ML102710331

From kanterella
Revision as of 00:54, 21 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Document CR-N1002-504, Revision 1, Final Report for the 30th Year Containment Iwl Inspection, Fm 6.5 Exhibit 6
ML102710331
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/01/2009
From:
Progress Energy Co
To:
Office of Information Services
References
FOIA/PA-2010-0116 CR-N1002-504, Rev 1
Download: ML102710331 (3)


Text

FM 6.5 Exhibit 6 Page 1 of 3-DOCUMENT NUMBER: CR-Ni002-504 REVISION:

1 PAGE: 49 DOCUMENT TITLE: FINAL REPORTýFOR THE'30T YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 30TH YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 02/04/2009 Progress Energy B22.5 3.09 3.0H2.655 574 04 122.57 01 E BT4 p2.5,34 ,Z, , 4 .""4s ., T 2E5 2.65 51534 i 6.19 1.19 120.88 0.98 YES BT1 25 3,54 BT2 2 1.5 3.0 42H 5.5 39.71 3.21 116.41 2.5 YES BT 5 23 39,71, BT 4 625 73.34 D238 695 73.34 3.84 102259 3174 YES BT 6 7 0-T --ý ---6--5:= pthe Freedolli 0t InWTSnOdM A )g FM 65 Exhibit 6 Page 2 of 3 DOCUMENT NUMBER: DOCUMENT TITLE: PROJECT TITLE: CR-N1002-504 REVISION:

1 PAGE: 50 FINAL REPORT FOR THE 30M YEAR CONTAINMENT IWL INSPECTION 3 0 TM YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATE: 02/04(2009 Pwess Energ 13H33 BT 1 BT 3 2 2 4 2.65 2.65 5.3 1 1,3 121.57 1 1.06 YES BT 1 2 2.65 13H35 53 13 121.77 1.06 YES BT3 2 2.65 BT1 2 2.65 13H38 4 5.3 1.3 121.53 1.06 YES BT 3 2 2.65 BT 4 2 2.65 46H20 5.3 1.3 121.37 1.07 YES BT 6 2 2.65 BT 4 2 2,65 461H23 4 5.3 13 122.63 1.06 YES BT 6 2 2,65 46H20~ 4 2.5 1.3 121,37 1437 YES~BT 6 >' 2 2.65 FM 6.5 Exhibit 6 Page 3 of 3 DOCUMENT NUMBER; CR-N1002-504 REVISION:

1 PAGE: 51 DOCUMENT TITLE: FINAL REPORT FOR THE 30T YEAR CONTAINMENT IWL INSPECTION PROJECT TITLE: 3 0"' YEAR TENDON SURVEILLANCE AT CRYSTAL RIVER DATEý 02/04/2009 'BT62 2 2.65 B T2 2 2.65:;I BT2 2 62H34 45 5.3( 0803 12207 YES BT2 2 ! 2.65--- --LIE -A-C-P-If a large amount of grease is lost during the inspection, then grease must be replaced by pressure pumping it back into the tendon duct.