Similar Documents at Cook |
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML17335A5551999-10-12012 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5591999-10-11011 October 1999 Supplement to Application for Amends to Licenses DPR-58 & DPR-74,replacing Correct TS Pages Inadvertently Included in 990923 Submittal.Attached Pages Also Include Appropriate Administrative Changes ML17335A5411999-10-0101 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Containment Recirculation Sump Water Inventory.Calculation & non-proprietary WCAP-15302 Rept Also Encl ML17326A1571999-09-23023 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,involving Movement of Loads in Excess of Design Basis Seismic Capability of Auxiliary Bldg Load Handling Equipment & Structures ML17326A1421999-09-17017 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,to Allow Credit of Rod Cluster Control Assemblies for Cold Leg Large Break LOCA Subcriticality.Ts Pages & non-proprietary Versions of WCAP-15246 Encl.Proprietary Version Withheld ML17326A1161999-09-10010 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0921999-08-17017 August 1999 Application for Amend to License DPR-58,to Change TS 3/4.4.5 & Bases for TS 3/4.4.5,3/4.4.6.2 & 3/4.4.8 to Remove voltage-based Repair Criteria,F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarify Bases Sections ML17325B6041999-05-21021 May 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Limitations of Positive Reactivity Additions in Several TS Action Statements ML17325B5511999-04-19019 April 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3/4.8.1.2, Electrical Power Systems & Associated Bases to Provide one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3661998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,adding TS for Distributed Ignition Sys ML17335A3631998-12-0303 December 1998 Application for Amend to License DPR-58,revising TS 3/4.7.7, Sealed Source Contamination & Associated Bases to Address Testing Requirements for Fission Detectors ML17335A3591998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,making Administrative Changes to Remove Obsolete Info,To Provide Consistency Between Units 1 & 2,to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3561998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases to Reflect Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A2631998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Containment Sys Bases 3/4.6.1.4 Re Internal Pressure & 3/4.6.1.5 Re Air Temp ML17335A2761998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2671998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3.4.1.3, RCS - Shutdown & Associated Bases to Provide Separate Requirements for Modes 4 & 5 with Loops Filled & Mode 5 with Loops Not Filled ML17335A2311998-09-14014 September 1998 Application for Amends to Licenses DPR-58 & DPR-74,changing Runout Limits for Safety Injection Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1901998-08-28028 August 1998 Application for Amend to License DPR-58,requesting Extension of SG Surveillance,Which TSs Require to Be Performed on or Before 990408,until End of Current Refuel Cycle Currently Scheduled for Mar 2000.W/assessment of SG Degradation & TSs ML17334A7471998-06-10010 June 1998 Application for Amends to Licenses DPR-54 & DPR-78,changing Implementation Date to Reduce Boric Acid Concentration in Boric Acid Storage Sys.Attachment 1 to Ltr Contains Description of Proposed Change & Justification for Change ML17334B7011998-03-0303 March 1998 Application for Amends to TS for Licenses DPR-58 & DPR-74, Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Plants TS 3/4.6.4 Bases ML17334B6561997-10-0808 October 1997 Application for Amends to Licenses DPR-58 & DPR-78,changing TSs 3/4.6.5 & 3/4.5.5 to Increase Both Minimum Required Ice Mass Per Ice Basket & Total Minimum Required Ice Mass. Proprietary Summary of Sump Inventory Calculations,Encl ML17333B0431997-09-19019 September 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9831997-08-11011 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2101997-08-0101 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig from TS ML17333A8281997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74, Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8311997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74,changing Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted ML17333A7121996-12-20020 December 1996 Application for Amends to Licenses DPR-58 & DPR-74, Requesting Rev of Reactor Coolant Pump Flywheel Insp Frequency ML17334B5941996-07-11011 July 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Support