|
---|
Category:Letter
MONTHYEARML24022A0972024-01-22022 January 2024 Massachusetts Institute of Technology Change of Facility Backup Project Manager ML23354A1442024-01-0505 January 2024 Examination Confirmation Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology IR 05000020/20232032023-11-21021 November 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023203 ML23242A3382023-11-0606 November 2023 Examination Report Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23242A3392023-11-0606 November 2023 Examination Result Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology IR 05000020/20232012023-10-12012 October 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023201 IR 05000020/20232022023-09-27027 September 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000020/2023202 ML23194A0412023-07-11011 July 2023 Mit Research Reactor - Duties of Reactor Superintendent ML23103A2632023-05-10010 May 2023 Examination Confirmation Letter No. 50-020/OL-23-01 Massachusetts Institute of Technology ML23094A1102023-03-30030 March 2023 Massachusetts Institute of Technology (Mit), Submittal of Annual Report for 2022, Technical Specification 7.7.1 ML23072A0242023-03-0707 March 2023 Mit, Nuclear Reactor Lab., Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor IR 05000020/20222012023-02-0707 February 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2022201 ML22189A0492022-07-25025 July 2022 Examination Confirmation Letter No.50-020/OL-22-02, Massachusetts Institute of Technology ML22095A2412022-03-31031 March 2022 Annual Report for the Mit Research Reactor for the Period from January 1, 2021, to December 31, 2021 ML22062B0422022-02-10010 February 2022 Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21328A2342021-11-29029 November 2021 Examination Confirmation Letter No. 50-020/OL-22-01, Massachusetts Institute of Technology IR 05000020/20212032021-11-0909 November 2021 Massachusetts Institutes of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2021203 IR 05000020/20212012021-09-30030 September 2021 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000020/2021201 ML21186A0032021-07-16016 July 2021 Examination Confirmation Letter No. 50-020/OL-21-02, Massachusetts Institute of Technology ML21165A1542021-05-28028 May 2021 Mit - Emergency Plan and Procedures, 10 CFR 50.54(q)(5) ML21140A3622021-05-17017 May 2021 Massachusetts Institute of Technology (Mit) - Supplement to Response to the Request for Additional Information for Battery Upgrade License Amendment Request (EPID: L-2021 -NFA-0000) ML21132A2512021-05-0606 May 2021 Massachusetts Institute of Technology, License No. R-37, Docket No. 50-20, Reportable Occurrence 50-20/2021-: Operation with Less than the Required Staffing on Site; NRC OPS Center Log EN 55212 ML21112A1672021-04-12012 April 2021 Massachusetts Institute of Technology - Physical Security Plan Revision Regarding Biometric Readers ML21105A3602021-04-0707 April 2021 Duties of Reactor Superintendent ML21099A1132021-03-31031 March 2021 Massachusetts Institute of Technology - Annual Report, Docket No. 50-20, License R-37, Technical Specification 7.7.1 ML21091A2082021-03-24024 March 2021 Mit Nuclear Reactor Lab - Response to Request for Additional Information for Battery Upgrade License Amendment Request ML21076A0232021-03-18018 March 2021 Requests for Additional Information - Related to License Amendment Request to Replace Emergency Power System Batteries ML21070A1852021-03-0202 March 2021 Mit Nuclear Reactor Laboratory, License Amendment Request Regarding Emergency Battery Surveillances in Technical Specification 4.6, Docket No. 50-20, License R-37 ML21063A2552021-02-25025 February 2021 Proposal for Conversion to Low Enriched Uranium (Leu), :Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21053A4372021-02-23023 February 2021 Examination Confirmation Letter No. 50-020/OL-21-01, Massachusetts Institute of Technology ML21036A0852021-02-19019 February 2021 Massachusetts Institute of Technology - Acceptance of License Amendment Request to Revise Surveillance Frequency During Extended Reactor Shutdown ML21035A2582021-01-29029 January 2021 Massachusetts Institute of Technology (Mit), Supplement to Technical Specifications Surveillance Frequency Definition Update for Improved Compliance Under 10 CPR 50.36(c)(3) ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20307A4202020-11-0505 November 2020 Granting of Extension Request to Supplement License Amendment to Revise Surveillance Requirement Frequency ML20304A1172020-10-19019 October 2020 Time Extension Request for LAR on Technical Specifications Surveillance Frequency Update for Improved Compliance Under 10 CFR 50.36(c)(3) for the Mit Research Reactor ML20248H5682020-09-22022 September 2020 Mit Research Reactor Routine Inspection Report with Enforcement Discretion (EA-20-109) - August 2020 ML20161A3342020-07-24024 July 