MONTHYEARML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML15099A0432015-04-0202 April 2015 Amendment to Event Number 50299, 10 CFR Part 21 Notification, Potentially Defective Pressure & Temperature Switches ML15099A0422015-04-0202 April 2015 Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14213A0992014-07-24024 July 2014 Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14303A5262014-03-28028 March 2014 Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12032A2402012-02-0101 February 2012 Notification of Potential Part 21 - 60-Day Interim Report Notification: Failure of CRD Collet Retainer Tube/Outer Tube Weld ML11228A0842011-08-12012 August 2011 Notification of Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1122401422011-08-11011 August 2011 Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1104800542011-02-15015 February 2011 Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades ML1104604872011-02-15015 February 2011 Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades ML1035100312010-12-15015 December 2010 Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1035001742010-12-15015 December 2010 Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1030601022010-10-29029 October 2010 Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves ML1029502812010-10-20020 October 2010 Part 21 Notification - Crack Indications in Marathon Control Rod Blades ML1029305052010-10-20020 October 2010 GE Hitachi Nuclear Energy - Notification of Potential Part 21 60-Day Interim Report: Crack Indications in Marathon Control Rod Blades ML1027300632010-09-27027 September 2010 Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1027006142010-09-27027 September 2010 Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1019403552010-07-12012 July 2010 Part 21 Report for Certain Model 3051N Pressure Transmitters ML1019403092010-07-12012 July 2010 Rosemount Nuclear Notification Under 10 CFR Part 21 for Certain Model 3051N Pressure Transmitters ML1013803962010-05-14014 May 2010 Part 21 Report - Bent Fuel Spacer Flow Wing ML1013700652010-05-14014 May 2010 Part 21 Reportable Condition Notification: Bent Fuel Spacer Flow Wing - GNF2 Fuel ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0809906342008-04-0404 April 2008 Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items ML0808104312008-03-20020 March 2008 Part 21 Report Involving Potential Failure of Certain Rosemount Pressure Transmitters ML0732000862007-11-0909 November 2007 Notification of Potential Part 21 Report Conval Valves Weld Qualifications ML0727504702007-09-21021 September 2007 MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 ML0710101252007-04-0909 April 2007 Fairbanks Morse Engine, Part 21 Notification - Diesel Cam Roller Bushing Failures 2023-03-07
[Table view] |
Text
-t " 0711212010 U.S. Nuclear Regulatory Commission Operations Center Event Report Paze I General Information or Other (PAR)Event# 46085 Rep Org: ROSEMOUNT NUCLEAR INSTRUMENTS, INC. Notification Date / Time: 07/12/2010 10:57 (EDT)Supplier:
ROSEMOUNT NUCLEAR INSTRUMENTS, INC. Event Date / Time: 07/12/2010 (CDT)Last Modification:
07/12/2010 Region: 3 Docket #: City: CHANHASSEN Agreement State: Yes County: License #: State: MN NRC Notified by: DUYEN PHAM Notifications:
TAMARA BLOOMER R3DO HQ Ops Officer: STEVE SANDIN JUDY JOUSTRA R1DO Emergency Class: NON EMERGENCY PART 21 via email 10 CFR Section: 21.21 UNSPECIFIED PARAGRAPH PART 21 REPORT FOR CERTAIN MODEL 3051N PRESSURE TRANSMITTERS Pursuant to 10 CFR Part 21, section 21.21 (b), Rosemount Nuclear Instruments, Inc. (RNII) is writing to inform you that a limited number of Model 3051 N pressure transmitters listed in the attachment may exhibit non-linear and non-repeatable performance.
The affected transmitters were shipped from RNII between August 12, 2002 and September 27,2006.1.0 Name and address of the individual providing the information; Mr. Marc D. Bumgarner Vice President
& General Manager Rosemount Nuclear Instruments, Inc.8200 Market Boulevard Chanhassen, MN 55317 2.0 Identification of items supplied: Certain Model 3051 N pressure transmitters identified in the attachment.
3.0 Identification
of firm supplying the item: Rosemount Nuclear Instruments.
Inc.8200 Market Boulevard Chanhassen, MN 55317 07/12/2010 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 General Information or Other (PAR) Event # 46085 4.0 Nature of the failure and potential safety hazard;The Model 3051 N Smart Pressure Transmitter is dedicated for nuclear use consistent with the requirements of 10 CFR Part 21. It is qualified for use in safety related applications per IEEE 323-1983 (mild environment) and IEEE 344.1987 for seismic applications as documented in its associated qualification reports.Procurement and production records indicate that 53 Model 3051 N pressure transmitters (Ranges 1, 2 and 3)manufactured between August 2002 and September 2006 have sensor module castings that were rnot solution annealed, and therefore may contain elevated levels of hydrogen in the sensor module fill fluid. Solution annealing is a heat treatment process for castings.
It is used to homogenize the casting by reducing any segregated elements that include carbon, which can greatly reduce corrosion resistance.
This process also reduces the level of mobile hydrogen in the casting to a point where out gassing is no longer a reliability concern.Elevated levels of hydrogen in the sensor module casting can create a reliability concern because mobile hydrogen can diffuse through the metal into the sensor module fill fluid and may eventually reach gas solubility limits of the fill fluid. When this occurs, gas vapor bubbles may form, primarily under vacuum process conditions, resulting in a sensor output shift. A transmitter with hydrogen bubbles in the sensor module fill fluid will annunciate itself by exhibiting non-linear and non-repeatable performance.
To date, RNII has not received any 3051N field returns for this issue. However, there have been two confirmed failures related to this issue on a commercially available Rosemount product using the identical sensor module casting. Additionally, there have been other confirmed failures related to this issue on a commercially available Rosemount product using a similar, but not identical casting. These commercial grade product returns prompted additional internal testing and analysis that indicated a potential reliability concern on 3051N transmitters that were manufactured with non-solution annealed module castings.As a result, a thorough evaluation was completed and a notification about the potential substantial safety hazard identified on 7/1/10 is being made in accordance with 10 CFR Part 21 to customers that purchased a 3051N pressure transmitter from the potentially affected population.
5.0 The corrective action which is taken, the name of the individual or organization responsible for that action, and the length of time taken to complete that action:--The last shipment of a 3051 N transmitter With a non-solution annealed sensor module casting was September 2006.-Following September 2006, all sensor module castings utilized on the 3051 N have been solution annealed.-Procurement drawings for the module castings have been reviewed and the requirement to solution anneal all module castings for a model 3051 N transmitter has been verified.-Model 3051N pressure transmitters affected by this notification may be returned to RNII for replacement at no charge.6.0 Any advice related to the potential failure of the item: The end user is advised to determine the impact of this potential reliability issue upon its plant's operation and safety, and take action as deemed necessary.
Affected transmitters may be returned to RNII for replacement at no charge.Rosemount Nuclear Instruments, Inc. is committed to the nuclear industry and remains dedicated to the supply of high quality products to our customers.
If you have any questions, or require additional information related to this issue, please contact: [REDACTED].
07/12/2010 U.S. Nuclear Regulatory Commission Operations Center Event Report Pame 3 General Information or Other (PAR)Event# 46085 The attachment provided with this notification identified pressure transmitters delivered to the following power plants: Vermont Yankee (U.S.), Krsko (Slovenia), Santa Marie de Garona (Spain), Kuosheng Nuclear Power Station (Taiwan), and Ulchin 5 and 6 facilities (Korea).