Operation of Unit 2 at Increased Core Rated Thermal Power of 3,588 Mwt.Rev 1 to WCAP-14489, ...Unit 2 3,600 Mwt Uprating Program Licensing Rept Encl ML17334B5901996-06-19019 June 1996 Application for Amend to License DPR-58,addressing Applicable Requirements of NRC GL 95-05, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking. ML17334B5891996-06-11011 June 1996 Application for Amends to Licenses DPR-58 & DPR-74,removing TSs Certain Requirements for Administrative Controls,Related to QA Requirements,Per Administrative Ltr 96-05 ML17333A4201996-04-0808 April 1996 Application for Amends to Licenses DPR-58 & DPR-74,moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3551996-03-12012 March 1996 Application for Amend to License DPR-74,removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3, 4 & 5 ML17334B5751996-02-29029 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Reduce Boric Acid Concentration in Boric Acid Storage Sys from Approx 12 Percent to Approx 4 Percent by Weight. Technical Rept Presenting Justificaion for Changes Encl ML17334B5741996-02-26026 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.6.2 to Increase Current Limit on Nominal Fuel Assembly Enrichment for New,Westinghouse - Fabricated Fuel Stored in New Fuel Storage Racks ML17333A3201996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3151996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A2641996-01-12012 January 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2391995-12-19019 December 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 3/4.6.1.2,3/4.6.1.3,3/4.6.1.6 & 3/4.6.1.6 to Require Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) to Be Performed Per 10CFR50,App J Option B ML17332B0111995-11-10010 November 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising Ts,By Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9971995-10-20020 October 1995 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Add Exemption to TS 4.0.4 in Surveillance Requirements for MSIV ML17332A9111995-08-0606 August 1995 Application for Amends to Licenses DPR-58 & DPR-74,informing That Licensee Has 45 Days from Date of Issuance to Implement Amend Unless Otherwise Specified ML17334B5561995-08-0404 August 1995 Application for Exigent Amend to License DPR-58,modifying TS 4.4.5.4 & 4.4.5.5 for Repair of Hybrid Expansion Joint Sleeved SG Tubes.Proprietary W Rept WCAP-14446, Repair...Of Hybrid Expansion Joint...Tubes Encl.W Rept Withheld ML17332A8271995-06-30030 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,changing TS Section 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02, Suppl 1 ML17334B5501995-06-20020 June 1995 License Amend Request to Licenses DPR-58 & DPR-74,to Remove Requirements for Fire Protection Systems from Licenses & Guidance in GL 86-10,GL 88-12 & GL 93-07 ML17332A7991995-06-15015 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H ML17334B5481995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Support Operation of Unit 1 at SG Tube Plugging Levels Up to 30%,make One Unit 1 TS More Nearly Like Corresponding Unit 2 TS & Maintain Consistency of Unit 2 Criteria ML17334B5461995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying Tech Specs 3/4.3.1 (Reactor Trip Sys Instrumentation) & 3/4.3.2 (ESFAS Instrumentation) & Bases to Relocate Tables of Response Time Limits to Ufsar,Per GL 93-08 ML17332A7661995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Incorporate Cycle & Burnup Dependent Peaking Factor Penalty ML17332A7741995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02,Suppl 1 ML17332A7771995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Table 4.3-2 to Change Main Steam Line Isolation Valve Manual Actuation Sys Surveillance Frequency from Monthly to Quarterly 1999-09-23
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17335A5551999-10-12012 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5591999-10-11011 October 1999 Supplement to Application for Amends to Licenses DPR-58 & DPR-74,replacing Correct TS Pages Inadvertently Included in 990923 Submittal.Attached Pages Also Include Appropriate Administrative Changes ML17335A5411999-10-0101 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Containment Recirculation Sump Water Inventory.Calculation & non-proprietary WCAP-15302 Rept Also Encl ML17326A1571999-09-23023 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,involving Movement of Loads in Excess of Design Basis Seismic Capability of Auxiliary Bldg Load Handling Equipment & Structures ML17326A1421999-09-17017 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,to Allow Credit of Rod Cluster Control Assemblies for