IR 05000445/2012404

From kanterella
Revision as of 08:52, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
IR 5000445-12-404 & 05000446--12-404, on 01/12/2012, Comanche Peak Nuclear Power Plant-NRC Security
ML120340330
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/01/2012
From: Hay M
Plant Support Branch-1
To: Flores R
Luminant Generation Co
References
IR-12-404
Download: ML120340330 (4)


Text

UNITE D S TATE S NUC LEAR REGULATOR Y C OMMI S SI ON ary 1, 2012

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT- NRC SECURITY INSPECTION REPORT 05000445/2012404 AND 05000446/2012404

Dear Mr. Flores:

On January 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Comanche Peak Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 12, 2012, with Mr. M. Lucas, Site Vice President, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

There were no NRC-identified or self-revealing findings identified during this inspection.

However, a licensee-identified violation which was determined to be of very low security significance is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest any NCV in the enclosed report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspectors at Comanche Peak Nuclear Power Plant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Michael C. Hay, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-445; 50-446 License No.: NPF-87; NPF-89 Nonpublic Enclosure:

NRC Inspection Report 05000445/2012404, 05000446/2012404 w/Attachment: Supplemental Information cc w/enclosure:

Mr. Timothy Hope Nuclear Licensing Manager Comanche Peak Nuclear Power Plant, Units 1 & 2 Luminant Generation Company LLC FM 56, 5 Miles North of Glen Rose Glen Rose, TX 76043