ML13003A275

From kanterella
Revision as of 03:58, 13 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

South Texas Project, Units 1 & 2, Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid
ML13003A275
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/27/2012
From: Rencurrel D W
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-12002931
Download: ML13003A275 (4)


Text

Nuclear Operating Company South Texas Pro/ed Electric Generating Station PO. Box 289 Wadsworth.

Teas 77483 n/n -November 27, 2012 NOC-AE-12002931 10 CFR 50.54(f)U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident m

References:

1. NRC Letter, Eric Leeds to E. D. Halpin, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012 (ML12056A046)
2. NRC Letter, David L. Skeen to Adrian P. Heymer, Endorsement of Electric Power Research Institute (EPRI) Draft Report 1025286, "Seismic Walkdown Guidance," dated May 31, 2012 (ML12145A529)
3. Letter, D. W. Rencurrel to NRC Document Control Desk, "120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated July 9, 2012, NOC-AE-12002882 (ML12200A030)

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to STP Nuclear Operating Company (STPNOC).

Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic. This letter provides STPNOC's 180-day response to Reference 1 for Recommendation

2.3 Seismic

for South Texas Project (STP) Units 1 and 2.Specifically, Enclosure 3 of Reference 1 states that within 180 days of the NRC's endorsement of the walkdown process (Reference 2), each addressee will submit its final response, including a list of any areas that are unable to be inspected due to inaccessibility and a schedule for when the seismic walkdown will be completed.

In Reference 3, STPNOC confirmed the use of EPRI 1025286, "Seismic Walkdown Guidance:

For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic")

as endorsed by Reference 2 to conduct the walkdowns and develop the needed information at STP Units 1 and 2.Ao&(STI: 33626713 NOC-AE-12002931 Page 2 of 3 Enclosure 1 provides STPNOC's final response to Recommendation

2.3 Seismic

for South Texas Project Electric Generating Station (STPEGS) Unit 1. Enclosure 2 provides STPNOC's final response to Recommendation

2.3 Seismic

for STPEGS Unit 2.A list of commitments is provided in the Attachment to this letter. This submittal completes the commitment provided in Attachment 1 of Reference

3. There are no other regulatory commitments in this letter.If there are any questions regarding this letter, please contact Coley Chappell at (361) 972-4745 or me at (361) 972-7867.I declare under penalty of perjury that the foregoing is true and correct.Executed on 1/27 /,Z 2-...2 /2 16 15. W. Rencurrel Senior Vice President ccc

Attachment:

List of Commitments

Enclosures:

1. Seismic Walkdown Summary Report for STPEGS Unit 1 2. Seismic Walkdown Summary Report for STPEGS Unit 2 NOC-AE-12002931 Page 3 of 3 cc: (paper copy)(electronic copy)Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Balwant K. Singal Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8 B13)11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Eric Leeds Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North (MS 13 H 16M)11555 Rockville Pike Rockville, MD 20852 Carl F. Lyon Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8 B1A)11555 Rockville Pike Rockville, MD 20852 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP Balwant K. Singal Carl F. Lyon U. S. Nuclear Regulatory Commission John Ragan Chris O'Hara Jim von Suskil NRG South Texas LP Kevin Polio Richard Pefha City Public Service Peter Nemeth Crain Caton & James, P.C.C. Mele City of Austin Richard A. Ratliff Texas Department of State Health Services Alice Rogers Texas Department of State Health Services Attachment NOC-AE-12002931 Page 1 of 1 List of Commitments The following table identifies the actions to which the STP Nuclear Operating Company (STPNOC) has committed.

Statements in this submittal with the exception of those in the table below are provided for information purposes and are not considered commitments.

Commitments Scheduled Condition Due Date Report STPNOC will use EPRI 1025286, "Seismic Walkdown Guidance:

For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic" as endorsed by the NRC to conduct the walkdowns of areas at South Texas 07/31/2013 12-12304-10 Project (STP) Units 1 and 2 that are inaccessible and could not be completed prior to the submittal of the 180-day final response.Enclosure 2 to this letter, STPEGS Unit 2 Seismic Walkdown Summary Report Section 3.3, "Inaccessible Items," identifies fifteen (15) items for STP Unit 2 on the seismic equipment walkdown list (SWEL) that were not sufficiently accessible to complete the walkdown inspection during normal plant operations.

These items are indicated as such by a footnote 07/31/2013 12-12304-11 in Appendix B Table B-5 "Unit 2 SWEL" indicating that the walkdowns for these items are planned to be completed by the end of May 2013. An updated final report will be submitted approximately 60 days following the completion of these walkdowns.