Cold Leg Large Break LOCA Subcriticality.Ts Pages & non-proprietary Versions of WCAP-15246 Encl.Proprietary Version Withheld ML17326A1161999-09-10010 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0921999-08-17017 August 1999 Application for Amend to License DPR-58,to Change TS 3/4.4.5 & Bases for TS 3/4.4.5,3/4.4.6.2 & 3/4.4.8 to Remove voltage-based Repair Criteria,F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarify Bases Sections ML17325B6041999-05-21021 May 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Limitations of Positive Reactivity Additions in Several TS Action Statements ML17325B5511999-04-19019 April 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3/4.8.1.2, Electrical Power Systems & Associated Bases to Provide one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3661998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,adding TS for Distributed Ignition Sys ML17335A3631998-12-0303 December 1998 Application for Amend to License DPR-58,revising TS 3/4.7.7, Sealed Source Contamination & Associated Bases to Address Testing Requirements for Fission Detectors ML17335A3591998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,making Administrative Changes to Remove Obsolete Info,To Provide Consistency Between Units 1 & 2,to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3561998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases to Reflect Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A2631998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Containment Sys Bases 3/4.6.1.4 Re Internal Pressure & 3/4.6.1.5 Re Air Temp ML17335A2761998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2671998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3.4.1.3, RCS - Shutdown & Associated Bases to Provide Separate Requirements for Modes 4 & 5 with Loops Filled & Mode 5 with Loops Not Filled ML17335A2311998-09-14014 September 1998 Application for Amends to Licenses DPR-58 & DPR-74,changing Runout Limits for Safety Injection Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1901998-08-28028 August 1998 Application for Amend to License DPR-58,requesting Extension of SG Surveillance,Which TSs Require to Be Performed on or Before 990408,until End of Current Refuel Cycle Currently Scheduled for Mar 2000.W/assessment of SG Degradation & TSs ML17334A7471998-06-10010 June 1998 Application for Amends to Licenses DPR-54 & DPR-78,changing Implementation Date to Reduce Boric Acid Concentration in Boric Acid Storage Sys.Attachment 1 to Ltr Contains Description of Proposed Change & Justification for Change ML17334B7011998-03-0303 March 1998 Application for Amends to TS for Licenses DPR-58 & DPR-74, Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Plants TS 3/4.6.4 Bases ML17334B6561997-10-0808 October 1997 Application for Amends to Licenses DPR-58 & DPR-78,changing TSs 3/4.6.5 & 3/4.5.5 to Increase Both Minimum Required Ice Mass Per Ice Basket & Total Minimum Required Ice Mass. Proprietary Summary of Sump Inventory Calculations,Encl ML17333B0431997-09-19019 September 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9831997-08-11011 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2101997-08-0101 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig from TS ML17333A8281997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74, Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8311997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74,changing Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted ML17333A7121996-12-20020 December 1996 Application for Amends to Licenses DPR-58 & DPR-74, Requesting Rev of Reactor Coolant Pump Flywheel Insp Frequency ML17334B5941996-07-11011 July 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Support Operation of Unit 2 at Increased Core Rated Thermal Power of 3,588 Mwt.Rev 1 to WCAP-14489, ...Unit 2 3,600 Mwt Uprating Program Licensing Rept Encl ML17334B5901996-06-19019 June 1996 Application for Amend to License DPR-58,addressing Applicable Requirements of NRC GL 95-05, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking. ML17334B5891996-06-11011 June 1996 Application for Amends to Licenses DPR-58 & DPR-74,removing TSs Certain Requirements for Administrative Controls,Related to QA Requirements,Per Administrative Ltr 96-05 ML17333A4201996-04-0808 April 1996 Application for Amends to Licenses DPR-58 & DPR-74,moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3551996-03-12012 March 1996 Application for Amend to License DPR-74,removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3, 4 & 5 ML17334B5751996-02-29029 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Reduce Boric