ML14150A169
From kanterella
Revision as of 07:08, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML14150A169 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 06/10/2014 |
From: | Rankin J K Plant Licensing Branch IV |
To: | Edington R K Arizona Public Service Co |
Rankin J K | |
References | |
32-9215084-001, 32-9215089-001, 32-9215090-001, 32-9216967-001, 32-9217241-002, 51-9213061-001, TAC MF4169 | |
Download: ML14150A169 (4) | |
Similar Documents at Palo Verde | |
---|---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024
[Table view]Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a IR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML24157A3392024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium ML24144A2772024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24129A1482024-05-0707 May 2024 and Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27 Category:Proprietary Information Review MONTHYEARML18333A0712018-12-0404 December 2018
[Table view]Request for Withholding Information from Public Disclosure, Affidavit Dated May 16, 2018, Executed by Mr. Philip A. Opsal, from Framatome, Inc. ML18333A2272018-12-0404 December 2018 Request for Withholding Information from Public Disclosure, Affidavit Dated October 18, 2018, Executed by Mr. Bruce Rash of APS ML17158B2012017-06-22022 June 2017 Palo Verde, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure, 6/1/17 affidavit Executed by J. Gresham, Westinghouse; Technical Analysis Next Generation Fuel Implementation Amendment Request (CAC MF8076-MF8081) ML17145A2732017-06-15015 June 2017 Request for Withholding Information from Public Disclosure ML17079A4462017-03-27027 March 2017 Request for Withholding Information from Public Disclosure ML16190A2272016-07-13013 July 2016 Request for Withholding Information from Public Disclosure, 6/30/16 Affidavit Executed by J. Gresham, Westinghouse; Technical Analysis Next Generation Fuel Implementation Amendment Request ML16014A0022016-01-14014 January 2016 Request for Withholding Information from Public Disclosure - 10/8/15 Affidavit Executed by J. Gresham, Westinghouse Electric Company LLC Re WCAP-18051-P Dated October 2015 ML15209A6662015-08-10010 August 2015 Request for Withholding Information from Public Disclosure - 7/10/15 Affidavit Executed by J. Gresham, Westinghouse, Re Five Proprietary Documents in Support of Relief Request 53 - Approval of an Alternative to Flaw Removal (TAC No ML15043A2232015-03-0909 March 2015 Request for Withholding Information from Public Disclosure, 1/15/2015 Affidavit Executed by P. Opsal, Areva, Inc. Response to Relief Request 52 Request for Additional Information ML14150A1692014-06-10010 June 2014 Request for Withholding Information from Public Disclosure, 4/18/14 Affidavit Executed by P. Opsal, Areva, Inc. and 4/29/14 Affidavit Executed by N. Hottle, Areva, Inc. Six Proprietary Documents ML14042A1822014-02-27027 February 2014 Request for Withholding Information from Public Disclosure - 1/10/14 Affidavit Executed by J. Gresham, Westinghouse WCAP-16011-P-A, Revision 0 ML14006A2242014-01-24024 January 2014 Request for Proprietary Withholding of Information - 9/25/13 Affidavit Executed by J. Gresham, Westinghouse WCAP-17787 ML0712401132007-05-0808 May 2007 Request for Withholding Information from Public Disclosure - Westinghouse LLC ML0624401622006-10-13013 October 2006 Request for Withholding Information from Public Disclosure (CAW-06-2137) ML0627900232006-10-12012 October 2006 Request for Withholding Information from Public Disclosure (CAW-05-1997) ML0525601382005-07-0505 July 2005 Redacted Version of Proprietary Submittal Dated February 15, 2005 Regarding Safety Significance Evaluation of ECCS Containment Sump Voided Piping ML0514702602005-05-26026 May 2005 Request for Withholding Information from Public Disclosure (Palo Verde Nuclear Generating Station, Docket Nos. 50-528, 50-529, 50-530) ML0414000502004-05-17017 May 2004 Withholding from Public Disclosure, WCAP-15817-P, Revision 1, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation... (CAW-04-1803) ML0329012052003-10-15015 October 2003 Palo Verde Ngs, Units 1, 2&3- Request for Withholding Information from Public Disclosure for Core Protection Calculator Upgrade Amend Request.(Tac. MB6726/MB6727/MB6728) ML0312602842003-05-0606 May 2003 Request for Withholding Information from Public Disclosure, Request for Relief from NRC Order EA-03-009 on Interim Requirements for Reactor Vessel Head Inspections ML0235002042002-12-16016 December 2002 Request for Withholding Info from Public Disclosure for Bulletin 2002-01 ML0228405102002-10-25025 October 2002 (Units 1, 2 &3), Withholding from Public Disclosure, Steam Generator Tube Inspection, TAC No. MB6378 2018-12-04 |
Retrieved from "https://kanterella.com/w/index.php?title=ML14150A169&oldid=406952"