|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] |
Text
~CATEGORY1~REGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)Ii~CESSIONNBR:9807140213DOC.DATE:98/07/08NOTARIZED:NOACIL:50-335St.'LuciePlant,Unit1,FloridaPower&.LightCo.50-389St.LuciePlant,Unit2,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATIONPLUNKETT,T.F.FloridaPower5LightCo.RECIP.NAMERECIPIENTAFFILIATIONRecordsManagementBranch(DocumentControlDesk)
SUBJECT: RespondstoNRCltrreviolationsnotedininsprepts50-335/98-06650/389/98-06.Correctiveactions:reactorcoolantpumpclearancediscrepancynotedasclearancewasbeingreleased.Equipmentordernotrevised.hDISTRIBUTIONCODE:IE01DCOPIESRECEIVED:LTRENCLSIZE:TITLE:General(50Dkt)-InspRept/NoticeofVioationResponseNOTES:DOCKET0500033505000389ERECIPIENTIDCODE/NAMEPD2-3PDCOPIES"RECIPIENTLTTRENCLIDCODE/NAME11GLEAVES,WCOPIESLTTRENCL110INTERNAL:ACRSAEOIQgTCFILECENTER/DM'ECBNUDOCS-ABSTRACTOGC/HDS3TERNAL:LITCOBRYCE,JHNRCPDR221"1111111111111AEOD/SPD/RABDEDRONRR/DRCH/HOHBNRR/DRPM/PERBOEDIRRGN2FILE01INOACNUDOCSFULLTEXT111'111111111111D0ENNOTETOALL"RIDS"RECIPIENTS:PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATIONREMOVEDFROMDZSTRIBUTIONLISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION,CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION415-2083TOTALNUMBEROFCOPIESREQUIRED:LTTR19ENCL19 h
FloridaPower&LightCompany,6351S.OceanDrive,JensenBeach,FL34957July8,1998L-98-16810CFR$2.201U.S.NuclearRegulatoryCommissionAttn:DocumentControlDeskWashington,D.C.20555Re:St.LucieUnits1and2DocketNos.50-335and50-389ReplytoaNoticeofViolationNRCInsectionReort98-06FloridaPowerandLightCompany(FPL)hasreviewedthesubjectNoticeofViolationand,pursuantto10CFR$2.201,theresponsestotheviolationsareattached.Asyouareaware,wehaveidentifiedtheimplementationofequipmentclearanceordersandcorrectiveactionastwooftheprimarychallengestoSt.LuciePlantin1998.SincetheclearanceorderadministrativeprocessisthesameatTurkeyPointandSt.Lucie,andsincewehavenotencounteredsimilarclearanceorderproblemsatTurkeyPoint,wehaveconcludedthathumanperformanceerrorspredominate'asthecauseofequipmentclearanceorderproblemsatSt.Lucie.St.LuciePlanthasaugmentedthestaffingoftheclearancecenterandreconfiguredtheworkareainordertominimizepersonnelerrorprecursors.Weexpecttoseesignificantimprovementinclearanceorders.Withregardtocorrectiveaction,wehaveformedacross-functionalteamtodeterminewhatweaknessesexistintheplant'sprocessesandpersonneltrainingthatresultedintheNRCviolationandQualityAssurancefindingsoncorrectiveaction.Theteamhasidentifiedinsufficientadministrativecontrolsresultinginuntimelycorrectiveactionandinsufficientmanagementinvolvementinthecorrectiveactionprocessasthecause'orcor'rectiveactionperformanceproblems.Weare.intheprocessofaddressingtheseimportantissuesinordertoimproveSt.Lucie'simplementationoftheConditionReportprocess,whichhasbeenproventobearobustprocessatTurkeyPoint.Pleasecontactuswithquestionsontheenclosedviolationresponse.Verytrulyyours,ThomasF.PlunkettPresidentNuclearDivision9807i402i3980708PDRADGCK050003358PDRanFPLGroupcompany TFP/JAS/EJWAttachmentcc:RegionalAdministrator,USNRC,RegionIISeniorResidentInspector,USNRC,St.LuciePlant L-98-168AttachmentP~ae1ViolationATechnicalSpecification6.8.1requiresthelicenseetoestablish,implement,andmaintaintheapplicableproceduresrecommendedinAppendixAofRegulatoryGuide1.33.AppendixArecommendsproceduresforequipmentcontrol(e.g.,taggingandlocking).Proceduresforequipment'controlwerecontainedinADM-09.04,Revision3,"In-Plant.EquipmentClearanceOrders."ADM-09.04,Section3.8.3,requiredElectricalDepartmentPersonnelto"VerifythatanygroundingdeviceisdocumentedontheEquipmentClearanceOrderFormasastepwithnotag."ADM-09.04;Section6.8.4.A,requiredtheNuclearPlantSupervisor,AssistantNuclearPlantSupervisor,theWorkControlCenter-AssistantNuclearPlantSupervisor,ortheNuclearWatchEngineerto"verify...theadequacyoftheinformationcontainedintheRequestsectionoftheEquipmentClearanceOrderControlForm."ADM-09.04,Section6.9.2.C,requiredtheReactorControlOperatorto"Verify[the]boundaryusingcontrolleddocuments...."ADM-09.04,Section6.11.1.A,requiredtheNuclearPlantSupervisor,AssistantNuclearPlantSupervisor,theWorkControlCenter-AssistantNuclearPlantSupervisor,theNuclearWatchEngineer,orotherSeniorReactorOperatorto"VerifythespecifiedEquipmentClearanceOrder.boundarysatisfiestherequirementsspecifiedintheEquipmentClearanceOrderrequest."ADM-09.04,Section6.12.20.A,requiredtheEquipmentClearanceOrderControllertosigntheEquipmentClearanceOrderControlFormindicatingtheyfindtheEquipmentClearanceOrderacceptable.Section6.12.20.Bstated"SigningtheAcceptanceBlockontheEquipmentClearanceOrderForm(Figure1)indicatesconcurrencethattheEquipmentClearanceOrderboundaryisadequatefortheworktobeperformed."ADM-09.04,Section6.12.23.A,requiredtheworkerstoperforma"verificationoftheEquipmentClearanceOrderboundaryutilizingavailablereferencematerials."
'L-98-168AttachmentP~ee2Contrarytotheabove:OnFebruary17,1998,thelicenseeissuedEquipmentClearanceOrder1-98-01-202Stoisolatethe1B1ReactorCoolantPumpsafely.a.TheReactorControlOperatorfailedtoverifyadequatelytheboundarypriortoissuance.b.TheWorkControlCenter-AssistantNuclearPlantSupervisorfailedtoverifythattheEquipmentClearanceOrdersatisfiedtherequirementsfortheClearancerequest.c.TheEquipmentClearanceOrderControllerfailedtoverifytheadequacyoftheEquipmentClearanceOrderboundaryfortheworktobeperformed.d.MultiplemaintenanceworkersfailedtoverifytheEquipmentClearanceBoundarypriortobeginningwork.OnMarch30,1998,thelicenseeissuedEquipmentClearanceOrder2-98-03-005toisolatethe2CIntakeCoolingWaterpump.ElectricalMaintenancepersonnelfailedtoverifythatthegroundingdeviceinstalledwasdocumentedintheclearanceorderpriortostartingthework.OnMarch31,1998,thelicenseeissuedEquipmentClearanceOrder2-98-03-.058toallowroutinemaintenanceofthe2BWasteGasCompressor.a.TheWorkControlCenter-AssistantNuclearPlantSupervisorfailedtoverifytheadequacyoftheclearancerequest.b.'heReactorControlOperatorfailedtoverifyadequatelytheboundaryoftheEquipmentClearanceOrderpriortoissuance.TheEquipmentClearanceOrderControllerfailedtoverifytheadequacyoftheEquipmentClearanceOrderboundaryfortheworktobeperformed.TheMaintenanceworkersfailedtoverifytheEquipmentClearanceBoundarypriortobeginningwork.ThisisaSeverityLevelIVviolation(SupplementI)applicabletobothUnit L-98-168AttachmentP~ee3R~esonce1.FPLconcurswiththeviolation.REASONFORVIOLATIONThereasonfortheviolationwascognitivepersonnelerror.inthattheclearanceprocedurewasnotcompliedwithduringdevelopmentandimplementationoftheclearancesforthe1B1reactorcoolantpump,2Cintakecoolingwaterpump,and2Bwastegascompressor.Theclearanceprocedurehasvariousbarriersinplacetoprecludeerrorsofthistypebyprovidingseverallevelsofverificationoftheadequacyofaclearance.However,certainclearanceprocedurebarrierswereine6ectiveinpreventingtheclearanceboundaryproblemsbecausetheprocedurewasnotfollowed.Forexample,the2BwastegascompressorclearancerequestsubmittedtoOperationsdidnotlisttheboundariesneededortheworktobeperformed.Boththe1B1reactorcoolantpumpand2Bwastegascompressorclearanceswereincorrectlydeveloped,andsubsequentOperationsandMaintenancesupervisoryandlinepersonnelindependentverificationswereinadequatelyperformed.The2CintakecoolingwaterpumpclearancedidnotdocumentthegroundingdevicebecausetheelectriciansdidnotinformOperationsthatthegroundingdevicehadbeeninstalled,asrequiredbytheclearanceprocedure.Alongwiththefailedbarriers,othercontributingfactorstotheviolationwereinadequatechecksintheElectricalDepartmentgroundingprocedure,andtheinadequateidentificationofpreventivemaintenancethatrequiresasystembemechanicallyopen.3.'ORRECTIVESTEPSTAKENANDTHERESULTSACHIEVEDA.AsdocumentedinConditionReport(CR)98-0297,the1B1reactorcoolantpumpclearancediscrepancywasnotedastheclearancewasbeingreleased,thereforetheequipmentclearanceorderwasnotrevised.B.AsdocumentedinCR98-0561,the2CintakecoolingwaterpumpclearancewasrevisedondiscoverytoincludethegroundingdeviceonMarch30,1998.C.AsdocumentedinCR98-0570,the2BwastegascompressorclearancewasrevisedondiscoverytoincludethemechanicalisolationvalvesonMarch31,1998.D.Individualsinvolvedwiththeseeventswerecounseledinaccordancewithplantpolic