Acid Concentration in Boric Acid Storage Sys from Approx 12 Percent to Approx 4 Percent by Weight. Technical Rept Presenting Justificaion for Changes Encl ML17334B5741996-02-26026 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.6.2 to Increase Current Limit on Nominal Fuel Assembly Enrichment for New,Westinghouse - Fabricated Fuel Stored in New Fuel Storage Racks ML17333A3201996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3151996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A2641996-01-12012 January 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2391995-12-19019 December 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 3/4.6.1.2,3/4.6.1.3,3/4.6.1.6 & 3/4.6.1.6 to Require Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) to Be Performed Per 10CFR50,App J Option B ML17332B0111995-11-10010 November 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising Ts,By Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9971995-10-20020 October 1995 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Add Exemption to TS 4.0.4 in Surveillance Requirements for MSIV ML17332A9111995-08-0606 August 1995 Application for Amends to Licenses DPR-58 & DPR-74,informing That Licensee Has 45 Days from Date of Issuance to Implement Amend Unless Otherwise Specified ML17334B5561995-08-0404 August 1995 Application for Exigent Amend to License DPR-58,modifying TS 4.4.5.4 & 4.4.5.5 for Repair of Hybrid Expansion Joint Sleeved SG Tubes.Proprietary W Rept WCAP-14446, Repair...Of Hybrid Expansion Joint...Tubes Encl.W Rept Withheld ML17332A8271995-06-30030 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,changing TS Section 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02, Suppl 1 ML17334B5501995-06-20020 June 1995 License Amend Request to Licenses DPR-58 & DPR-74,to Remove Requirements for Fire Protection Systems from Licenses & Guidance in GL 86-10,GL 88-12 & GL 93-07 ML17332A7991995-06-15015 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H ML17334B5481995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Support Operation of Unit 1 at SG Tube Plugging Levels Up to 30%,make One Unit 1 TS More Nearly Like Corresponding Unit 2 TS & Maintain Consistency of Unit 2 Criteria ML17334B5461995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying Tech Specs 3/4.3.1 (Reactor Trip Sys Instrumentation) & 3/4.3.2 (ESFAS Instrumentation) & Bases to Relocate Tables of Response Time Limits to Ufsar,Per GL 93-08 ML17332A7661995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Incorporate Cycle & Burnup Dependent Peaking Factor Penalty ML17332A7741995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02,Suppl 1 ML17332A7771995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Table 4.3-2 to Change Main Steam Line Isolation Valve Manual Actuation Sys Surveillance Frequency from Monthly to Quarterly 1999-09-23
[Table view] |
Text
REGULATORY ORtlATION DISTRIBUTION SY8(BIDS)ACCESSION NBR:8012180315 DOC~DATE:80/12/10NOTARIZED:
NODOCKETFACIL:50-315 DonaldC,CookNuclearPowerPlantrUnitirIndiana80500031550-316DonaldC.CookNuclearPowerPlantrUnit2rIndianaL05000316AUTH,NAMEAUTHORAFFILIATION HUNTERrR~STIndianaltMichiganElectricCo~RECIP~NAMERECIPIENT AFFILIATION DENTONrH+R
~OfficeofNuclearReactorRegulationr Director
SUBJECT:
ForwardsproposedplantsysTechSpecs8licenseconditions incorporating CategoryAlessonslearnedrequirementsrin responsetoNRC800702ltdDISTRIBUTION CODEeA001SCOPIESRECEIVED:LTR ENCLSIZE:jTITLE:GeneralDistribution forafterIssuanceofOperating LicenseNOTES;ILE:3copiesallmaterial.
Send3copiesofallmaterialtoIE,ED0500031505000316RECIPIENT IDCODE/NAME ACTIONVARGArSe04INTERNAL:
D/DIRrHUM FAC0818,E06OF11GFILE01COPIESLTTRENCL131311RECIPIENT IDCODE/NAME DIRrDIVOFLICNRCPDR02ORASSESSBR10COPIESLTTRENCL111110EXTERNAl:
ACRSNSIC0905ib1611LPDR03110<<aa)go~TOTALNUMBEROFCOPIESREQUIRED:
LTTRqOENCL krwa0l'lHkQj~~r INDIANALMICHIGANELECTRICCOMPANYP.O.BOX18BOWLINGGREENSTATIONNEWYORK,N.Y.10004December10,1980AEP:NRC:00449 DonaldC.CookNuclearPlantUnits1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74LessonsLearnedTechnical Specifications CD*~C->a~cafOC<fIllRCDMr.HaroldR.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555
DearMr.Denton:
Thisisinresponse'o Mr.D.Eisenhut's letterdatedJuly2,1980proposing Technical Specifications andcertainlicenseconditions fortheCategory"A"LessonsLearned(NUREG-0578) requirements implemented attheDonaldC.CookNuclearPlant.TheCookPlanthasbeenoperating withStandardTechnical Specifi-cations(STS).Assuch,manyofthechangessuggested inthemodelSTSfortheLessonsLearneditemscontained inMr.Eisenhut's letterarealreadyincludedintheCookPlantTechnical Specifications.