2020 Massachusetts Institute of Technology - Issuance of Amendment NO.44 to Renewed Facility Operation License No. R-37 to Amend Technical Specifications Related to Level 1 Position Title Change ML20182A7092020-07-0909 July 2020 Acceptance Review Amendment Request to Revise Surveillance Frequency - Opportunity to Supplement ML20192A0762020-06-30030 June 2020 Mit - Supplemental Information for License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20070H2672020-06-0404 June 2020 Examination Report No. 50-020/OL-20-01, Massachusetts Institute of Technology ML20119A8272020-05-29029 May 2020 Massachusetts Institute of Technology - Issuance of Amendment No. 43 Extending Time to Implement License Amendment No. 42 to Facility Operating License No. R-37 ML20149K4142020-05-27027 May 2020 NRC LAR Extension Supplemental Letter 2020-05-27 ML20135H1882020-05-15015 May 2020 Massachusetts Institute of Technology - Exemption from Select Requirements of 10 CFR Part 55, Operators' Licenses ML20122A0622020-04-21021 April 2020 Massachusetts Institute of Technology, Regarding the, Amendment No. 42 to Renewed Facility Operating License No. R-37 for the Nuclear Safety System Digital Upgrade (Epdi No. L-2016-LLA-0003) ML20090E2272020-04-16016 April 2020 Massachusetts Institute of Technology - Acceptance of the Application for a License Amendment Level 1 Position Title Change ML20097B6932020-03-31031 March 2020 Amendment No. 42 to Renewed Facility Operating License No. R-37 Regarding the Nuclear Safety System Digital Upgrade (Epdi No. L-2016-LLA-0003) ML20097D2992020-03-27027 March 2020 Massachusetts Institute of Technology (Mit) - Annual Report for the Year 2019 ML20078J4852020-03-12012 March 2020 Massachusetts Institute of Technology (Mit), License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20055D3322020-02-18018 February 2020 Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph IR 05000020/20192032020-01-15015 January 2020 Massachusetts Institute of Technology U.S. Nuclear Regulatory Commission Security-Related Inspection Report 05000020/2019203 2024-01-05
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML21070A1852021-03-0202 March 2021 Mit Nuclear Reactor Laboratory, License Amendment Request Regarding Emergency Battery Surveillances in Technical Specification 4.6, Docket No. 50-20, License R-37 ML21035A2582021-01-29029 January 2021 Massachusetts Institute of Technology (Mit), Supplement to Technical Specifications Surveillance Frequency Definition Update for Improved Compliance Under 10 CPR 50.36(c)(3) ML20192A0762020-06-30030 June 2020 Mit - Supplemental Information for License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20078J4852020-03-12012 March 2020 Massachusetts Institute of Technology (Mit), License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML18030A6562018-01-24024 January 2018 Massachusetts Institute of Technology (Mit) - License Amendment Request for Experiment Approval Process Technical Specification ML16139A7862016-05-12012 May 2016 License Amendment Request for Upgrade of the Nuclear Safety System in the Mit Reactor Protection System, Docket No. 50-20, License R-37 ML15159A4032015-05-28028 May 2015 Massachusetts Institute of Technology - License Amendment Request for Dro Qualification Tech Spec ML13262A1292013-09-10010 September 2013 License Amendment Regarding Mit Police Inspection Routine ML0813506112008-05-0707 May 2008 Massachusetts Institute of Technology - Request for License Amendment to Technical Specification No. 5.3, Primary Coolant System. ML0434304662004-12-0101 December 2004 Massachusetts Institute of Technology, Revision to Technical Specification 5.3, Primary Coolant System. 2021-03-02
[Table view] Category:Technical Specification
MONTHYEARML20161A3342020-07-24024 July 2020 Massachusetts Institute of Technology - Issuance of Amendment NO.44 to Renewed Facility Operation License No. R-37 to Amend Technical Specifications Related to Level 1 Position Title Change ML0813506112008-05-0707 May 2008 Massachusetts Institute of Technology - Request for License Amendment to Technical Specification No. 5.3, Primary Coolant System. ML14204A6161975-07-23023 July 1975 TSAF50-00020 - Massachusetts Institute of Technology (Mit), Current Facility Operating License R-037. Tech Specs, Revised 08/13/2015 2020-07-24
[Table view] Category:Amendment
MONTHYEARML20161A3342020-07-24024 July 2020 Massachusetts Institute of Technology - Issuance of Amendment NO.44 to Renewed Facility Operation License No. R-37 to Amend Technical Specifications Related to Level 1 Position Title Change ML0813506112008-05-0707 May 2008 Massachusetts Institute of Technology - Request for License Amendment to Technical Specification No. 5.3, Primary Coolant System. ML14204A6161975-07-23023 July 1975 TSAF50-00020 - Massachusetts Institute of Technology (Mit), Current Facility Operating License R-037. Tech Specs, Revised 08/13/2015 2020-07-24
