ML14080A140

From kanterella
Revision as of 21:03, 7 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Standard Practice Procedures Plan
ML14080A140
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 03/10/2014
From: Clark K J
Constellation Energy Nuclear Group, EDF Group, Nine Mile Point
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML14080A140 (4)


Text

I' I CENGM a joint venture of 0constelatlon J eDF Energy 4 NINE MILE POINT NUCLEAR STATION March 10, 2014 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:

SUBJECT:

Document Control Desk Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 Docket Nos. 50-220 and 50-4 10 Standard Practice Procedures Plan for Nine Mile Point Nuclear Station In accordance with 10 CFR 95.19, attached is a minor revision to the Nine Mile Point Nuclear Station Standard Practice Procedures Plan. This revision was performed due to a change in the individual designated as the Facility Security Officer and to reflect that refresher briefings are now conducted annually per 10 CFR 95.33. This updated Standard Practice Procedures Plan is provided for your information and replaces the previous version of the Nine Mile Point Standard Practice Procedures Plan dated August 30, 2011.Should you have any questions regarding this matter, please contact me at (315) 349-5223 or Everett P.Perkins, Director Licensing, at (315) 349-5219.Kevin J. Clark Director Security KJC/MHS

Attachment:

Standard Practice Procedures Plan for Nine Mile Point Nuclear Station cc: NRC Regional Administrator, Region I NRC Resident Inspector NRC Project Manager Nine Mile Point Nuclear Station, LLC P.O. Box 63, Lycoming, NY 13093-0(ý)[

ATTACHMENT STANDARD PRACTICE PROCEDURES PLAN FOR NINE MILE POINT NUCLEAR STATION Nine Mile Point Nuclear Station, LLC March 10, 2014 Standard Practice Procedures Plan The following Standard Practice Procedures Plan applies to facilities authorized to use, but not possess classified information.

This document outlines the security responsibilities of: (Licensee Name)Nine Mile Point Nuclear Station, LLC with it's principal office and place of business at (Street, City, State and ZIP Code)100 Constellation Way, Suite 200C, Baltimore, Maryland 21202 doing business at the address below: 348 Lake Road, Oswe-qo, NY 13126 The provisions of our license with the Nuclear Regulatory Commission (NRC) do not require our company to receive, store, transmit, or originate classified information within our facility(ies).

This company's personnel will, however, have authorized access to classified information at approved NRC facility(ies).

The NRC security clearances granted our personnel have been issued by NRC Headquarters.

We understand our company will be responsible for ensuring that the following security requirements are met: Initial and Refresher briefings (annually) are conducted and documented as required by 10 CFR Part 95, and that the SF-312, Classified Information Nondisclosure Agreement Form, is signed and processed prior to any access to classified information.

Termination briefings are conducted and documented in accordance with 10 CFR Parts 25 and 95 for all cleared personnel leaving our employment, losing their clearances, or no longer requiring a clearance.

Termination statements are forwarded to the NRC Headquarters.

Provisions of the Privacy Act are met when handling and mailing/delivering completed personnel security clearance request documents.

Cleared company personnel are apprized of and comply with the personnel clearance reporting requirements.

Foreign national employees are not placed in a position to exercise control or influence over properly cleared U.S. citizens who have been granted access to NRC classified information.

Reporting requirements involving foreign ownership, control, or influence conditions are complied with.

Procedures are developed describing internal company processes for performing functions to accomplish each of the items above. Applicable company employees will be familiar and comply with security procedures and be informed of their individual responsibilities in executing and supporting these procedures.

Designated representatives of NRC are required periodically to inspect the procedures, methods, and facilities utilized by the company in complying with the requirements of the terms and conditions of 10 CFR Parts 25 and 95. The company shall assist by providing necessary documentation for review.CERTIFICATIONS I have been designated Facility Security Officer and will be responsible for ensuring the above requirements are complied with.1kt4 e a-/Xg/ I ýKevin J. Clark Typed Name) Signature and Date (3150) 349-5223 Phone Number The management representative undersigned certifies that the Facility Security Officer has been given the resources and management support needed to accomplish the above. A new Standard Practice Procedures Plan will be executed if a new Facility Security Officer is appointed.

Certified By (typed name): Chris Costanzo ' Z Title: Site Vice President, me Mile Point NucleafPower Plant Signature and Date: