ML14177A718

From kanterella
Revision as of 07:25, 28 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Senior Reactor and Reactor Operator Initial Examinations for R. E. Ginna Nuclear Power Plant
ML14177A718
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/23/2014
From: Jackson D E
Operations Branch I
To: Pacher J E
Exelon Generation Co, Ginna
Jackson D E
Shared Package
ML14174A998 List:
References
Download: ML14177A718 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 Mr. Joseph E. Pacher, Site Vice President R. E. Ginna Nuclear Power Plant, LLC Exelon Generation Company, LLC 1503 Lake Road Ontario, NY 14519

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS - R. E. GINNA NUCLEAR POWER PLANT

Dear Mr. Pacher:

In a telephone conversation on June 23, 2014, between Mr. J. D'Antonio, Senior Operations Engineer/Examiner, and Mr. T. Harding, Licensing Director, arrangements were made for the administration of licensing examinations at the R.E. Ginna Nuclear Power Plant, during the weeks of December 1 and December 8, 2014.

As agreed during previous discussions with the training department, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 8, 2014. The written examinations, operating tests, and the supporting reference materials identified in Attachment 3 of ES-201 will be due by October 6, 2014. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b)

(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submi tted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), June 23, 2014 J. Pacher 2

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),

Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html.

Thank you for your cooperation in this matter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D'Antonio at (610) 337-5085, or me

at (610) 337-5306.

Sincerely,

/RA/ Donald E. Jackson, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-244 License Nos.: DPR-18

cc: Distribution via ListServ J. Pacher 2 and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),

Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays

a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at:

http://www.nrc.gov/reading-rm/adams/web-based.html.

Thank you for your cooperation in this matter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D'Antonio at (610) 337-5085, or me

at (610) 337-5306.

Sincerely,

/RA/ Donald E. Jackson, Chief Operations Branch

Division of Reactor Safety Docket Nos.: 50-244 License Nos.: DPR-18

cc: Distribution via ListServ Distribution: See Next Page DOCUMENT: G:\DRS\Operations Branch\DAntonio\Exam 2014 Ginna\Ginna120dayexamltr.docx ADAMS PKG: ML14174A998 ADAMS ACCESSION NO.: ML14177A718 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CBixler/CB JDAntonio/JMD DEJackson/DEJ DATE 06/23/2014 6/23/2014 06/23/2014 OFFICIAL RECORD COPY J. Pacher 3

Distribution w/encl: (via E-mail) W. Dean, RA (R1ORAMAIL RESOURCE) D. Lew, DRA (R1ORAMAIL RESOURCE)

H. Nieh, DRP (R1DRPMAIL RESOURCE)

M. Scott, DRP (R1DRPMAIL RESOURCE)

R. Lorson, DRS (R1DRSMAIL RESOURCE) J. Trapp, DRS (R1DRSMAIL RESOURCE)

D. Schroeder, DRP

A. Rosebrook, DRP N. Perry, DRP, SRI D. Dodson, DRP, RI M. Rose, DRP, AA J. Nick, RI OEDO RidsNrrPMREGinna Resource

RidsNrrDorlLpl1-1 Resource Region I Docket Room (with concurrences) D. Jackson, DRS J. D'Antonio, DRS

Distribution

DRS Master Exam File (C. Bixler) (w/concurrences)

DRS File