[Table view] |
Text
MIT NUCLEAR REACTOR LABORATORY AN MIT INTERDEPARTMENTAL CENTER John A. Bernard Mail Stop: NW12-208a Phone: 617 2534202 Director of Reactor Operations 138 Albany Street Fax: 617 253-7300 Cambridge, MA 02139 Email: bemardj@mit.edu May 7, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Room Washington, DC 20555 Re: Massachusetts Institute of Technology
-Request for License Amendment:
Docket No. 50-20;License No. R-37
Dear Sir or Madam:
The Massachusetts Institute of Technology hereby requests an amendment to Technical Specification No. 5.3, "Primary Coolant System." The present wording of that specification stipulates that, "The reactor coolant system shall consist of a reactor vessel, a single cooling loop containing three heat exchangers, and appropriate pumps and valves." It is requested that this wording be changed to, "The reactor coolant system shall consist of a reactor vessel, a single cooling loop containing one or more heat exchangers, and appropriate pumps and valves." Background information on this request is as follows. The original (1973) coolant system for the MITR-II reactor contained two heat exchangers.
In 1978, it was decided to install a third heat exchanger and License Amendment No. 14 (25 August 1978) was issued. It specified the wording noted in the above paragraph.
We now plan to replace all three existing, heat exchangers with a single unit. This change is tentatively scheduled for September 2008. Accordingly, we are requesting the needed change in the wording of Specification 5.3.We note that reactor safety is not a function of the number of heat exchangers.
The issue is whether or not the total heat transfer surface area needed for system heat removal is available.
The single unit that we propose to install does provide the needed heat transfer area and it also takes advantage of the design advances in heat exchanger technology that have been achieved during the past three decades.Attached is a copy of the proposed wording of the new specification in its entirety.
This new wording will also replace that of Technical Specification 5.2 as submitted as part of the relicensing Nuclear Regulatory Commission May 7, 2008 Page 2 request for the MIT reactor except that the last line of the first paragraph of the basis will refer to Specification No. 3.2.3. Also, the pagination will be different.
Please contact the undersigned with any questions.
Sincerely, Joh Bernard, Ph.DPE, CHP Director of Reactor Operations I declare under the penalty of perjury that the foregoing is true and correct.Executed on 2 .CLtCA ---J*Date 7 Signature T cc: Senior Project Manager Research and Test Reactors Branch A Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Senior Reactor Inspector Research and Test Reactors Branch B Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
5.2 Primary
Coolant System Applicability This specification applies to the design of the primary coolant system.Objective To assure compatibility of the primary coolant system with the safety analysis.Specification The reactor coolant system shall consist of a reactor vessel, a single cooling loop containing one or more heat exchangers, and appropriate pumps and valves. All materials, including those of the reactor vessel, which are in contact with the primary coolant (H 2 0), shall be aluminum alloys, stainless steel, or titanium alloys except for small non-corros-ive components such as gaskets, filters, and valve diaphragms.
The reactor vessel shall be designed in accordance with the ASME Code for Unfired Pressure Vessels. It shall be designed for a working pressure of 24 psig and 150 'F. Heat exchangers shall be designed for 75 psig and a temperature of 150 'F. The connecting piping shall be designed to withstand a 60 psig hydro test.Basis The reactor coolant system originally consisted of a single loop that contained two heat exchangers.
It was subsequently modified to add a third heat exchanger although it was normally operated with only two heat exchangers on line. Most recently it has been changed to contain only one heat exchanger.
Core safety is unaffected by the 5-5 number of heat exchangers provided that the required heat transfer surface area is available for heat removal and that primary coolant flow remains as required by Specification 3.7.The materials of construction are primarily aluminum alloy, stainless steel, or titanium alloys and are chemically compatible with the H 2 0 coolant. The design, temperature, and pressure of the reactor vessel and other primary system components provide adequate margins over operating temperatures and pressures.
The reactor vessel was designed to Section VIII, 1968 edition, of the ASME Code for Unfired Pressure Vessels. Subsequent design changes will be made in accordance with the most recent edition of this code.5-6