NRC Staff Transmittal of Seabrook License Renewal Hearing File and Mandatory Disclosures, Hearing File Index, Update 5 - September 6, 2012
ML12250A038
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/06/2012
From: Spencer M B
NRC/OGC
To: Kennedy M F, Ryerson P S, Wardwell R E
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 23433, 50-443-LR, ASLBP 10-906-02-LR-BD01
Download: ML12250A038 (5)


Text

September 6, 2012 In the Matter of NEXTERA ENERGY SEABROOK, LLC (Seabrook Station, Unit 1)

Docket No. 50-443-LR

Dear Administrative Judges:

Pursuant to 10 C.F.R. §§ 2.1203 and 2.336 (as amended August 3, 2012 (77 Fed. Reg. 46562))

and as modified by the Atomic Safety and Licensing Board's ("Board") Initial Scheduling Order dated April 4, 2011 (as amended Orders dated August 23, 2011 and October 3, 2011), and the Board's Memorandum and Order (Granting Joint Motion Regarding Mandatory Disclosures) ("Order"), dated November 10, 2011, the staff of the Nuclear Regulatory Commission ("Staff") is providing an index (Attachment 1) identifying documents subject to disclosure under the Board's Order.

On or about September 6, 2012, materials in the hearing file may be accessed through the Agencywide Documents Access and Management System ("ADAMS") and through the Electronic Hearing Docket ("EHD"). The index contains the ADAMS accession number, document date, and the document title.

Pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Michael Wentzel, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by August 15, 2012.

Administrative Judge Paul S. Ryerson, Chair Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-001

Administrative Judge Dr. Richard E. Wardwell Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001

Administrative Judge

Dr. Michael F. Kennedy Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001

Judge Ryerson September 6, 2012 Judge Kennedy Judge Wardwell The NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding. In identifying these documents, the Staff does not concede their relevance to the license renewal or to the issues to be decided in this proceeding.

Sincerely, Signed (electronically) by

_______________________________

Mary B. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1324 E-mail: Mary.Spencer@nrc.gov Date of signature: September 6, 2012

Enclosures:

Attachment 1: Hearing File Index Attachment 2: Affidavit of Michael Wentzel

ATTACHMENT 1 SEABROOK LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Update 5-September 6, 2012

ID # Accession Number Document Date Title NRC000374 ML122070401 07/10/2012Transcript of the ACRS Plant License Renewal Subcommittee Meeting, July 10, 2012 (Open), Page 1-179.

NRC000375 ML12180A355 07/16/2012RAI for the Review of the Seabrook Station LRA ER-SAMA Review (TAC No. ME3959). NRC000376 ML12199A342 07/17/20122012/07/17 Seabrook LR - Seabrook SAMA RAIs NRC000377 ML12208A110 07/20/2012NextEra Energy Seabrook License Renewal Application, Comments on NRC Safety Evaluation Report with Open Items and Editorial Corrections to Supplement #25.

NRC000378 ML12199A364 07/31/201207/17/12, Summary of Telephone Conference Call Between NRC and NextEra Seabrook (TAC No. ME4028).

NRC000379 ML12214A607 07/31/20122012/07/31 Seabrook LR -

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JULY 17, 2012, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC, CONCERNING THE SEABROOK STATION LICENSE RENEWAL APPLICATION SUPPLEMENT (TAC NO. ME4028)

NRC00380 ML12195A111 07/31/2012Summary of Telephone Conference Call Held on July 3, 2012, Between the NRC and NextEra Energy Seabrook, LLC, Concerning the Draft Request for Additional Information Pertaining to the Seabrook Station, LRA ER (TAC NO. ME3959).

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the Matter of ) ) NextEra Energy Seabrook, LLC ) Docket No. 50-443-LR

)

(Seabrook Station, Unit 1) ) ASLBP No. 10-906-02-LR-BD01

) AFFIDAVIT OF MICHAEL WENTZEL CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Michael Wentzel, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Seabrook Station, Unit 1, license renewal application ("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding. 2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed in the attached Initial Disclosures and that the disclosures are accurate and complete for documents identified as of August 15, 2012. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Accord with 10 C.F.R. § 2.304(d)

Michael Wentzel

Executed in Rockville, Maryland this 6th day of September, 2012

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

In the Matter of )

) NEXTERA ENERGY SEABROOK, LLC ) Docket No. 50-443-LR ) (Seabrook Station, Unit 1) ) ASLBP No. 10-905-02-LR-BD01

)

CERTIFICATE OF SERVICE

I hereby certify that copies of the foregoing letter from Mary B. Spencer to the Board, dated September 6, 2012; Attachment 1 - Seabrook License Renewal Hearing File Index Initial Disclosures; Attachment 2 - Affidavit of Michael Wentzel Concerning Mandatory Disclosure Requirement of 10 C.F.R. § 2.336(b), have been submitted through the E-filing System this 6th day of September, 2012.

Signed (electronically) by

_______________________________

Mary B. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1324 E-mail: Mary.Spencer@nrc.gov Date of signature: September 6, 2012