L-98-168AttachmentP~ee4'.CORRECTIVESTEPSTOAVOIDFURTHERVIOLATIONSA.StanddownmeetingsforOperationswerecompletedbyJune15,1998,todiscusscompliancewiththeclearanceprocedureandtheuseofquestioningattitudeswhendevelopingclearanceboundaries.B.Thebarrieranalysisidentifiedthatasignificantportionofthemissedclearanceprocedurebarriersoccurduringtheinitialdevelopmentandverificationofclearancerequests.St.LuciehasreconfiguredtheClearanceCenterinordertosegregatepersonnelresearchingandwritingclearancesfromdistractionsthatmaydetractfromtheirabilitytofocusonthetaskathand.Thishumanfactorsimprovementisintendedtominimizethelikelihoodofinadequateclearancedevelopment.C.Barringextenuatingcircumstances,'thenormalstaffingleveloftheClearanceCenterhasbeenincreased.Thishumanfactorsimprovement,alongwithcorrectiveaction4.Babove,willallowincreasedattentiontoeachindividualclearanceandisintendedtominimizethelikelihoodofinadequateclearancedevelopment.D.Anoperatoraidwascreatedtoassistinthedevelopmentofclearancesbylistingthevitalaspectsofthepreparationandimplementationofclearances.E.tTheElectricalMaintenanceGuidelinesEMG-53.08,Revision2,"SafetyRequirementforGroundingofHighVoltage(4.16or6.9KV)SwitchgearBusesforMaintenance,"andEMG-53'-07,Revision3,"GroundingorTestingofHighVoltag'e(4.16or6.9KV)Loads,"wereimplementedonMay7,1998,torequireasign-offverifyingthatOperationswasnotifiedoftheinstallationofgroundingdevices.St.Lucieisevaluatingmasterclearancesforpreventivemaintenanceandlubricationpreventivemaintenancetoidentifyandmodifythoseclearancesthatrequirethesystemtobeopen.ThisactivitywillbecompletedbySeptember30,1998.Inordertoreinforcemanagementexpectationsandequipmentclearanceproceduralrequirements,JobPerformanceMeasure(JPM)1321090P,"VerifyIn-PlantEq'uipmentClearance,"willberevisedtoensurethatMaintenancepersonnelarerequiredtoevaluatetheadequacyofequipmentclearanceorderboundaries,inaccordancewithproceduralrequirements,aspartoftheJPM.ThisJPMwillberevisedbyJuly17,199 L-98-168AttachmentP~ae55.FullcompliancewasachievedonMarch31,1998,withthecompletionofactionitems3.A,3.B,and3.Cabov L-98-168AttachmentP~ae6ViolationB10CFR50AppendixB,CriterionXVI,CorrectiveAction,requiresthatmeasuresshallbeestablishedtoassurethatconditionsadversetoquality,suchasfailures,malfunctions,deficiencies,deviations,defectivematerialandequipment,andnonconformancesarepromptlyidentifiedandcorrected.Inthecaseofsignificantconditionsadversetoquality,themeasuresshallassurethatthecauseoftheconditionisdeterminedandcorrectiveactiontakentoprecluderepetition.Theidentificationofthesignificantconditionadversetoquality,thecauseofthecondition,andthecorrectiveactiontakenshallbedocumentedandreportedtoappropriatelevelsofmanagement.Contrarytotheabove:1.Correctiveactionwasnotcompletedinatimelymannerfor1996Condition.Reports(CRs)thatidentified29procedurerevisionsneededtocorrectdeficiencies.PlantManagerActionItemshadbeenopenedin1996tomaketheseprocedurerevisionsandwerestillopeninApril1998.Correctiveactiontakenforasignificantconditionadversetoquality,thatwasidentifiedinFebruary1997inQualityAssuranceAuditQSL-CA-96-20anddocumentedinCR97-282,wasnotadequatetopreventrepetition.CR97-282documentedthatmultipleCRscontainedassignedcorrectiveactionsthatdidnotadequatelyaddressthedeficientconditions.AfollowupauditinDecember1997,QualityReport