IA. JAMES CLARK SCHOOL OF ENGINEERING August 27, 2008 Document Control Desk U.S. Nuclear regulatory Commission Washington D.C. 20555 ANNUAL REPORT Enclosed is the Annual Report for the Maryland University Training Reactor (MUTR) in accordance with the requirements set forth in the facility Technical Specifications.
This report covers the time period July 1, 2007 through June 30, 2008.Sincerely, Vincent G. Adams Associate Director, Maryland University Training Reactor Cc: Reactor Files A4D2o ge4R Department of Materials Science & Engineering Building 090
- Stadium Drive
- College Park Maryland
- 20742-2115 ANNUAL REPORT: July 1, 2007 -June 30, 2008 FOR THE MARYLAND UNIVERSITY TRAINING REACTOR License No. R-70 Docket No. 50-166 Department of Materials and Nuclear Engineering A. James Clark School of Engineering University of Maryland, College Park College Park, MD 20742-2115 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT TABLE OF CONTENTS TA B LE O F C O N TEN T S ......................................................................................................
1 I. IN TR OD U CTION ..................................................................
......................................
2 II. R EA CTO R U SA G E .......................................................................................................
3 III. SURVEILLANCE TESTS AND INSPECTIONS
........................................................
4 IV. CHANGES TO THE FACILITY ...................................................................................
6 V. ENVIRONMENTAL SURVEYS OF SURROUNDING AREAS ................................
7 VI. RADIOACTIVE RELEASE AND DISCHARGE TO THE ENVIRONMENT
.................
8 VII. ALARA REVIEW FOR FACLITY PERSONNEL AND VISITOR EXPOSURE ..... 9 VIII. UNSCHEDULED REACTOR SHUTDOWN/REPORTABLE OCCURENCES
..... 10 IX .SPECIA L EX PERIM EN TS ...............................................................................................
11 x. CHANGES IN FACLITY STAFF ...............................................................................
12 A. APPENDIX A. EPA COMPLIANCE
..........................................................................
13 1 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT I. INTRODUCTION The University of Maryland Training Reactor (MUTR) is an open-pool type, TRIGA fueled reactor licensed for operation at 250 kW thermal power. The core is cooled by natural convection of the pool water with auxiliary cooling provided for protection of the filters and ion exchange equipment associated with reactor support piping.The MUTR is used for academic instructions and operator training, performance of neutron and gamma irradiations, neutron activation analysis experiments, and tours and demonstrations for groups internal and external to the campus as well as for visiting nuclear power plant trainees.2 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT REACTOR USEAGE During the past year the MUTR operated for a total of 48 runs (Run Numbers 3867 -3915), which are categorized below: Operator Training/Requalification*
13 runs Tours, Labs & Demonstrations 15 runs Calibration, Maintenance, and Surveillance 15 runs Irradiations and Activations 6 runs*Note: Some runs involved training and surveillance and may be counted in both categories.
- Note: Some of the runs in the Classes category consisted of irradiations.
They are not included in the Irradiations category.To perform these runs the core produced 9.704 MWh (kWh meter change from 234687 kWh to 244380 kWh), with a corresponding burnup of 0.55 Grams ofU-235.3 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT III. SURVEILLANCE TESTS AND INSPECTIONS All required surveillance tests and inspections were performed at the specified intervals.
The required surveillance items for this reporting period include: WATER SAMPLE TESTS AIR SAMPLE TESTS RADIATION SURVEYS CONTROL ROD DROP TEST RAM CALIBRATION SNM INVENTORIES ALARA REVIEW In addition to the above surveillance items, the following maintenance operations were performed on the indicated dates: 9/10/07 Dri-rite baked.12/03/07Dri-rite replaced 3/04/08 Dri-rite baked.6/15/08 Replaced air pump and Dri-rite.Additional minor maintenance was performed such as light bulb replacement and fine-tuning of equipment was performed as necessary.
Additional descriptions of some items from above can be found in Section IV.4 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT IV. CHANGES TO FACILITY There were no significant changes to the Facility during this reporting period.5 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT V. ENVIRONMENTAL SURVEYS OF SURROUNDING AREAS All continuous monitoring for this year was accomplished using fixed-mounted film badges throughout the interior of the reactor building itself. These badges recorded the following exposures:
Monitor 2 3 4 5 6 7 8 9 10 Location Control Room Pool Surface Hot Room Prep Room S. Wall Upper S. Wall Lower E. Wall Lower Pump Room N. Wall Lower W. Wall Lower Dose (mrem)63 265 310 77 0 13, 49 227 1350 350 6 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT VI. RADIOACTIVE RELEASE AND DISCHARGE TO THE ENVIRONMENT The Reactor Storage Sump was not discharged during this reporting period.The only release from the MUTR consists ofAr-41. From Section 11 of the SER for the MUTR, a 9.7 MWh operation year would result in the generation of 38.6 mCi of Ar-41 for the entire year from the reactor pool tank. For this operation year, a combined 15.9 mCi of Ar-41 was released to the reactor building.
This value was used in the EPA program COMPLY. The MUTR meets the EPA level 2 compliance for airborne release of radioactive materials.