OurproposedTechnical Specifications (Attachment 2and3)arebasedonrevisi'ons totheexistingCookPlantTechnical Specifications forUnits1and2andwhereapplicable, updatedtoincludethescopeoftheCategory"A"itemsascontained intheSafetyEvaluation Report(SER)forCookPlantcompliance withtheCategory"A."requirements, issuedonMarch20,1980.Norevisions arebei'ngproposedtoaddresswordingdifferences orformatdeviations fromthosecontained inthemodelSTSfortheLessonsLearneditems.Attachment 1containsabriefdiscussion ofeachoftheTechnical Specification revisions proposedinAttachment 2and3.Attachment 4containstheproposedlicenseconditions
'forUnits1and2oftheCookPlant.Enallinstances thecontentofthemodelSTSofMr.Eisenhut's letterwasusedasguidanceinthepreparation oftheCookPlantspecificTechnical Specifi'cations.
oo/5
'I~s<tNllarf'IC,gI~,~C*'~I Nr.HaroldR.DentonDirectorAEP:NRC:00449 TheproposedTechnical Specification revisions andlicenseconditions contained intheAttachments tothisletterhavebeenreviewedbythePNSRCandtheNSDRCasrequiredbyourTechnical Specifications.
Thesereviewsconcluded thattheproposedTechnical Specification revisions andlicenseconditions donotconstitute anunreviewed safetyquestionandwillnotad-verselyaffectthehealthandsafetyofthepublic.I8MElectricCo.interprets 10CFR170asrequiring thatnofeeaccompany thissubmittal.
4Verytrulyyours,R.S.unterVicePresident cc:R.C.CallenG.CharnoffR.S.HunterR.W.Jurgensen D.V.Shaller-BridgmanNRCRegionIIIResidentInspector atCookPlant-Bridgman
'l ATTACHMENT 1TOAEP:NRC:00449 Thisattachment brieflydescribes theTechnical Specification revisions contained inattachments 2and3toAEP:NRC:00449.
Therevisions toexistingCookPlantTechnical Specifications aredenotedbybarsintherighthandmargin.Theappropriate revisions totheBasesarealsoin-cludedintheseattacj'ments.
MeareorderingtheseTechnical Specifications
~changesinamannerconsistent withthenumbering ofourTechnical Specifi-cations.Auxiliary Feedwater SstemSecifications
'Thefollowing existingTechnical Specifications havebeenrevisedtoincorporate theautomatic initiation requirements intotheEngineered SafetyFeatureActuation Systemspecifications assetforthinthemodelTechnical Specifications ofMr.Eisenhut's letter.a}~Secification 3/4.7.1.2
-Units1and2(Page-3/4 7-6ofbothUnits)Mehaveremovedtheautomatic startingsignalslistedunderSurveillance Requirement 4.7.1.2.b re-placingthemwiththeappropriate ESFactuation testreference tobeperformed underSpecification 3/4.3.2.Thisisinaccordance withthemodelTechnical Specifi-cationsofl1r.Eisenhut's letter.b)Secification 3/4.3.2-Units1and2Tables3.3-3,3.3-4,3.3-5and4.3'-2ofbothUnits.1and2havebeenrevisedtoincorporate intothemtheautomatic initiation requirements forauxiliary feedwater.
