland2DocketsNos.50-335and50-389L-98-224Attachment 1SL1DATAPOINTLIBRARYREFHKNCEFILEPage13of47REV02Date:7/23/98ReactorUnit:..~.SL1DataFeeder:N/ANRCERDSParameter:
.....................MN FDFL2/BPointID:..QA0026-IPlantSpecPointDesc:......................
FEEDWATER FLOWBGeneric/Cond Desc:......Stm GenBMainFeedwater FlowAnalog/Digital:
AEngrUnits/Dig States:..............
~..~....LBM/HR EngrUnitsConversion:
.....................
N/AMinimumInstrRange:......................0.00 MaximumInstrRange:....................6.038E+06
/R02ZeroPointReference:
.......................N/A Reference PointNotes......................N/A PROCorSENS'PNumberofSensors:.........,................3 HowProcessed:
.REDUNDANT SENSORALGORITHM SensorLocations:.
.TURBINEBUILDING43FT.LVLAlarm/Trip SetPoints:.....~................
VARIABLENIDetectorPowerSupplyCut-OffPowerLevel:.......................N/A NIDetectorPowerSupplyTurn-onPowerLevel:.......................N/A Instnunent FailureMode:...................N/A Temperature Compensation forDPTransmitters:
.........................
LevelReference Leg:........................
N/AUniqueSystemDescription:................
Thisparameter isthe"B"steamgenerator mainfeedwater flow.ItisderivedfromSteamGenerator MainFeedwater FlowsignalsFT09-3B1-1, FT09-3B2-1,andFT09-3B3-I whicharesquareroots.Thesesignalsareprocessed
.witharedundant sensoralgorithm.
Thisfunctionobtainstheaverageofthecurrentvaluesthathaveagoodstatusandareclosetothestatistical majorit e St.LucieUnits1and2DocketsNos.50-335and50-389L-98-224Attachment 1SL1DATAPOINTLIBRARYREFERENCE FILEPage14of47REV02Date7/23/98ReactorUnit:.....SL1DataFeeder:..............
N/ANRCERDSParameter:
.....................AX FDFL1/APointID:......FT09-2A-1
'lantSpecPointDesc:......................
AUXFEEDWATER HEADERAFLOWGeneric/Cond Desc~....~..............
StmGenAAuxiliary FWFlowAnalog/Digital:
..........
AEngrUnits/Dig States:......................GPM EngrUnitsConversion:
.....................
LINEARMuumumInstrRange:0~~~~~~~~~oo0000MaximumInstrRange.....................500.00
/R02ZeroPointReference:
...........
~...........
N/AReference PointNotes:......................N/A PROCorSENS:..........................~...S NumberofSensors:..........................1 HowProcessed:.
N/ASensorLocations:.............................
ST&MTRESSEL23FT.LVL.Alarm/Trip SetPoints:......................
VARIABLENIDetectorPowerSupplyCut4ffPowerLevel:.......................N/A NIDetectorPowerSupplyTurn-onPowerLevel:.......................N/A Instrument FailureMode....................N/A Temperature Compensation forDPTransnutters:.........................
LevelReference Leg:,~.....................
~.N/AUniqueSystemDescription:................
Thisparameter istheauxiliary fecdwater flowtothe"A"steamgenerator.
Itisconverted toengineering unitsusingalinearequation.
Thefeedflowsuppliedtothe"A"steamgenerator canbesuppliedbythe"A"andor"B"auxfeedpumps,depending onthevalvelineup.Flowsuppliedby"A"and"B"auxfeedpumpswillbemeasuredbythisinstrument.
Theflowelementisupstreamofthepumpsdischarge crossties.Howeverflowsuppliedto"A"steamgenerator from"C"auxfeedpumpdoesnotgothroughthisflowelement.Feedflowtothe".A"generator from"C"auxfeedpumpismeasuredatFT09-2C-1 sensorandmaybeonlyapartialrepresentation oftheflowtothe"A"steamgenerator ifthe"B"steamgenerator isbeingfedatthesametimefromthe"C"feedpum St.LucieUnits1and2DocketsNos.50-335and50-389L-98-224Attachment 1'L1DATAPOINTLIBRARYREFERENCE FILEPage15of47REV02Date7/23/98ReactorUnit:SL1DataFeeder:..............
