/03L-0:on 800224,during Startup W/Mode Switch in Startup & Hot Standby,Hpci Sys Did Not Become Operational at 133 Psig Per Tech Specs.Caused by Design Deficiency & Instrument Drift.Pressure Switches Recalibr
ML19312D182
Person / Time
Site: Hatch 
Issue date: 03/10/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19312D181 List:
References
LER-80-023-03L-01, LER-80-23-3L-1, NUDOCS 8003210416
Download: ML19312D182 (2)


LER-1980-023, /03L-0:on 800224,during Startup W/Mode Switch in Startup & Hot Standby,Hpci Sys Did Not Become Operational at 133 Psig Per Tech Specs.Caused by Design Deficiency & Instrument Drift.Pressure Switches Recalibr
Event date:
Report date:
3211980023R03 - NRC Website

text

IC t

LICENSEE EVENT REPORT g

CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT CH TYPE ALL C.EQEHRED INFORMATION) i e

i l cl 'Al El 1l Hl 1l@l 0] 0 l 0l 0 l 0 l 0 l 0 l 0 l 0 l O l 0 l@l 4 l 1 l 1 l 1 l l jh!

l l@

d o

7 8 9 LICENSEE COOL 14 16 LICEnst NUMtstra 25 26 LICENSE TvrE Jo 61 C A T f,8 l Lhl 0l Sl0~lOl0l3l2l1hl01212l41 A l O lhl O l 3 l Il 0l 8 l 0 l@

7 8

60 61 OOCKET NUMBER E.3 trJ EVENT DATE 74 75 HEPOf t T DATE 41 0 EVENT DESCRIPTION AND PRODADLE CONSEQUENCES h o 2 l During Reactor startup with the mode switch in startup_nnd hot standby.

(

the llPCI system did not become operational at 113'psig as specified in l

o 3 y.

o 4 1

Technical Specifications 3.5-0.1.

The system was not operational l

.h O s l until 127 psig. There were no ef fects upon public health and safety due l

i l 0 l6 l l to this event. This is a repetitive occurrence as last reported on j

l0 lij l Reportable Occurrened Report No. 50-321/1979-106.

I j

I d

1018] I

{

80 7

es "cS'E

'^"$E s'oC$0E COVPONE NT CODE SUB D'E SU1C CO E

lS lF l@ dh Wh lIlN l S lT l R lU lh W@ y h o 9 7

8 9

to 18 12 13 18 19 20 SEQUENTI AL OCCUR R E NCE REPORT RE VISION EE R EVENTYEAR REPORT NO, CODE TYPE N O.

O sgg/Ho l8l01 L-J l o 12131 Ld.]

10 13 i L L_1 l _1 10 I a

21 22 23 24 26 27 78

?J 30 31 32 K N AC ON O PLANT A ET 4 HOURS

$8 ITT FORLi b 8.

SUPPL 1 i MAN A RE Ft

[_E_J@l G l@

[_Z j@

[Z_j@

l0l0l0l0l W@

W@

[N j@

[Bl0l6l9l@

JJ 34 35 36 3/

40 el 42 43 44 47 CAUSE DESCniPTION ANDCORRECTIVE ACTIONS h gl This failure is due to a design deficiency and instrument drift. The l

1111 l l Present design does not allow a trip'at 100 psig and reset at 113 paig.

l 3, ;

The pressure switches were recalibrated to specifications. Future cor-l i 3 l

rective action includes a design change to the pressure switchen and the l

3 l4 g l pursuit of a document change to the present Tech Specs.

