ND-21-0392, Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16)
From kanterella
ML21154A214 | |
Person / Time | |
---|---|
Site: | Vogtle ![]() |
Issue date: | 06/03/2021 |
From: | Southern Nuclear Operating Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML21154A210 | List: |
References | |
ND-21-0392 | |
Download: ML21154A214 (8) | |
Similar Documents at Vogtle | |
---|---|
Category:Code Relief or Alternative
MONTHYEARML23150A0802023-05-30030 May 2023
[Table view]Acceptance Review - Vogtle Units 1 and 2 - Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23095A2962023-04-14014 April 2023 Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds (Vegp 3&4-Isi1- Alt-17) ML22259A1822022-09-22022 September 2022 Request for Proposed Inservice Testing Alternative ALT-VR-01 ML22118A0762022-05-13013 May 2022 Cover Letter for Vogtle Electric Generating Plant, Units 3 and 4 Request for Alternative Requirements for Inservice Test Interval Code Edition (VEGP 3&4-IST-ALT-01R2) ML22021A0012022-01-24024 January 2022 Relief Request for Proposed Alternative Requirements for the Repair of Reactor Vessel Head Penetrations for the Fourth 10-Year Inservice Inspection Interval, VEGP-ISI-ALT-04-05, Version 1.0 ML21154A2122021-06-0303 June 2021 Enclosure 1 - Vogtle Electric Generating Plant (VEGP) Unit 3 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1): Alternative Requirements for ASME Section III Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16) ML21154A2132021-06-0303 June 2021 Enclosure 2 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14162(VEGP 3-ALT-16) ND-21-0392, Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16)2021-06-0303 June 2021 Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16) ML21040A1652021-02-0909 February 2021 (Vegp), Units 3 and 4, Revision to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2): Alternative Requirements for ASME Section XI Examination Coverage of Weldolet Branch Connection Welds ML20352A1552021-01-11011 January 2021 Proposed Relief Request for Alternative VEGP-ISI-ALT-04-04 to the Requirements of the ASME Code ML20307A1412020-11-12012 November 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal NL-20-1262, Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion2020-10-30030 October 2020 Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion ML20216A3992020-08-0606 August 2020 Relief Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20143A2332020-06-0303 June 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) ML20132A1532020-05-14014 May 2020 ASME Code Alternative - May 14, 2020 Presubmittal Technical Exchange for Preservice Inspection (PSI) Alternative ML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ND-20-0083, Revision to Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01R1)2020-02-0606 February 2020 Revision to Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01R1) ND-19-1294, Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01)2019-10-31031 October 2019 Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01) ML18320A0192018-11-30030 November 2018 Relief Request Regarding Examination Coverage for Certain ASME Code Class 2 Category Welds (VEGP-ISI-RR-05) ML18296A7172018-10-31031 October 2018 Relief Request Regarding Examination Coverage for Certain Pressurizer and Steam Generator Welds (VEGP-ISI-RR-03) ND-18-1158, Revision to Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4-PSI/ISI-ALT-10R1)2018-08-30030 August 2018 Revision to Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4-PSI/ISI-ALT-10R1) NL-18-0428, Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-12018-04-0909 April 2018 Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1 ML18054A0652018-03-0505 March 2018 Cover Letter - Vogtle Electric Generating Plant - Request for Alternative (ALT-9) ML17171A1022017-06-27027 June 2017 Inservice Inspection Alternative Regarding Category B-N-2 and B-N-3 Welds (VEGP ISI ALT 13) ML17061A2022017-03-17017 March 2017 Request for Alternative RR-PR-03 Regarding Nuclear Service Cooling Water Pump Instrument Accuracy ML17037D0502017-02-17017 February 2017 and 2; Request to Use Asme Code Case OMN-18 as an Alternative to Inservice Testing Requirements (CAC Nos. MF8188 and MF8189) NL-17-0101, Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule2017-01-26026 January 2017 Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule ML17006A1092017-01-26026 January 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads Inflange Inspection ML16326A0442016-12-0808 December 2016 Alternative for Pump and Valve Inservice Testing Program ML16264A3212016-10-14014 October 2016 Alternatives for Pumps and Valves Inservice Testing Program ML14030A5702014-03-20020 March 2014 Request for Alternatives VEGP-ISI-ALT-06 ML13123A1602013-05-0707 May 2013 (VEGP) - Safety Evaluation of Relief Request VEGP-ISI-ALT-09, Version 2.0, Regarding Leakage Tests for Reactor Coolant Pressure Boundary Components ML13032A1062013-02-0707 February 2013 Safety Evaluation of Relief Request VEGP-ISI-ALT-08, Version 1, Regarding Installation of a Mechanical Clamp on a Class 1 Valve - Fourth 10-Year Interval ML1009001292010-06-11011 June 2010 Relief Requests VEGP-ISI-ALT-04 (Units 1 and 2) and VEGP-ISI-RR-01 (Unit 2) Inservice Inspection Alternatives for Third and Subsequent Inservice Inspection Intervals (TAC Nos. ME2226, ME2227, and ME1134) ML1012000882010-04-30030 April 2010 Acceptance of Vogtle Relief Request (VEGP-ISI-ALT-03) Dated April 7, 2010 NL-09-1410, VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii)2009-09-0909 September 2009 VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii) ML0731004352007-11-15015 November 2007 Third 10-Year Interval, Inservice Program Relief Request RR-V-1 (Tac Nos. MD5409 and MD5410) ML0627703592006-09-29029 September 2006 Evaluation of Relief Request ISI-GEN-ALT-06-02 NL-06-1713, Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays2006-08-10010 August 2006 Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays ML0510301992005-04-25025 April 2005 RR, ISI Program Intervals for Alternative Alignment of Iwe/Iwl Inspection Program (Tac No. MC4870, MC4871, MC4872, MC4873, MC4874, MC4875) ML0332800372003-11-21021 November 2003 Safety Evaluation Re. Request to Use ASME Code Case N-661 ML0225904572002-09-16016 September 2002 Code Relief, Relief Request for the Second Ten-Year Interval Inservice Testing Program 2023-05-30 |