Basically, therequirements formerlyinSpecification
-4.7.1.2.b havebeenincorporated intotheirappropriate sectionofSpecification 3/4.3.2.Thisincludesa)theLCOfortheinstrumentation, b)thesetpoints/allowable values,whereapplicable, c)thesystemresponsetimes'andd)theappropriate surveillance requirements.
OurexistingTechnical Specifications 3/4.3.2(units1and2)in-cludingtherecentamendments for."GridDegradedVoltage"havealreadypuimanyoftheAFHrequirements contained inthemodelTechnical Specifications ofMr.Eisenhut's letterintotheCookPlantTechnical Specifications.
Assuchveryfewrevisions tothesetablesarenecessary andareindicated oytherevisionbars'intherighthandmarginoftheaffectedpages.
0 Additionally, inUnit1only(Attachment 2),wehaveincludedundertheSafetyInjection functioninSpecification 3/4.3.2theautostartrequirement fortheHotorDrivenAuxiliary Feedwater Pumps(NDAFP)byre-visingtheheadingof"Functional Unit"Sectionl.ontables3.3-3(page3/43-16),3.3-4(page3/43-24)and4.3-2(page3/43-31)toincludethel<DAFP's.
Thisrequirement isalreadyincorporated inthecorresponding existingUnit2Technical Specifications andtheyneednotberevisedtomeettheLessonsLearnedrequirements.
Secification 3/4.3.3.8 ND!-Unit1Secification 3/4.3.3.6
-Unit2TheexistingTechnical Specification forPost-Accident Instru-mentation inUnit2hasbeenrevisedtoincludetheapplicable monitoring instrumentation fortheCategory"A"LessonsLearneditemsonTables3.3-10and4.3-10anddeletionoftheSteamGenerator widerangelevelindication fromthesametablesasapost-accident monitoring instrument.
TheUnit1Technical Specifications currently donotcontainaspecification forpost-accidentinstrumentation.
Assuch,therevisedUnit2Specification 3/4.3.3.6 isbeingproposedinitsentiretyinUnit1asanewSpecification 3/4.3.3.8.
Heareaddingthisattheendof.theInstrumentation sectionoftheUnit1Technical Specifications asanewitem'oavoidextensive pagerenumbering.
TheapprovedCookPlantpost-accident moritoringinstrumentation fortheCategory"A"LessonsLearneditemsinclude.(Reference 1):a)Auxiliary feedwater flowratechannels.
Thesechannelscanbesubstituted forbyusingthecorresponding steamgenerator waterlevelchannelintheeventthattheAFHflowratechannelsbecomeinoperable.
BothsystemssatisfytheLessonsLearnedrequirements (Reference 1).InthiscasetheLCOismetandnofurther-actionisre-quired.rb)RCSsubcooling marginmonitor.Thiscanbe.substituted forbyusingthePlantcomputer(PRODAC-250) readoutofsubcooling marginintheeventthatthesubcooling monitorbecomesinoperable.
BothsystemssatisfytheLessonsLearnedrequirements (Reference 1).InthiscasetheLCOismetandnofurtheractionisrequired.
c)PORVpositionindication.
Thestem-mounted limitswitchesprovidedirectvalvepositionindication incompliance withtheLessonLearnedrequirements.
Theacousticmonitoring systemindication whichisalsoinstalled, canbesubstituted forthelimitswitchin-dication.
BothsystemssatisfytheLessonsLearnedrequirements (Reference 1).InthiscasetheLCOismetandnofurtheractionisrequired.
3&40d)'ORVblockvalvepositionindication.
Thestem-mounted limitswit'ches providedirectvalvepositioniiydication incompliance withtheLessonsLearnedrequirements.
Pe)':Safetyvalvepositionindication.
Theacousticmonitoring systemprovidesthedirectvalvepositionindication incompliance withtheLessonsLearnedrequirements.
The"SteamGenerator WaterLevel-WideRange"channelhasbeen.deletedfromtheUnit2tables,andhasnotbeenincludedinthecorre-spondingproposedUnit1tablesforthefollowing reasons.TheSteamGenerator HideRangeHaterLevel(SGWRML)instrumentation doesnotperformanysafety-related functionandisnotassumedoperableinthevariousplant.safetyanalyses.
