Revised Pages of Facility Operating License Nos. DPR-32 and DPR-37
ML072140008
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/02/2007
From: Collins S
Office of Nuclear Reactor Regulation
To:
Virginia Electric & Power Co (VEPCO)
Lingam, Siva NRR/DORL 415-1564
Shared Package
ML072120438 List:
References
Download: ML072140008 (4)


Text

ENCLOSURE 1REVISED PAGES OF FACILITY OPERATING LICENSE NOS. DPR-32 AND DPR-37DOCKET NOS. 50-280 AND 50-281SURRY POWER STATION, UNIT NOS. 1 AND 2Replace the following pages of Facility Operating License Nos. DPR-32 and DPR-37. Therevised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.License DPR-32REMOVE INSERTPage 5Page 5License DPR-37REMOVE INSERTPage 5Page 5--Page 6 (2)The Updated Final Safety Analysis Report supplement as revised onJuly 25, October 1, November 4, and December 2, 2002, shall be included in the next scheduled update to the licensee's Updated Final Safety Analysis Report required by 10 CFR 50.71(e)(4), following the issuance of this renewed license. Until that update is complete, the licensee may make changes to the programs described in such supplement without prior Commission approval, provided that the licensee evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59, and otherwise complies with the requirements in that

section.Q.Mitigation Strategy llDevelop and maintain strategies for addressing large fires and explosions and lthat include the following key areas:

l l(1)Fire fighting response strategy with the following elements:

la. Pre-defined coordinated fire response strategy and guidance lb. Assessment of mutual aid fire fighting assets lc. Designated staging areas for equipment and materials ld. Command and control le. Training of response personnel l

l(2)Operations to mitigate fuel damage considering the following:

la. Protection and use of personnel assets lb. Communications lc. Minimizing fire spread ld. Procedures for implementing integrated fire response strategy le. Identification of readily-available pre-staged equipment lf. Training on integrated fire response strategy lg. Spent fuel pool mitigation measures l

l(3)Actions to minimize release to include consideration of:

la. Water spray scrubbing lb. Dose to onsite responders l4.This renewed license is effective as of the date of issuance and shall expire at midnighton May 25, 2032.FOR THE NUCLEAR REGULATORY COMMISSIONoriginal signed by:Samuel J. Collins, Director Office of Nuclear Reactor Regulation

Attachment:

Appendix A, Technical Specifications Date of Issuance: March 20, 2003 Renewed License No. DPR-32Revised by letter dated August 2, 2007 P.Updated Final Safety Analysis Report(1)The Updated Final Safety Analysis Report supplement submittedpursuant to 10 CFR 54.21(d), as revised on July 25, 2002, October 1, 2002, November 4, 2002, and December 2, 2002 describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than January 29, 2013, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection. (2)The Updated Final Safety Analysis Report supplement as revised onJuly 25, 2002, October 1, 2002, November 4, 2002, and December 2, 2002, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71(e)(4), following the issuance of this renewed license. Until that update is complete, the licensee may make changes to the programs described in such supplement without prior Commission approval, provided that the licensee evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section. Q.Mitigation Strategy llDevelop and maintain strategies for addressing large fires and explosions and lthat include the following key areas:

l l(1)Fire fighting response strategy with the following elements:

la. Pre-defined coordinated fire response strategy and guidance lb. Assessment of mutual aid fire fighting assets lc. Designated staging areas for equipment and materials ld. Command and control le. Training of response personnel l

l(2)Operations to mitigate fuel damage considering the following:

la. Protection and use of personnel assets lb. Communications lc. Minimizing fire spread ld. Procedures for implementing integrated fire response strategy le. Identification of readily-available pre-staged equipment lf. Training on integrated fire response strategy lg. Spent fuel pool mitigation measures l

l(3)Actions to minimize release to include consideration of:

la. Water spray scrubbing lb. Dose to onsite responders l Renewed License No. DPR-37Revised by letter dated August 2, 2007 l4.This renewed license is effective as of the date of issuance and shall expire at midnighton January 29, 2033.FOR THE NUCLEAR REGULATORY COMMISSIONoriginal signed by:Samuel J. Collins, DirectorOffice of Nuclear Reactor Regulation

Attachment:

Appendix A, Technical Specifications Date of Issuance: March 20, 2003Renewed License No. DPR-37Revised by letter dated August 2, 2007