ML071490507

From kanterella
Revision as of 00:37, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Information Request for an NRC Biennial Permanent Modifications and 10 CFR 50.59 (MOD/50.59) Baseline Inspection
ML071490507
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/29/2007
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
Download: ML071490507 (7)


Text

May 29, 2007Mr. Christopher M. CranePresident and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION

Dear Mr. Crane:

On August 20, 2007, the NRC will begin a Modifications and 10 CFR 50.59 (MOD/50.59)baseline inspection at the Quad Cities Nuclear Power Station. This inspection will be performed in accordance with the NRC baseline Inspection Procedures IP 71111.02 and IP 71111.17.

The on-site portion of the inspection will take place on August 20 through August 24, 2007 and September 4 through September 7, 2007.Experience has shown that these baseline inspections are extremely resource intensive, bothfor the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.

The first group is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be available to the Regional Office no later than June 19, 2007. The inspection team will review this information and, by June 29, 2007, will request specific items that should be available for review by July 30, 2007. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents in Group II. (1) will be requested for review in theRegional Office the week prior to the inspection. The remaining documents should be available by the first day of the on-site inspection, August 20, 2007. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.The lead inspector for this inspection is Mr. Robert Daley. We understand that our regulatorycontact for this inspection is Mr. Mark Wagner (309) 227-2815 of your organization. If there areany questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9749 or via e-mail at RCD@nrc.gov.

C. Crane-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely,/RA/David E. Hills, ChiefEngineering Branch 1 Division of Reactor Safety Docket Nos. 50-254; 50-265; 72-053License Nos. DPR-29; DPR-30

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection)cc w/encl:Site Vice President - Quad Cities Nuclear Power StationPlant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security D. Tubbs, Manager of Nuclear MidAmerican Energy Company C. Crane-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely, David E. Hills, ChiefEngineering Branch 1 Division of Reactor Safety Docket Nos. 50-254; 50-265; 72-053License Nos. DPR-29; DPR-30

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection)cc w/encl:Site Vice President - Quad Cities Nuclear Power StationPlant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security D. Tubbs, Manager of Nuclear MidAmerican Energy CompanyDOCUMENT NAME: C:\FileNet\ML071490507.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyTo receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copyOFFICERIIIRIIINAMERDaley: lsDHillsDATE05/29/0705/29/07OFFICIAL RECORD COPY C. Crane-3-Letter to Mr. C. Crane from Mr. D.E. Hills dated May 29, 2007

.

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTIONDISTRIBUTION

TEB RAG1 JFW1 RidsNrrDirsIrib GEG KGO KKB CAA1 DRPIII DRSIII PLB1 TXN INITIAL DOCUMENT REQUESTEnclosure 1MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUESTInspection Report
05000254/2007008(DRS); 05000265/2007008(DRSInspection Dates
August 20 through September 7, 2007Inspection Procedures
IP 71111- 02, "Changes, Tests, or Experiments"IP 71111- 17, "Permanent Plant Modifications"Lead Inspector
R. Daley(630) 829-9749I.Information Requested for In-Office Preparation WeekThe following information is requested by June 19, 2007, or sooner, to facilitate the selection ofspecific items that will be reviewed during the on-site inspection week. The team will select specific items from the information requested below and submit a list to your staff by June 29, 2007. We will request that certain items be made available to the regional office during the week prior to the inspection (by July 30, 2007). We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the receipt of information for the last Permanent Modification inspection (September 6, 2005) to the present. If you have any questions regarding this information, please call the team leader as soon as possible.(1)List of "permanent plant modifications" to risk significant systems, structures orcomponents that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.)The list should contain the number of each document, the title, the revision (ordate), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures. (2)List of all 10 CFR 50.59 completed evaluations involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. This list should only include 50.59 evaluations for the following:a)UFSAR changes that have been updated in accordance with10 CFR 50.71(e)(4) since September 6, 2005;b)Modifications that are field work complete; and INITIAL DOCUMENT REQUESTEnclosure 2c)Changes to calculations (or initiation of new calculations) that have been issued.The list should contain the number and title of each document, a brief descriptionof the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.(3)List of all 10 CFR 50.59 changes that have been screened out as not requiring afull evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. The list should contain the number and title of each document, a brief descriptionof the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).(4)List of any modifications, procedure revisions, or UFSAR changes where it wasdetermined that 10 CFR 50.59 did not apply.(5)List of calculation changes that have been issued for use.

(6)List of corrective action documents (open and closed) that address plantpermanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents associated with modification and 50.59 change implementation.The list should contain the number, title and revision (or date) of each document,the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.(7)Copies of procedures addressing the following: modifications, design changes,set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates.(8)UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Providecopies of the complete submittal.(9)Name(s) and phone numbers for the regulatory and technical contacts. (10)Current management and engineering organizational chart.

INITIAL DOCUMENT REQUESTEnclosure 3II.Information Requested to be Available the Week Prior to Inspection (Request willbe made by June 29, 2007) or on First Day of Inspection (August 20, 2007)(1)Copies of all selected items from Section I. This includes copies of associateddocuments such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.(2)Copies of these documents do not need to be solely available to the team aslong as the inspectors have easy and unrestrained access to them.a)Updated Final Safety Analysis Report;b)Original FSAR Volumes; c)original SER and Supplements (for Original FSAR);

d)FSAR Question and Answers; e)Quality Assurance Plan; f)Technical Specifications; g)Latest IPE/PRA Report; h)Vendor Manuals; and i)The Latest 10 CFR 50.59 FSAR Update Submittal.(3)Please ensure that other supporting documents for the selected items have beenlocated and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:a)Drawings supporting the modifications;b)Procedures affected by the modifications; and c)UFSAR change papers generated due to a 10 CFR 50.59 evaluation.(4)Current management and engineering organizational chart.III.Information Requested to be provided th roughout the inspection(1)Copies of any corrective action documents generated as a result of the team'squestions or queries during this inspection.(2)Copies of the list of questions submitted by the team members and thestatus/resolution of the information requested (provide daily during the inspection to each team member).If you have questions regarding the information requested, please contact the team leader.