N/ANRCERDSParameter:
......~..............
AXFDFL2/BPointID:.FT09-2B-1 PlantSpecPointDesc:......................
AUXFEEDWATER HEADERBFLOWGeneric/Cond Desc'StmGenBAuxiliary FWFlowAnalog/Digital:.
AEngrUnits/Dig States:......................
GPMEngrUnitsConversion:
.....................LINEAR MinimumInstrRange:......................0.00
/R02ZeroPointReference:
.......................
N/AReference PointNotes:......................
N/APROCorSENS'SNumberofSensors~~~~~~et~~~~~~~~~~~1HowProcessed:
..N/ASensorLocations:
.........STEAM TRESSEL23FT.LVL.Alarm/Trip SetPoints:......................
VARIABLENIDetectorPowerSupplyCut-OffPowerLevel:.......................N/A NIDetectorPowerSupplyTurinPowerLevel:.......................
N/AInstrument FailureMode:...................
N/ATemperature Compensation forDPTransmitters:
.........................
LevelReference Leg:........................
N/AUniqueSystemDescription:................'Ms parameter istheauxiliary feedwater flowtothe"B"steamgenerator.
Itisconverted toengineering unitswithalinearequation.
Thefeedflowsuppliedtothe"B"steamgenerator canbesuppliedbythe"A"andor"B"auxfeedpumps,depending onthevalvelineup.Flowsuppliedby"A"and"B"auxfeedpumpswillbemeasuredbythisinstrument.
Theflowelementisupstreamofthepumpsdischarge crossties.Howeverflowsuppliedtothe"B"steamgenerator from"C"auxfeedpumpdoesnotgothroughthisflowelement.Feedflowtothe"B"generator from"C"auxfeedpumpismeasuredatFT09-2C-I
'sensorandmaybeonlyapartialrepresentation offlowtothe"B"steamgenerator ifthe"A"steamgenerator isbeingfedatthesametimefromthe"C"feedpum St.LucieUnits1and2DocketsNos.50-335and50-389L-98-224Attachment 1SL1DATAPOINTLIBRARYREFERENCE FILEPage16of47REV02Date:.7/23/98ReactorUnit:SL1DataFeeder..N/ANRCERDSParameter:
.....................
AXFDFL3/CPointID:..........FT09-2C-1 PlantSpecPointDesc:......................AUX FEEDWATER HEADERCFLOWGeneric/Cond Desc'tmGenA/BAuxiliary FWFlowAnalog/Digital:
.AEngrUnits/Dig States:......................GPM EngrUmtsConverslono e".~.ee~~oooooooooo.LINEAR MinimumInstrRange:......................0.00 MnxnnumInstI'angetooooeoooooooeooooooo 1000@00/R02ZeroPointReference:
...................~...N/A Reference PointNote:.......................N/A PROCorSENSSNumberofSensors:..........................1 HowProcessed:............
~.~....N/ASensorLocations:.
STEAMTRESSEL23FT.LVL.Alarm/Trip SetPoints:..........
~..~.~......VARIABLENIDetectorPowerSupplyCut-OffpowerLevel:.......................N/A NIDetectorPowerSupplyTurinPowerLevel:.......................N/A Instrument FailureMode:...................
N/ATemperature Compensation forDPTransnutters:
.........................
LevelReference Leg:........................
N/AUniqueSystem'Description:.......,........
Thisparameter isthe"C"auxiliary feedwater pumpheaderflow.Itfeedseitherthe"A"or"B"steamgenerator.
The"C"auxiliaty feedwater pumpisdrivenwithasteamturbineenginewhichreceivesitssteamsupplyfromeitherthe"A"or"B"steamgenerator.
