MONTHYEARML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23100A0652023-04-25025 April 2023 Issuance of Amendment Nos. 310 and 310, Regarding Turbine Building Tornado Classification ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23030B8472023-03-10010 March 2023 Issuance of Amendment Nos. 309 and 309, License Amendment Request Regarding a 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability ML22336A1822022-12-27027 December 2022 Virginia Electric and Power Company Correction of Documentation Error Amendment No. 295 Adopt TSTF-490, Revision 0, and Update Alternative Source Term Analyses ML22250A4672022-09-15015 September 2022 Turbine Building Wind Loading Basis Change Audit Plan ML22193A2952022-08-26026 August 2022 Issuance of Amendment Nos. 308 and 308 License Amendment Request for Removal of the Refueling Water Chemical Addition Tank and Containment Sump, Ph Buffer Change and Safety Evaluation ML22202A0472022-07-25025 July 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Surry Technical Specification Change Auxiliary Feedwater Allowed Outage Time ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML21253A0632021-11-19019 November 2021 Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis ML21188A1742021-10-26026 October 2021 Issuance of Amendment Nos. 305 and 305 Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21175A1852021-08-20020 August 2021 Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines ML20091L9822021-05-0404 May 2021 SLR License ML20148M3592020-12-0808 December 2020 Issuance of Amendment Nos. 302 and 302 to Revise Technical Specifications Figure 3.1 1, Surry Units 1 and 2 Reactor Coolant System Heatup Limitations, and Figure 3.1-2, Surry Units 1 and 2 Reactor Coolant System ML20293A1602020-12-0808 December 2020 Issuance of Amendment Nos. 301 and 301 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML20301A4522020-10-28028 October 2020 Non-Proprietary, Issuance of Amendment Nos. 300 and 300 to Revise Technical Specifications 6.2.C, Core Operating Limits Report ML20309A5912020-10-14014 October 2020 Pre-Submittal Meeting for License Amendment Requests to Implement Batch Framatome 15 X 15 AGORA-5A-I (Agora) Fuel at Surry Power Station Units 1 and 2 (SPS) - Slides ML20085G9642020-05-19019 May 2020 Issuance of Amendments Nos. 298 and 298 to Revise Technical Specifications Table 3.7-1, Reactor Trip Instrument Operating Conditions, for an Addition of 24-Hour Completion Time for an Inoperable Rector Trip Breaker ML20115E2372020-05-0707 May 2020 Issuance of Exigent Amendments Nos. 299 and 299, to Revise TS 6.4.Q, Steam Generator (SG) Program, to Allow a One-Time Deferral of the Inspection of Surry Unit 2 Sg B Spring 2020 Refueling Outage ML20099F8732020-04-17017 April 2020 Audit Proposed License Amendment Request for the Addition of Westinghouse Topical Report WCAP-16996-P-A, Revision 1 (EPID L-2019-LLA-0243 and EPID L-2019-LLA-0236 ML20058F9662020-03-16016 March 2020 Issuance of Amendment Nos. 297 and 297 to Revise Technical Specifications 3.16, Emergency Power System, to Allow a One Time 14-Day Allowed Outage Time for Replacement of 5-KV Cables Associated with Reserve Station ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19028A3842019-06-12012 June 2019 Issuance of Amendment Nos. 295 and 295 to Adopt TSTF-490, Revision 0, and Update Alternative Source Term Analyses (EPID-L-2018-LLA-0068) ML19031B2272019-02-27027 February 2019 Issuance of Amendment Nos. 281, 264, 294, and 294 to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes ML18261A0992018-10-0505 October 2018 Issuance of Amendments. Request to Revise Technical Specifications Section 3.16 Emergency Power System Regarding a Temporary 21 Day Allowed Outage Time ML18106A0072018-05-0303 May 2018 Issuance of Amendments Regarding Open Phase Protection Per NRC Bulletin 2012 01 (CAC Nos. MF9805, MF9806; EPID L-2017-LLA-0238) ML17326A2252018-02-0909 February 2018 Issuance of Amendments Regarding License Amendment Request to Revise Residual Heat Removal and Component Cooling System Technical Specifications Requirements (CAC Nos. MF9124 and MF9125; EPID L-2017-LLA-0166) ML17170A1832017-07-28028 July 2017 Issuance of Amendments Regarding the Extension of the Emergency Service Water Pump Allowed Outage Time, Surry Power Station, Units 1 and 2 ML17100A2532017-05-31031 May 2017 Issuance of Amendments Regarding Extension of Technical Specification 3.14, Service Water Flow Path Allowed Outage Times and Deletion of Expired Temporary Service Water Jumper Requirements (CAC Nos. MF7746... ML17039A5132017-05-10010 May 2017 Issuance of Amendment Nos. 288 and 288 Regarding Technical Specification Changes to Expand Primary Grade Water Lockout Requirements in TS 3.2.E (CAC Nos. MF7716 and MF7717). 08/10/2017 ML16202A0682016-07-14014 July 2016 Proposed Licensed Amendment Request Emergency Service Water Pump Allowed Outage Time Extension ML16042A1732016-02-29029 February 2016 Issuance of Amendments for Generic Letter 2008-01 (Gas Accumulation) ML15314A0782015-11-0505 November 2015 Virginia Electric and Power Company, Surry Power Station, Units 1 and 2 - Intent to Pursue Second License Renewal ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15173A1022015-06-26026 June 2015 Issuance of Amendments Regarding Clarification of Reactor Coolant System Heatup and Cooldown Limitation Technical Specification Figures ML15099A6792015-04-28028 April 2015 Issuance of Amendments Regarding Relocation of Augmented Inspection Requirements ML14169A3592014-08-12012 August 2014 Stations, Units 1 and 2, Issuance of Amendments Regarding Addition of an Analytical Methodology to the Core Operating Limits Reports and an Increase to the Surry Minimum Temperature for Criticality