97-2271,foundthatfiveoutof29ConditionReportsagaincontainedassignedcorrectiveactionsthatdidnotadequatelyaddressthedeficientconditions.seCorrectiveactionrootcauseevaluationsrequiredbyprocedureAP-0006130,Revisions7-12,"ConditionReports,"werenotperformedforissuesidentifiedinConditionReport98-0112.ThiswassimilartofindingsidentifiedinQualityAssuranceAuditQSL-CA-96-20.ThisisaSeverityLevelIVviolation(SupplementI)applicabletobothUnits.R~esoese1.FPLconcurswiththeviolation.2.REASONFORVIOLATIONAcrossfunctionalplantteamwasformedtoinvestigatethecausesofthesubjectviolation.Theissuesnotedintheinspectionreportweredeterminedtobetheresultofanumberof QiL-98-168Attachment'~ae7causalfactors.Implementationofthecorrectiveactionprocessforsignificantconditionshasbeenlessthanadequatedueto:a)Insufficientadministrativecontrolsresultinginuntimelycorrectiveactionandthedevelopmentofabacklogofoutstandingcorrectiveactions(Example1).b)InsufficientManagementinvolvementinthecorrectiveactionprocess(Example2).Managementinvolvementinboththeup-frontprioritizationofConditionReportsandthebackendreviewofsignificantCRdispositionswasinadequatetopreventrecurrence.Additionally,theproceduralrequirementsfortheassignmentofrootcauseperAP-0006130,Revisions7-12,"ConditionReports,"didnotreflectthePlantGeneralManager'sroleindeterminingifaformalrootcauseanalysiswasrequired(Example3).CORRECTIVESTEPSTAKENANDTHERESULTSACHIEVEDA.AmorerigorousPlantManagerActionItem(PMM)systemwouldhavepreventedexample1ofthisviolation.PMAIsrelatedtoprocedurechangeswerenotgivenduedates,butwereassignedaprioritycodetoindicatetherelativeimportanceandneedfortheplannedprocedurerevisioninrelationtootherpendingprocedurechanges.TheprocedurerelatedPMAIprioritysystemwaseliminated,andallprocedurerelatedPMAIswillbegivenduedates.Thisactionwillbecompletedby,July31,1998.Ofthe29overdueprocedurerevisionsinexampleoneofthisviolation,16havebeendispositioned,andtheremainingprocedurerevisionswerereviewedand'valuatedandnewduedatesassigned.Itshouldbenotedthatseveralofthependingprocedurechangescitedinexample1areassociatedwithongoingupgradeprogramsonemergencyoperatingproceduresandannunciatorresponseproceduresmadebypreviouscommitments.B.Asnotedintheinspectionreport,thefiveCRsinexample2ofthisviolationthatdidnotadequatelyaddressthedeficientconditionswereadequatelydispositionedandcorrectiveactionsarecomplet L-98-168AttachmentP~ae8C.AP0006130,"ConditionReports,"hasbeenrevisedtoeliminateambiguityregardingtheassignmentofrootcauseanalysisforCRs.TheprocedurenowclearlystatesthatthePlantGeneralManagerwillindicatewhetherarootcauseanalysisisrequired.Anappendixtothisprocedureprovidesguidanceonmakingthisdetermination.Thiscorrectiveactioniscomplete.4.CORRECTIVESTEPSTOAVOIDFURTHERVIOLATIONSA.MethodswillbeestablishedtoensurethatseniorplantmanagersreviewsignificantCRsforproperdepartmentalassignmentandrootcauselevelatthemanagementmeetingeachday.ThesemethodswillbeoutlinedinCorrectiveActionGroupGuidelinesthatwillbedevelopedbyJuly10,1998.Therole,oftheFacilityReviewGroup(FRG)asitrelatestothereviewofCRswillbeexpanded.AP0010520"FacilityReviewGroup"willberevisedtoensurethattheFRGreviewstheresolutionofCRsforwhichrootcauseanalysishasbeenassigned.TheprocedurechangewillbedevelopedbyJuly10,1998.eAP0006129,"PlantManagerActionItem(PMAI)CorrectiveActionTrackingProgram,"willberevisedtoprovideadditionalcontrolsontheextensionofPMAIduedates;ControlswillbeestablishedsothatPMAIsdonotreceiveduedateextensionswithoutPlantManagerapproval.PMAIsrequiringchangestoplantprocedureswillreceivespecificduedates,consistentwiththeprioritizationeffortsoftheongoingprocedureupgradeprogram.ThesechangestoAP0006129,"PlantManagerActionItem(PMAI)CorrectiveActionTrackingProgram,"willbecompletedbyJuly10,1998.5.FullcompliancewillbeachievedonJuly31,1998,withthecompletionofcorrectiveaction3.Aabove.