MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] |
Text
DISTRIBUTION AFTER ISSUAN F OPERATING LTCENSE: NRC FORM t95 U.S.NUCLEAR REGULATORY COMMI ION I g-TBI NRC DISTR1BUTION FGR PART ci0 DOCKET iVATERIAL OO ET NUMBER FILE NUMBER I TO: Mr.Don K.Davis FROM: Miamia, Fl.33101 Robert E.Uhrig GATE OF OOCUMENT 10/24/77 OATS RECEIVED 11 01 77 LETTER gORIGINAI GOOPY QNOTORIZEO QUNCLASSIF IEO PROP INPUT FORM NUMBER OF COPIES RECEIVEO i OESCRIPTION gy++ltC,I y2 77 hY.Furnishing response to 1tr dtd 08 requesting to replace the reference to Regulatory Guide 1.16 in Technical Spec'6.9.1 with the words from Regulatory Gu'1.16'..EN CI OSU RE 12/77 f ication de 3p PLANT NAIlE: ST LUCIE UNIT g 1 j cm 11/02/77 SAFETY BRANCH CHIEF: 7 PQR AC i ION/INFORi>1ATIQN INTcRNAL 0 IST Rl BUTION NRC PDR I QE (2)OELD HANAUER CHECK%38QChk EISENHUT SHAO BAER BUTLER GREE S OLLINS J.OUCs LPDR~TIC NSIC 16 CYS ACRS SENT CATE EXTERNAL OISTRIBUTIQN CONTROL NUMBER hp>77306Qiqi FLORIDA POWER&LIGHT COMPANY October 24,1977 L-77-327 Office of Nuclear Reactor Regulation Attention:
Mr.Don K.Davis, Acting Chief Operating Reactors Branch 52 Division of Operating Reactors U.S.Nuclear Regulatory Commission Washington, D.C.20555
Dear Mr.Davis:
Re: St.Lucie Unit, 1 Docket No.50-335 Re ortin Re uirements~9 Ig IEC<(yg~.~i Si Pg~~@7.C(~)~RE co@g~4f~~pg p b Your letter of August 12, 1977 requested that we replace the reference to Regulatory Guide 1.16 in Technical Specification 6.9.1 with the words from Regulatory Guide 1.16.Sample technical specifications were enclosed for our use.Although your proposal would delete mandatory reporting of Events of Potential Public Interest and use of reporting forms contained in the referenced Regulatory Guide, it would also require changes in several implementing procedures and in the plant staff training program.The procedures and training program would have to be revised to delete reference to Regulatory Guide 1.16 and include reference to the new Technical Specification 6.9.1.Additionally, we believe.that revision of the Technical Specifications as you have suggested would unnecessarily burden them and would result in unnecessary duplication.
We would view the matter differently if Regulatory Guide 1.16 were to be also deleted.After reviewing these considerations, we find that we prefer the existing"reference" format of Technical Specification 6.9.1, and do not plan to propose its amendment at this time.We are, however, available for further discussion of this issue of updating and clarifying technical specification reporting require-ments.One alternative would be to revise the established Regulatory Guide 1.16, thereby achieving the goal of deleting unnecessary reporting requirements while, at the same time, minimizing the amount of written material in the Technical Specifications.
Your letter also discussed NUREG-0161,"Instructions for Prepara-tion of Data Entry Sheets for Licensee Event Report (LER)File." We would like to take this opportunity to comment on NUREG-0161:
L r 773060i4i PEOPLE...SERVING PEOPLE K'I'I%J'I Office of Nuclear Reactor Regulation Page Two (1)NUREG-0161 states that background and any other supplementary information required for a full under-~standin of the event should be provided as an attachment to the LER form.This, being a non-specific open-ended requirement, is subject to interpretation."Sufficient information for full understanding" depends on the reader's background.
(2)The main purpose of the LER form is to provide in-formation on off-normal events to a computer data bank.Since attached information is not used for this purpose, the attachment becomes of secondary importance and need.not be the subject of special instructions.
(3)Compatibility with the Nuclear Plant Reliability Data System (NPRDS)does not necessarily make the new LER'orm less burdensome, as claimed in the Introduction to NUREG-0161.
The responsibilities for compiling NPRDS reports and LER's reside with different groups within, Florida Power 6 Light Company.Increased coordination of these responsibilities would actually increase the work load.In addition, the new LER forms are longer and more detailed, and vill not be easier tg complete, than the current.forms.(4)The"PROCEDURES" section on page 3 of NUREG-0161 claims that."the procedures described herein do not impose any additional reporting requirements." This will be true as long as NUREG-0161 instructions are interpreted as"guidelines" and not"requirements." (5)One effect, of NUREG-0161 will be to expand one report into two reports, i.e., the LER abstract which is intended to,stand alone, and the separate narrative attachment.
This considerably increases the work needed to file a Reportable Occurrence report.Technical Specification
6.9.1 requires
that Reportable Occurrences be reported in accordance with Regulatory Guide 1.16, Revision 4.The Guide specifies that written followup reports should include, as a minimum, a completed copy of a Licensee Event Report form, to be supplemented by additional narrative material to provide complete explanation of the circumstances surrounding the event.Our current practice of continuing the Event Description and Cause Description on a separate page whenever more space is needed satisfies the Technical Specification requirements.
A separate narrative attachment that restates the LER form in greater detail is therefore unnecessary.
Office of Nuclear Reactor Regulation Page Three Although we have objections to NUREG-0161 as described above, we do intend to implement the new LER form with the understanding that our Reportable Occurrence reports will maintain their present overall format, and that NUREG-0161 will not, become an auditable requirement.
Also, rather than change our reporting practices in mid-year, it would be simpler for us to continue using the current LER form for the remainder of 1977 and begin using NUREG-0161 for general guidance in implementing the new LER forms after January 1, 1978 Very truly yours, Robert E.Uhrig Vice President REU/MAS/cpc cc: Mr.James P.O'Reilly, Region II Robert Lowenstein, Esquire