Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML16188A3332016-07-0101 July 2016 Description and Assessment of Proposed License Amendment - Technical Analysis Project stage: Other ML16190A2272016-07-13013 July 2016 Request for Withholding Information from Public Disclosure, 6/30/16 Affidavit Executed by J. Gresham, Westinghouse; Technical Analysis Next Generation Fuel Implementation Amendment Request Project stage: Withholding Request Acceptance ML16216A4612016-08-0303 August 2016 NRR E-mail Capture - Palo Verde Units 1, 2, and 3 - Acceptance Review of Next Generation Fuel License Amendment and Exemption Requests (CAC Nos. MF8076, MF8077, and MF8078; MF8079, MF8080, and MF8081) Project stage: Acceptance Review ML16217A1652016-08-0404 August 2016 NRR E-mail Capture - Palo Verde Units 1, 2, and 3 - Acceptance Review of Next Generation Fuel License Amendment and Exemption Requests (CAC Nos. MF8076, MF8077, and MF8078; MF8079, MF8080, and MF8081) Project stage: Acceptance Review ML16291A4482016-10-19019 October 2016 Audit Plan - 11/2-3/2016 Regulatory Audit at Westinghouse Facility in Rockville to Support Amendment and Exemption Requests Related to Implementation of Next Generation Fuel (CAC MF8076-MF8081) Project stage: Other ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 Project stage: Other ML17003A0762017-01-10010 January 2017 Regulatory Audit Report for the November 2-3, 2016, Audit at the Westinghouse Facility in Rockville, MD, for the License Amendment and Exemption Requests Associated with Next Generation Fuel (CAC Nos. MF8076-MF8081) Project stage: Other ML17054C4642017-02-27027 February 2017 Second Regulatory Audit Plan for March 8, 2017, Audit at Excel Facility in Rockville, Maryland, in Support of Next Generation Fuel License Amendment Request and Exemption Project stage: Other ML17076A3702017-03-16016 March 2017 Submittal of Proprietary Westinghouse Information Presented at the Regulatory Audit Held on March 8, 2017, at Excel Facility in Rockville, Maryland, Regarding Next Generation Fuel License Amendment Request and Exemption Project stage: Request ML17079A4462017-03-27027 March 2017 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML17082A4462017-03-28028 March 2017 PVNGS Units 1, 2, and 3 Transition to CE 16x16 Ngf - Draft RAIs Rev 3 Project stage: Draft RAI ML17107A0052017-04-14014 April 2017 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Ngf LAR and Exemption RAIs (CAC Nos. MF8076 to MF8081) Project stage: RAI 2016-08-04
[Table View] |
|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] Category:Proprietary Information Review
MONTHYEARML18333A0712018-12-0404 December 2018 Request for Withholding Information from Public Disclosure, Affidavit Dated May 16, 2018, Executed by Mr. Philip A. Opsal, from Framatome, Inc. ML18333A2272018-12-0404 December 2018 Request for Withholding Information from Public Disclosure, Affidavit Dated October 18, 2018, Executed by Mr. Bruce Rash of APS ML17158B2012017-06-22022 June 2017 Palo Verde, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure, 6/1/17 affidavit Executed by J. Gresham, Westinghouse; Technical Analysis Next Generation Fuel Implementation Amendment Request (CAC MF8076-MF8081) ML17145A2732017-06-15015 June 2017 Request for Withholding Information from Public Disclosure ML17079A4462017-03-27027 March 2017 Request for Withholding Information from Public Disclosure ML16190A2272016-07-13013 July 2016 Request for Withholding Information from Public Disclosure, 6/30/16 Affidavit Executed by J. Gresham, Westinghouse; Technical Analysis Next Generation Fuel Implementation Amendment Request ML16014A0022016-01-14014 January 2016 Request for Withholding Information from Public Disclosure - 10/8/15 Affidavit Executed by J. Gresham, Westinghouse Electric Company LLC Re WCAP-18051-P Dated October 2015 ML15209A6662015-08-10010 August 2015 Request for Withholding Information from Public Disclosure - 7/10/15 Affidavit Executed by J. Gresham, Westinghouse, Re Five Proprietary Documents in Support of Relief Request 53 - Approval of an Alternative to Flaw Removal (TAC No ML15043A2232015-03-0909 March 2015 Request for Withholding Information from Public Disclosure, 1/15/2015 Affidavit Executed by P. Opsal, Areva, Inc. Response to Relief Request 52 Request for Additional Information