ML14148A2352014-07-0303 July 2014 Issuance of Amendment to Extend the Containment Type a and Type C Leak Rate Test Frequency ML14073A4052014-04-24024 April 2014 Issuance of Amendment for the Technical Specifications Changes Related to Snubber Surveillance Requirements ML13186A1972013-09-25025 September 2013 Independent Spent Fuel Storage Installations - Issuance of Amendments for Changes to the Emergency Action Level Revisions ML13018A0862013-01-28028 January 2013 Issuance of License Amendment Request to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML12109A2702012-04-17017 April 2012 Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair ML1207303042012-04-17017 April 2012 Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair ML11192A2492011-08-31031 August 2011 Issuance of Amendment Regarding Cyber Security to Dominion Plants ML11194A2902011-07-28028 July 2011 License Amendment, Issuance of Amendments Regarding Administrative Changes to Technical Specifications 3.12 and 6.2 ML11110A1112011-05-31031 May 2011 Issuance of Amendments Regarding Reactor Vessel Heatup and Cooldown Curves for 48 Effective Full-Power Years 2024-01-18
[Table view] |
Text
ENCLOSURE 1 REVISED PAGES OF FACILITY OPERATING LICENSE NOS. DPR-32 AND DPR-37 DOCKET NOS. 50-280 AND 50-281 SURRY POWER STATION, UNIT NOS. 1 AND 2 Replace the following pages of Facility Operating License Nos. DPR-32 and DPR-37. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.
License DPR-32 REMOVE INSERT Page 5 Page 5 License DPR-37 REMOVE INSERT Page 5 Page 5
-- Page 6
(2) The Updated Final Safety Analysis Report supplement as revised on July 25, October 1, November 4, and December 2, 2002, shall be included in the next scheduled update to the licensees Updated Final Safety Analysis Report required by 10 CFR 50.71(e)(4), following the issuance of this renewed license. Until that update is complete, the licensee may make changes to the programs described in such supplement without prior Commission approval, provided that the licensee evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59, and otherwise complies with the requirements in that section.
Q. Mitigation Strategy l l
Develop and maintain strategies for addressing large fires and explosions and l that include the following key areas: l l
(1) Fire fighting response strategy with the following elements: l
- a. Pre-defined coordinated fire response strategy and guidance l
- b. Assessment of mutual aid fire fighting assets l
- c. Designated staging areas for equipment and materials l
- d. Command and control l
- e. Training of response personnel l l
(2) Operations to mitigate fuel damage considering the following: l
- a. Protection and use of personnel assets l
- b. Communications l
- c. Minimizing fire spread l
- d. Procedures for implementing integrated fire response strategy l
- e. Identification of readily-available pre-staged equipment l
- f. Training on integrated fire response strategy l
- g. Spent fuel pool mitigation measures l l
(3) Actions to minimize release to include consideration of: l
- a. Water spray scrubbing l
- b. Dose to onsite responders l
- 4. This renewed license is effective as of the date of issuance and shall expire at midnight on May 25, 2032.
FOR THE NUCLEAR REGULATORY COMMISSION original signed by:
Samuel J. Collins, Director Office of Nuclear Reactor Regulation
Attachment:
Appendix A, Technical Specifications Date of Issuance: March 20, 2003 Renewed License No. DPR-32 Revised by letter dated August 2, 2007
P. Updated Final Safety Analysis Report (1) The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on July 25, 2002, October 1, 2002, November 4, 2002, and December 2, 2002 describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than January 29, 2013, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
(2) The Updated Final Safety Analysis Report supplement as revised on July 25, 2002, October 1, 2002, November 4, 2002, and December 2, 2002, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71(e)(4), following the issuance of this renewed license. Until that update is complete, the licensee may make changes to the programs described in such supplement without prior Commission approval, provided that the licensee evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
Q. Mitigation Strategy l l
Develop and maintain strategies for addressing large fires and explosions and l that include the following key areas: l l
(1) Fire fighting response strategy with the following elements: l
- a. Pre-defined coordinated fire response strategy and guidance l
- b. Assessment of mutual aid fire fighting assets l
- c. Designated staging areas for equipment and materials l
- d. Command and control l
- e. Training of response personnel l l
(2) Operations to mitigate fuel damage considering the following: l
- a. Protection and use of personnel assets l
- b. Communications l
- c. Minimizing fire spread l
- d. Procedures for implementing integrated fire response strategy l
- e. Identification of readily-available pre-staged equipment l
- f. Training on integrated fire response strategy l
- g. Spent fuel pool mitigation measures l l
(3) Actions to minimize release to include consideration of: l
- a. Water spray scrubbing l
- b. Dose to onsite responders l Renewed License No. DPR-37 Revised by letter dated August 2, 2007
l
- 4. This renewed license is effective as of the date of issuance and shall expire at midnight on January 29, 2033.
FOR THE NUCLEAR REGULATORY COMMISSION original signed by:
Samuel J. Collins, Director Office of Nuclear Reactor Regulation
Attachment:
Appendix A, Technical Specifications Date of Issuance: March 20, 2003 Renewed License No. DPR-37 Revised by letter dated August 2, 2007