A copy of the output for the EPA computer program "COMPLY" is appended with this report.7 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT VII. ALARA REVIEW FOR FACILITY PERSONNEL AND VISTOR EXPOSURE A review of exposure records and all facility operations were performed by facility management as part of the annual ALARA audit. For this reporting period, all badged personnel and students received doses less than ten per-cent of their annual dose limit.The Pocket Dosimeters recorded minimal exposure for all guests and service personnel.
Calibrations of these self-reading dosimeters were performed on an annual basis by the University of Maryland's Radiation Safety Office.8 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT VIII. UNSCHEDULED SHUTDOWNS/REPORATBLE OCCURRENCES No unscheduled shutdowns occurred during this reporting period.There were no reportable occurrences during this reporting period.9
- MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT IX. SPECIAL EXPERIMENTS There were no special experiments performed during this reporting period.10 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT X. CHANGES IN FACILITY STAFF There were no significant changes to staffing during this reporting period.11 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT APPENDIX A: EPA COMPLIANCE Below is the output from the EPA program COMPLY for the Ar-41 release from the MUTR: COMPLY: Vl.5d.7/11/08 10:19 40 CFR Part 61 National Emission Standards for Hazardous Air Pollutants REPORT ON COMPLIANCE WITH THE CLEAN AIR ACT LIMITS FOR RADIONUCLIDE EMISSIONS FROM THE COMPLY CODE, VERSION 1.5d Prepared by: Maryland University Training Reactor University of Maryland College Park, MD 20742 Dr. Mohamad Al-Sheikhly (301) 405-5214 Prepared for: U.S. Environmental Protection Agency Office of Radiation Programs Washington, D.C. 20460 12 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT COMPLY: VI.5d.7/11/08 610:19 2007-2008 MUTR Annual Report Ar-41 Release SCREENING LEVEL 1 DATA ENTERED: Effluent concentration limits used.DATA ENTERED FOR STACK 1: Nuclide AR-41 CONCENTRATION (curies/cu m)3.84E-05 DATA ENTERED FOR STACK 2: CONCENTRATION Nuclide (curies/cu m)AR-41 3.84E-05 NOTES: Input parameters outside the "normal" range: None.RESULTS: You are emitting 4750.0 times the allowable amount given in the concentration table.* Failed at level 1.13 MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT COMPLY: V1.5d. 7/11/08 10:19 7 2007-2008 MUTR Annual Report Ar-41 Release SCREENING LEVEL 2 DATA ENTERED: RELEASE RATES FOR STACK 1.Release Rate Nuclide (curies/YEAR)
AR-41 3.814E-02 RELEASE RATES FOR STACK 2.Release Rate Nuclide (curies/YEAR)
AR-41 3.814E-02 SITE DATA FOR STACK 1.Release height 8. meters.Building height 11 meters.The source and receptor are not on the same building.Distance from the source to the receptor is 8 meters.Building width 15 meters.SITE DATA FOR STACK 2.Release height 8 meters.Building height 11 meters.The source and receptor are not on the same building.Distance from the source to the receptor is 8 meters.Building width 15 meters.Default mean wind speed used (2.0 m/sec).14 N d MARYLAND UNIVERSITY TRAINING REACTOR 2007-2008 ANNUAL OPERATING REPORT COMPLY: Vl.5d. 7/11/08 10:19 NOTES: Input parameters outside the "normal" range: None.RESULTS: Effective dose equivalent:
3.7E-02 mrem/yr.Comply at level 2.This facility is in COMPLIANCE.
It may or may not be EXEMPT from reporting to the EPA.You may contact your regional EPA office for more information.
END OF COMPLIANCE REPORT **********
15 Google Calendar http://www.google.com/calendar/render~tab--mc&gsessionid=SPq6U~bGwBATIDSýMit 10 8 11 12 9 Vin.e source change to I 131 14 15 17 18" i9.I.I..11y* 2Tour 2C 21 22 23 24 25 261 9 Training 9 Requal 9 Air & Water 9 TOUR ENES 100 9 Tra nlng 2p Tour 27 29 30 31 1 2 9 Tr ntng 9 Training 9 Requal 2p Tour 8/27/2008 10:42 AM 4.MUTR, UMD gamma cell, UMD LINAC, Requal training, UMD gamma call, UMD gamma cell, UMD Gamma Cell, UMIPUMD, Aug 2008 (Eastern Time)Gamma Cell U M D linac 9am -Training @9am -Training @9am -Requal @ MUTR 2pm 'Tour@ MUTR 4ý 4 Li-L7_Eric OLD SOURCE Sam -NRC Training a Sam -NRC Training 0 9am -Training @9am -Requal training 9am -Training @1pm -Tour@ RX 10 9am -Requal @ MUTR 9am -Requal training 1prm -PE group 2pm -Tour@ MUTR 9am -Training @ 9am -Requal training gam -Requal training (Change to NEW 9am -Training @ 9am -Requal @ MUTR 9am -Requal training 0_7 01 22 L! L23 9am -Training @ 9am -Requal training 9am -Requal training 9am -Requal @ MUTR 9am -Training @ 9am -Raqual training"' 127 29 21Lt30 I NRC Inspection I Sam -U.S. NRC Inspection