Assuch,theSGWRWLInstrumentation isnotincludedwithinthescopeofIEBulletinNo.'9-01B.
TheSGNarrowRangeWaterLevelInstrumentation (3channels/loop) isseismically andenvironmentally qualified andiscorrectly includedin.tableNos.3.3-10and4.3-10.Thenarrowrangeinstrumentation fulfillsallpost-accident monitoring require-mentsforSGlevelindication'nd isreferenced intheemergency operating procedures.
Secification 3/4.4.4-Units1and2TheexistingTechnical Specification forthePressurizer hasbeen.revisedtoinclude,withintheLimitingCondition forOperation (LCO),therequirement foroperability ofatleast150kWofheaters.Thisisthenecessary capacitytohaveavailable withinone(1)hourformaintaining adequatesubcooling while'ntherraturalcirculation coolingmode.TheexistingLCOcoversadequately therequirement forPressurizer levelin-strumentation sincethisequipment isusedtoverifythatthePressurizer isnon-water solidbymaintaining acertainwatervolume.Thevalueusedisconsistent withthatusedinourproposed.over-pressurization protection Technical Specification.
Thecorresponding ACTIONoftheLCOandtheSurveillance Requirements havebeenrevisedtoincludetheneviadditional requirements contained inthemodelTechnical Specifications ofHr.Eisenhut's July'2,1980letter.Secification 3/4.4.11-NEW-Units1and2TheproposedTechnical Specification fortheReactorCoolantSystemPowerOperatedReliefValves(PORVs)andBlockValves(BVs)isanewspecifi-cationfortheCookPlant.Wehaveappropriately includedthisspecification withinthesectionoftheTechnical Specifications coveringtheReactorCoolantSystem(3/4.4)andtoavoidextensive re-numbering ofexistingTechnical Spec-ifications weareaddingitattheendof'section 3/4.4asanewSpecification 3/4.4.11.
TheCookPlantdesigncontainsthree(3)PORYsandeachhasacorresponding BV:ThePORVsarespring-closed, air-to-open uponactuation oftheircorresponding solenoidcontrolvalve.ThesolenoidvalveandtheBVareelectrically operated(theBVbeingamotoroperatedvalve)andpow'eredfromtheemergency buses.Thegeneric)lestinghouse analysesperformed forafourloopplantinclude'onlytwoPORY'sandassociated BV's.TheproposedActionstate-mentallowsforoperational modechangesintheCookPlantwithone(1)ofthePORY'sorBV'sinoperable, providedofcoursethatthereliefpathis'solated.
Also,thereporting requirements arenotapplicable inthecaseofone(1)PORYorBVinoperable.
Thisadditional flexibility iswarranted sincetheCookPlantdesigndiffersfromthegeneric4loopwestinghouse Plantandsincetherequiremen't toisolatetheinoperable reliefpath(other-wiseshutdowntheplant)isnotwaived.AlloftheapprovedgenericanalysesremainvalidfortheCookPlantevenwithone'ORYorBV(reliefpath)in-operableandisolated.
Therearetwowaystoisolateareliefpathdepending onwhetherthePORY'ortheBVisinoperable.
Inthecaseofaninoperable PORY'which cannotberestoredtooperablestatustheassociated BYmustbeclosedandpowerremoved.Inthecaseofaninoperable BVwhichcannotberestoredtooperablestatusandtheBVcannotbeclosedor'owerremoved,theassociated PORVcanbeclosedandpowerremovedfromitsassociated SolenoidValve.'hese actionrequirements holdforallthree(3)ofCook'sPORY's/BV's other-wiseplantshutdownisrequired.
Theseprovisions areconsistent withthemodelTechnical Specifications contained inMr.Eisenhut's letter.Thepro-visiontoclosethePORVandremovepowerfromitsassociated SolenoidValvewithaninoperable BYassuresthatthereliefpathonce.isolatedinthismannerwillremainisolated.
