Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML13003A275
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/27/2012
From: Rencurrel D
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-12002931
Download: ML13003A275 (4)


Text

Nuclear Operating Company South Texas Pro/ed Electric GeneratingStation PO.Box 289 Wadsworth. Teas 77483 n/n - m November 27, 2012 NOC-AE-12002931 10 CFR 50.54(f)

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)

Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

References:

1. NRC Letter, Eric Leeds to E. D. Halpin, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012 (ML12056A046)
2. NRC Letter, David L. Skeen to Adrian P. Heymer, Endorsement of Electric Power Research Institute (EPRI) Draft Report 1025286, "Seismic Walkdown Guidance," dated May 31, 2012 (ML12145A529)
3. Letter, D. W. Rencurrel to NRC Document Control Desk, "120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated July 9, 2012, NOC-AE-12002882 (ML12200A030)

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to STP Nuclear Operating Company (STPNOC). Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic. This letter provides STPNOC's 180-day response to Reference 1 for Recommendation 2.3 Seismic for South Texas Project (STP) Units 1 and 2.

Specifically, Enclosure 3 of Reference 1 states that within 180 days of the NRC's endorsement of the walkdown process (Reference 2), each addressee will submit its final response, including a list of any areas that are unable to be inspected due to inaccessibility and a schedule for when the seismic walkdown will be completed. In Reference 3, STPNOC confirmed the use of EPRI 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic") as endorsed by Reference 2 to conduct the walkdowns and develop the needed information at STP Units 1 and 2. Ao&(

STI: 33626713

NOC-AE-12002931 Page 2 of 3 provides STPNOC's final response to Recommendation 2.3 Seismic for South Texas Project Electric Generating Station (STPEGS) Unit 1. Enclosure 2 provides STPNOC's final response to Recommendation 2.3 Seismic for STPEGS Unit 2.

A list of commitments is provided in the Attachment to this letter. This submittal completes the commitment provided in Attachment 1 of Reference 3. There are no other regulatory commitments in this letter.

If there are any questions regarding this letter, please contact Coley Chappell at (361) 972-4745 or me at (361) 972-7867.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on 1/27 /,Z 2-...2 /2 16

15. W. Rencurrel Senior Vice President ccc

Attachment:

List of Commitments

Enclosures:

1. Seismic Walkdown Summary Report for STPEGS Unit 1
2. Seismic Walkdown Summary Report for STPEGS Unit 2

NOC-AE-12002931 Page 3 of 3 cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 1600 East Lamar Boulevard Arlington, TX 76011-4511 Balwant K. Singal Carl F. Lyon U. S. Nuclear Regulatory Commission Balwant K. Singal John Ragan Senior Project Manager Chris O'Hara U.S. Nuclear Regulatory Commission Jim von Suskil One White Flint North (MS 8 B13) NRG South Texas LP 11555 Rockville Pike Rockville, MD 20852 Kevin Polio NRC Resident Inspector Richard Pefha U. S. Nuclear Regulatory Commission City Public Service P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady Peter Nemeth City of Austin Crain Caton & James, P.C.

Electric Utility Department 721 Barton Springs Road C. Mele Austin, TX 78704 City of Austin Eric Leeds Richard A. Ratliff Director, Office of Nuclear Reactor Regulation Texas Department of State Health U.S. Nuclear Regulatory Commission Services One White Flint North (MS 13 H 16M) 11555 Rockville Pike Alice Rogers Rockville, MD 20852 Texas Department of State Health Services Carl F. Lyon Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8 B1A) 11555 Rockville Pike Rockville, MD 20852

Attachment NOC-AE-12002931 Page 1 of 1 List of Commitments The following table identifies the actions to which the STP Nuclear Operating Company (STPNOC) has committed. Statements in this submittal with the exception of those in the table below are provided for information purposes and are not considered commitments.

Commitments Scheduled Due Date Condition Report STPNOC will use EPRI 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic" as endorsed by the NRC to conduct the walkdowns of areas at South Texas 07/31/2013 12-12304-10 Project (STP) Units 1 and 2 that are inaccessible and could not be completed prior to the submittal of the 180-day final response.

Enclosure 2 to this letter, STPEGS Unit 2 Seismic Walkdown Summary Report Section 3.3, "Inaccessible Items," identifies fifteen (15) items for STP Unit 2 on the seismic equipment walkdown list (SWEL) that were not sufficiently accessible to complete the walkdown inspection during normal plant operations. These items are indicated as such by a footnote 07/31/2013 12-12304-11 in Appendix B Table B-5 "Unit 2 SWEL" indicating that the walkdowns for these items are planned to be completed by the end of May 2013. An updated final report will be submitted approximately 60 days following the completion of these walkdowns.