ML14150A1692014-06-10010 June 2014 Request for Withholding Information from Public Disclosure, 4/18/14 Affidavit Executed by P. Opsal, Areva, Inc. and 4/29/14 Affidavit Executed by N. Hottle, Areva, Inc. Six Proprietary Documents ML14042A1822014-02-27027 February 2014 Request for Withholding Information from Public Disclosure - 1/10/14 Affidavit Executed by J. Gresham, Westinghouse WCAP-16011-P-A, Revision 0 ML14006A2242014-01-24024 January 2014 Request for Proprietary Withholding of Information - 9/25/13 Affidavit Executed by J. Gresham, Westinghouse WCAP-17787 ML0712401132007-05-0808 May 2007 Request for Withholding Information from Public Disclosure - Westinghouse LLC ML0624401622006-10-13013 October 2006 Request for Withholding Information from Public Disclosure (CAW-06-2137) ML0627900232006-10-12012 October 2006 Request for Withholding Information from Public Disclosure (CAW-05-1997) ML0525601382005-07-0505 July 2005 Redacted Version of Proprietary Submittal Dated February 15, 2005 Regarding Safety Significance Evaluation of ECCS Containment Sump Voided Piping ML0514702602005-05-26026 May 2005 Request for Withholding Information from Public Disclosure (Palo Verde Nuclear Generating Station, Docket Nos. 50-528, 50-529, 50-530) ML0414000502004-05-17017 May 2004 Withholding from Public Disclosure, WCAP-15817-P, Revision 1, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation... (CAW-04-1803) ML0329012052003-10-15015 October 2003 Palo Verde Ngs, Units 1, 2&3- Request for Withholding Information from Public Disclosure for Core Protection Calculator Upgrade Amend Request.(Tac. MB6726/MB6727/MB6728) ML0312602842003-05-0606 May 2003 Request for Withholding Information from Public Disclosure, Request for Relief from NRC Order EA-03-009 on Interim Requirements for Reactor Vessel Head Inspections ML0235002042002-12-16016 December 2002 Request for Withholding Info from Public Disclosure for Bulletin 2002-01 ML0228405102002-10-25025 October 2002 (Units 1, 2 &3), Withholding from Public Disclosure, Steam Generator Tube Inspection, TAC No. MB6378 2018-12-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 27, 2017 Mr. Robert S. Bement Executive Vice President Nuclear/
Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAC NOS. MF8076, MF8077, MF8078, MF8079, MF8080, AND MF8081)
Dear Mr. Bement:
By letter dated March 16, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17076A370), Westinghouse Electric Company LLC (Westinghouse) on behalf of Arizona Public Service Company (the licensee) submitted an affidavit dated March 16, 2017 (AW-17-4560), to the U.S. Nuclear Regulatory Commission (NRC), executed by Mr. James A Gresham, Manager, Regulatory Compliance, Westinghouse, requesting that the information contained in the following document (Proprietary Attachment to the letter dated March 16, 2017) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
- LTR-NRC-17-24, P-Attachment, "Proprietary Westinghouse Information Presented at the Regulatory Audit held on March 8. 2017, at Excel Facility in Rockville, Maryland, for the Next Generation Fuel License Amendment Request and Exemption for Palo Verde Nuclear Generating Station, Units 1, 2, and 3" (Proprietary).
Please note that the proprietary document in its entirety contains the slides for the following topics:
- Palo Verde Nuclear Generating Station Next Generation Fuel License Amendment Request Fuel Assembly Misload Analysis
- Validation of Thermal Conductivity Degradation Allowance Used in the Arizona Public Service Company Next Generation Fuel License Amendment Request
R. Bement The March 16, 2017, affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
(d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
R. Bement If you have any questions regarding this matter, I may be reached at 301-415-1564.
Sincerely,
~~*~
Siva P. Lingam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530 cc: Mr. James A. Gresham Manager, Regulatory Compliance Westinghouse Electric Company 1000 Westinghouse Drive Building 3, Suite 310 Cranberry Township, PA 16066 Additional Distribution via Listserv
ML17079A446 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DSS/SN PB/BC NAME Slingam PBlechman RLukes DATE 3/23/17 3/23/17 3/24/17 OFFICE NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME RPascarelli Sling am DATE 3/27/17 3/27/17