OfcoursewhentestingtheBYandActionState-ments3.4.ll.aor3.4.1l.careapplied,theprovisions of4.0.4arenolongerapplicable sincethepreference istokeepthereliefpathwithinoperable equipment inanisolatedcondition.
Theexemption isincludedinthecorre-spondingsurveillance requirements.
Asmentioned abovethepowersuppliesfortheBV'sandthePORY'sarefromtheemergency buses.Thisisapermanent featureintheCookPlantdesign.Assuch,thesurveillance requirement fortestingof.theemergency powersuppliescontained inHr.Eisenhut's modelTechnical Specification doesnotapplytoCookPlantsincetheseelectrical powersourcesarepermanently connected totheemergency safeguards buses.Inordertomeettheintent'ofthemodelTechnical Specification surveillance requirement wehaveincludedtheprovision totestthePORV's/BV's whentheemergency safeguards busesareenergized bythedieselgenerators andplantbatteries inconjunction withthecorresponding 18monthssurveillance requirements for'thisequipment.
ThePORV'sandBV'sarejustanelectrical loadconnected totheemergency safeguards busesand,thus,therequiredsurveillance willbeperformed whenthesebusesareenergized fromtheiremergency powersources.
~~J InadditioninUnit1wehaverevisedSpecification 4.0.3onpage3/40-2tobeconsistent with4.0.3ofUnit2andnotrequiresurveillance oninoperable equipment.
Forexample,thisbecomesneces-sarywhenareliefpathisisolatedbecauseofinoperable equipment, vihoseoperation toperformrequiredsurveillance couldcausealossofRCSpressureboundary.
Performance oftheBYcyclingtestsuggested inthemodelTechnical Specifications whenthePORVinthesamereliefpathis.inoperable andtheBVhastobeclosedandmadeinoperable
{powerremoved).inaccordance withthecorresponding Actionrequirements wouldbeundesirable sinceitwouldrequirere-opening thatBV.Assuch,addingthisprovision
.to4.0.3inUnit1becomesnecessarv andagreeswit}i4.0.3inUnit2;----Table3.6-1:Containment'solation Valves-Units 1and2Asecond'fail-closed'ir operated.containment isolation valve,gCR-301,-isbeinginstalled intheletdown;line totheletdownheatex-changertoaddresstheNRCconcernsetforthinItem2.1.4oftheCommission safetyevaluation ofIMECo.compliance withtheCategory'A'essonLearnedRequirements datedMarch20,1980.Technical Specification Table3.6-1ofbothUnits1and2isbeingrevisedtoincorporate
'thisvalve.Therevisiontothisexistingspecification shouldbecomeeffective uponinstallation ofthenewcontainment isolation valve.Anexactinstallati'on datehasnotbeendetermined sincethisneviequipment.
hasalongprocurement leadtime(18mos.).Inanycase,arefueling outageisrequiredtoperformthismodification.
TherestoftheNRC-proposedTechnical Specification isalreadyapartoftheCookPlantTechnical Specifications.
Table6.2-1-.Units'1and2bTherequirement tohaveaShiftTechnical Advisor(STA)ondutyinModes1,2,354hasbeenincludedinthistableonTechnical Specifi-cationpage6-4forbothUnits1and2.ASTAisondutyforbothUnits1and2asasharedfunction(appropriately footnoted) incompliance withtheLessonsLearnedrequirements.
Secification 6.3-Units'1and2Thefacilitystaffqualification requirements havebeenrevisedtoincorporate thoserequirements applicable totheSTA.UndertheapprovedCookPlantSTAprogram,fullcompliance withthesestaffqualifi-'ationrequirements willbeachievedbyJanuary1,1981.MeproposethisTechnical Specification revisionnow{applicable tobothUnits182)totakeeffecton1/1/81incompliance withtheLessonsLearnedrequirements.
Reference 1:NRCSafetyEvaluation "Reportforcompliance withthecategory"A"LessonsLearnedrequirements datedMarch20,1980.