l 80 7

8 9 A

  • 4POWEH oTHER STATUS IS O EH [HSCOVERY DESCnlPTION y@ [ 0 l 0 l 4 l@l NA l

lAl@l Operator Obnervation l

i 5 A8nviTv c5 TENT 4

r: ELE ASED Of 84ELEASE AMOUNT OF ACTIVITY EoCATION OF FIELEASE NA l

l NA l

l1]6l W h [2,l@l PERsOEc"t ExPosuSES oEsCmPTioN h NueneR Tyre NA l

Unj lo 1010 l@lZ l@l 8

PERSONNE't imu'd:Es

  1. ~

otsCmPHON@

Nuvu n

[T[2]l0l0l0l@l NA l

80 7

8 9 11 12 LOSS OF Olt DAVAGE TO FACILtTV 1YFC Df3CRIP flCN

'NA l

Whl I

83 7

8y 10 [N hl ESCHIPTION D

ISSUE

^

NA l

l l l l l l l l l l l-l l 3 2 o frR 69 80 ;;

l 7 8; 9.

10

. T. Nix PHONE:

~

8 0 0 3210 W(,

O NAME OF PHEPAREH

P_.

w2.gg

')

s pt (c; W L -

Y 4

g l_

\\

+

r d

T.

NARRATIVE REPORT-M w
Ceorgia Pober. Company;

< Plant. E. " I., llatch ;

Baxley,1 Georgia.31513)

Reportable -. Occurrence Report No. 321/1980-23.

DuringEreactor startup with' the mode switch in. startup' and hot standby position,

the IIPCI System did nor -becomo operational: at 113 psig 'as specified in Technical

- (Specifications Section 3.5.D.'1.

There were no effects upon public health and

~

r safety'duetto.this event. This is a repetit!1ve occurrence as last _ reported on Reportabic Oclcurrene,c - Report. No. 321/1979 106. This report addressed i

the problem of IIPCI Lisointing at 116' psig. Tachnical Specification Section 3.5-D.1 requires that 11PCI be operational:if.the reactor pressure is greater thanill3Lpsig. Prior 'to LER.50-321/1979-106, the switches, IE41-N001A-D, setpoint was:125 poig. '-This setpoint complied with Tech Specs requirement Table 3.2.2 which requires the switches to be set equal to or greater than 1000psigi sbut ;does not comply ~ with Tech Specs Section. 3.5-D.1 which required.

_'llPCI tolhe. operational rt 113 psig. The inherent: prob 1cm was first recognized at.'this point. A' design change-was submitted to change the netpoint to a'value 6

greaterithan'100 psig but Icos than 113 psig.

e j.q

.On February 24,1980' 11PCI'did not become operational at reactor pressure c qual to 'or; greater. than ' 113 psig. The calibration of the llPCI Steam Line

({,,,

c Low Pressure Switches was checked and found as follows:-

N001A. trip 90.7' psi, reset 127.7 psi.

~ N001B trip 98.7 psi,. reset.123.7 pai.

N001C trip 100.7 psi, reset.13'2.7 psi.
N001D.LYip 98.7 pai, reset 123.7 psi.

1Three of the-switches A,' B and D were found below the acceptance criteria

~

K

~ of' actuation ~at - greater thmi 100 psig.: The exoccted actuation point is

'The dif ference' between the ' expected actuation and the L'

- 10. 5 - c5. psi.

6 Jactual trip point is attributed to instrument setpoint drift.

i 1The manufacturer of these switches is Darksdale.. The' specifications of-the

('

switch permit-a react span different'.alc of 11 to 40 psig and.is not adjustabic.

Decause of the wide differential, the switches cannot be adjusted to meet the Spresent Tech Spec requirements.-

The planned eorrective;" action willIinclude t!io following.
A design: change to T

A','

the pressure switches to meet the Technical Specification requirements.is being e

g Jinvestigatedh. Unit.II Tdchnical, Specifi' cations (Standard Tech Specs)- require 3

~

s ithat -11PCI be' operational at pressures cqual'to or greater than 150 psig.' AJ fe$;

< proposal"to' change Unit [I Tech ' Specs concerning 11PCI:to Standard Tech Specs 'is sq.

  • Theing7 investigated. : A follow-up. report will be submitted.z