Mid Cycle Letter Regarding Performance Review and Inspection Report
ML082460586
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/02/2008
From: Sykes M D
NRC/RGN-II/DRP/RPB3
To: Stall J A
Florida Power & Light Co
Shared Package
ML082460584 List:
References
Download: ML082460586 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 September 2, 2008 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

MID CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - ST. LUCIE NUCLEAR PLANT

Dear Mr. Stall:

On August 13, 2008, the NRC staff completed its performance review of St. Lucie Nuclear Plant, Units 1 and 2 for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only-Security Related Information" will include the Physical Protection/Security cornerstone performance review and resultant inspection plan.

Plant performance for the most recent quarter at St. Lucie, Units 1 and 2 was within the Licensee Response column of the NRC

=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. In addition, TI 2515/173, Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative, will be performed at your facility prior to August 30, 2010. In the near term, we will contact you to assess your readiness for this inspection and then finalize our schedule accordingly.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC

=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

FP&L 2 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 404-562-4629 with any questions you may have regarding this letter or the inspection plan.

Sincerely, /RA/ Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects

Enclosure:

St. Lucie Nuclear Plant Inspection / Activity Plan Docket Nos.: 50-335, 50-389 License Nos.: DPR-31, DPR-41

_________________________ X SUNSI REVIEW COMPLETE /SON/ OFFICE RII:DRP RII:DRP SIGNATURE SON /RA/ MDS /RA/ NAME SNinh MSykes DATE 08/29/2008 08/29/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FP&L 3 cc w/encl: Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution Michael Page Operations Manager (Acting) St. Lucie Nuclear Plant Electronic Mail Distribution Christopher R. Costanzo Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution

Terry L. Patterson Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution

Abdy Khanpour Vice President Engineering Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Don E. Grissette Vice President, Nuclear Operations - South Region Florida Power & Light Company Electronic Mail Distribution M. S. Ross Managing Attorney Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution

William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Douglas Anderson County Adminstrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982 Mano Nazar Senior Vice President and Nuclear Chief Operating Officer Florida Power & Light Company Electronic Mail Distribution Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010 Peter Wells (Acting) Vice President, Nuclear Training and Performance Improvement Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

Mark E. Warner Vice President Nuclear Plant Support Florida Power & Light Company Electronic Mail Distribution FP&L 4 Letter to J. Art Stall from Marvin D. Sykes dated September 2, 2008

SUBJECT:

MID CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - ST. LUCIE NUCLEAR PLANT Distribution w/encl:

C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC B. Mozafari, NRR Institute of Nuclear Power (INPO)