Itisconverted toengineering unitsusingalinearequatio St.LucieUnitsIand2DocketsNos.50-335and50-389L-98-224Attachment 2Attachment 2St.LucieUnit2ERDSDataPointLibraryUpdates
St.LucieUnits1and2DockctsNos.50-335and50-389L-98-224Attachment 2UN1T2DPLUPDATESPaePlantPointDescrition12FEEDWATER FLOWA13FEEDWATER FLOWBOriinalRane0.00to6.0E+06LBM/HR0.00to6.0E+06LBM/HRUtedRane0.00to6.388E+06 LBM/HR0.00to6.388E+06 LBM/HRReasonforuteArangechangetosurtnewventuriArangechangetosurtnewventuri St.LucieUnits1and2DocketsNos.50-335and50-389L-98-224Attachment 2SL2DATAPOINTLIBRARYREFERENCE FILEPage12of47REV02Date:.7/23/98ReactorUnit:~SL2DataFeeder:.N/ANRCERDSParameter:
.....................MN FDFL1/A"PointID:.QA0025-2PlantSpecPointDesc:......................FEEDWATER FLOWAGeneric/Cond Desc:...StmGenAMainFeedwater FlowAnalog/Digital:
.~~...AEngrUnits/Dig States:.....................'.
LBM/HREngrUnitsConversion:
.....................N/A MmunumInstrRange:...0~~~~~~~~~~00000MaximumInstrRange:....................6.388E+06
/R02ZeroPointReference:
..............'.........N/A Reference PointNotes:......................
N/APROCorSENS::.~...........................P NumberofSensors...3HowProcessed:
.REDUNDANT SENSORALGORH'HM SensorLocations:
............................
TURBINEBUILDING43FT.LVL.Alartn/Trip SetPolntst~oct~~owe~~~~~~~~~~~e.VARIABLENIDetectorPowerSupplyCut-OffPowerLevel:................
~..N/ANIDetectorPowerSupplyTumePowerLevel:.......................N/A Instrument FailureMode:...................
N/ATemperature Compensation forDPTransmitters:
.........................
LevelReference Leg:........................
N/AUniqueSystemDescription:............~...
Thisparameter isthe"A"steamgenerator mainfeedwater flow.ItisderivedfromSteamGenerator MainFeedwater FlowsignalsFT09-3A1-2, FT09-3A2-2,andFT09-3A3-2 whicharesquareroots.Thesignalsareprocessed witharedundant sensoralgorithm.
Thisfunctionobtainstheaverageofthecurrentvaluesthathaveagoodstatusandareclosetothestatistical majorit St.LucieUnits1and2DockctsNos.50-335and50-389L-98-224Attachment 2SL2DATAPOINTLIBRARYREFERENCE FILEPage13of47REV02Date:....~~~~~~~~~~~~~~~~~~~7/23/98ReactorUnit:SL2DataFeeder'N/ANRCERDSParameter:
.....................MN FDFL2/BPointID:.QA0026-2PlantSpecPointDesc:..................~...FEEDWATER FLOWBGeneric/Cond Desc:.StmGenBMainFeedwater FlowAnalog/Dlgltal t~~~~~~~~tAEngrUnits/Dlg States:~~~~~~~~~~~~~~~~~~~~~tLBM/HREngrUnitsConversion:
.....................
N/AMmunumInstrRange:.........~...
~..~..~..0.00MmmtmInstI'Rttngetttttttttttttttttotttt6t360E+06 ZeroPointReference:
.............
~..~..~.~.N/AReference PointNotes:...........~..........N/A PROCol'ENS~t~~~~~~~~~~~~~~~~~ttt~~tPNumberofSensors:........~.................3 HowProcessed:
........................REDUNDANT SENSORALGORITHM SensorLocations:..........
TURBINEBUILDING43FT.LVLAlarm/Trip SetPointst~~~~~~~~~~~~~ttt~~tVARIABLE NIDetectorPowerSupplyCut-OffPowerLevel........~....~........
N/ANIDetectorPowerSupplyTurinPowerLevel:.......................N/A Instrument FailureMode:...................
N/ATemperature Compensation forDPTransmitters
~~~~~~~~~~~~~~~~~~~~~~~LevelReference Leg:..................~.....
N/AUniqueSystemDescription:................
Thisparameter isthe"B"steamgenerator mainfeedwater flow.ItisderivedfromSteamGenerator MainFeedwater FlowsignalsFT09-3B1-2, FT09-3B22,andFT09-3B3-2 whicharesquareroots.Thesesignalsareprocessed witharedundant sensoralgorithm.
Thisfunctionobtainstheaverageofthecurrentvaluesthathaveagoodstatusandareclosetothestatistical majority.
/R02 l.