MONTHYEARL-24-243, License Renewal Application for the Perry Nuclear Power Plant Revision O - Supplement 62024-11-0707 November 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Supplement 6 L-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 05000440/LER-2024-003, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 05000440/LER-2024-002, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models 05000440/LER-2024-001, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report 2024-09-09
[Table view] |
Text
FENOC Perry Nuclear Power Station-- ft 10 Center Road FirstEnergy Nuclear Operating Company Perry, Ohio 44081 Barry S. Allen 440-280-5382 Vice President Fax: 440-280-8029.September 24, 2007 PY-CEI/OEPA-0476L Ohio Environmental Protection Agency Northeast District Office Attention:
Mr. Michael Stevens 2110 E. Aurora Rd.Twinsburg, OH 44087-1969 Ladies and Gentlemen, On September 19, 2007, the Perry Nuclear Power Plant (PNPP) discovered an occurrence that was reportable in accordance with the Ohio Environmental Protection Agency (OEPA) Permit No. 31B0001 6*ID. The report was submitted due to a discharge to the "Major Stream" diversion (also referred to as "Red Mill Run"). The initial report was submitted to the Ohio Environmental Protection Agency by phone on September 20, 2007, at 1437 hours0.0166 days <br />0.399 hours <br />0.00238 weeks <br />5.467785e-4 months <br />.In accordance with Permit No. 31B00016*ID, Part Ill, Section 12.B, the following information was reported on September 20, 2007: 1. The times at wh~ich the discharge occurred, and was discovered:
Time of discharge is unknown.Cloudy water was discovered in "Major Stream" diversion at approximately 1525 hours0.0177 days <br />0.424 hours <br />0.00252 weeks <br />5.802625e-4 months <br /> on September 19, 2007.2. The approximate amount and the characteristics of the discharge:
The amount of discharge is unknown. At the time of discovery, approximately 10 to 15 gallons of water, per minute, were observed discharging from the storm drain. On September 20, 2007, the observed discharge from the storm drain was approximately 1 to 2 gallons of water per minute.The pH of the stream was 11.2 standard units (SU) at 1650 hours0.0191 days <br />0.458 hours <br />0.00273 weeks <br />6.27825e-4 months <br /> on September 19, 2007 with white powdery deposition on the stream bed. At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on September 20, 2007, a sample taken for pH indicated 8.48 SU.A number of small stressed fish were observed at time of discovery, along with approximately 5 to 10 small dead fish. No frogs, crayfish, or other local aquatic life forms were observed to have been negatively impacted.3. The stream affected by the discharge: "Major Stream" diversion (also referred to as "Red Mill Run").4. The circumstances which created the discharge:
The source of the high pH and white sediment is unknown at this time and an investigation is in progress.5. The names and telephone numbers of the persons who have knowledge of these circumstances:
Liz Ryan or Paul Kowalski (440) 280-5536/5063.
- 6. What remedial steps are being taken: Clean Harbors Incorporated (CHI) was contacted for clean-up assistance.
CHI representatives inspected the affected area and provided recommendations for clean-up remediation.
The recommendations are currently being evaluated.
- 7. The names and telephone numbers of the persons responsible for such remedial steps: Paul Kowalski (440) 280-5063.
PY-CEI/OEPA-0476L Page 2 of 2 In accordance with Permit No. 31B00016*ID, Part III, Section 12.C, the following information is provided: 1. The limitation(s) which has been exceeded:
The discharge limitation for pH at the Major Stream diversion.
The maximum for pH is 9.0 and minimum is 6.5 SU.2. The extent of the exceedance:
Approximately 25,200 gallons of accumulated ground and rain water from the Unit 2 Turbine Power Complex basement, with a pH level above the permit limit, were pumped to the Major Stream diversion.
- 3. The cause of the exceedance:
Pumping accumulated ground and rain water inleakage, that was subsequently found to contain high pH, from the Unit 2 Turbine Power Complex basement to the storm drain. Although the final cause analysis has not been fully completed, it appears that the high pH in the water came from calcium constituents that were leached from the building concrete of the abandoned Unit 2 Turbine Power Complex basement.
The. calcium constituents were dissolved and entrained into the water accumulated in these abandoned construction facilities.
- 4. The period of the exceedances including exact dates and times: The discharge started at approximately 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on September 19, 2007, and lasted approximately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (i.e., to approximately 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on September 19, 2007).5. If uncorrected, the anticipated time the exceedance is expected to continue:
The most likely cause of this exceedance stopped at approximately 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on September 19, 2007. At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on September 20, 2007, a sample from the Major Stream for pH indicated 8.48 SU.6. Steps taken to reduce, eliminate, and/or prevent recurrence of the exceedance:
This issue has been documented in and is being addressed by the FirstEnergy Nuclear Operating Company (FENOC)Corrective Action Program (Condition Report 07-26811).
An investigation and subsequent remedial steps will be taken to correct deficiencies for this event. Pumping of the Unit 2 Turbine Power Complex basement to the storm drain without Chemistry/Environmental sampling has been stopped. Site specific procedures and training direct personnel to first obtain permission from Chemistry/Environmental prior to discharging to a storm drain.If you have any questions or require additional information, please contact Ms. Liz Ryan or Mr. Paul Kowalski at (440)-280-5536/5063.
Sincerely, Enclosures cc: NRC Region Ill NRC Resident Inspector NRC Project Manager NRC Document Control Desk (Docket No. 50-440)Lake County Emergency Planning Committee Perry Township Fire Department FENOC Perry Nuclear Power Plant 10 Center Road qPerry Ohio 44081 FirstEnergy Nuclear Operating Company Regulatory Compliance Section Mail Stop -A210 Ir U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 H MIETER -ý -PY 925.2