Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML17223A1982017-07-21021 July 2017 Part 21 Notification - Eaton/Cutler Hammer A200 Series Starter PLA-7613, Interim Report of a Deviation, Units 1 & 2 - (PLA-7613)2017-06-0909 June 2017 Interim Report of a Deviation, Units 1 & 2 - (PLA-7613) ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML1127000672011-09-26026 September 2011 GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML11115A0392011-04-14014 April 2011 Notice of Deviation Pursuant to 10 CFR 21, NPKC-7-21A(N) Splice Kit with Possible Compromised Jacket Seal ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1018907392010-07-0101 July 2010 Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm ML1015305642010-05-28028 May 2010 Part 21 Notification from C & D Technologies, Inc., Post Corrosion on Dcu Batteries ML1009604492010-04-0202 April 2010 Part 21 Report by Tyco Valves and Controls, LP Possible Failure of Solenoid Valves with Dual Function Main Steam Safety Valves ML0934301402009-12-0202 December 2009 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 1OCFR21-0098, Rev. 0, Amot Thermostatic Valve Element, P/N: 9760X ML0232901622002-11-18018 November 2002 Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not Reportable ML18024A0581978-09-18018 September 1978 Letter Attaching a Final Report of a Deficiency in Carriage Bolt Fasteners Used on 480 Volt Motor Control Center Bus Splices ML18024A1011978-07-19019 July 1978 Letter Attaching a Report of Defects Discovered During Qualification and Manufacturing of Control Room Systems ML18024A0661978-07-14014 July 1978 Letter Referring to the April 17, 1978 Letter and Regarding an Update of Interim Report of Reportable Deficiency Regarding Potential Transformers on 4.16K Switchgear ML18024A0681978-07-0505 July 1978 Letter Referring to the April 26, 1978 Letter and Advising the Commission That a Definitive Report Will Be Submitted by September 29, 1978 ML18024A0771978-06-23023 June 1978 Letter Referring to the June 22, 1977 Letter and Relating to the Definitive Report, Prepared by Bechtel Power Corp., of a Reportable Deficiency Regarding Unsatisfactory Field Welding and Inspection of Shear Suds ML18024A0691978-05-31031 May 1978 Letter Referring to the December 1, 1977 Letter Providing an Interim Report of a Deficiency in Physical Separation of Electrical Circuits and Advising the Commission That the Definitive Report Will Be Submitted by September ML18024A0711978-04-26026 April 1978 Letter Attaching Bechtel Engineering'S Interim Report on Spot Welding of Struts for SSES Units 1 and 2 and Advising the Commission That the Definitive Report Will Be Submitted by July 31, 1978 ML18025A4791976-11-0505 November 1976 Interim Report of Reportable Deficiency Defect in RPV Susquehanna Unit 2 Bottom Head Side Plate ML18025A4901975-08-29029 August 1975 Letter Regarding the Definitive Report of Deficiencies in Box Column Supports Which Supplements PLA-74 ML18025A4921975-04-0404 April 1975 Letter Attaching an Interim Report on Potential Deficiency Which Was Discussed with Mr. Heishman on March 6, 1975 2017-07-21
[Table view] |
Text
REGULATORY INFORNATION DISTRIBUTION SYSTEN(RIBS>D5"F/~'F&'I "TRI'BUTION FGRINCOMINGMATERIALREC:QRIERBHNRCORG:CURTISNWPAPWRS.LIGHTDQCDATE:07/05/78DATERCVD:.07/10/78DQCTYPE:LETTERNOTARIZED:
NOCOPIESRECEIVED
SUBJECT:
LTR1ENCL0INORMINGOFNEWDATE09/29/78FGRSUBMITTAL OFUPDATEOFINTERIMREPT'FREPORTABLE DEFICIENCY RESPOTWELDINGGFSTRUTSMATERIAL.
fuQI7PLANTNAMF:SUSQUEHANNA
-UNIT2REVIEWERINITIAL:XJMDISTRIBUTER INITIAL:Hc~qpDISTRIBUTION GFTHISMATERIALISASFOLIGRISNOTFS:SENDISE3CYSFSAR5ALLAMDTSFORACTIONCONSTRUCTION DEFICIENCY REfORT(1OCFRS0.
5SE><DISTRIBUTION CODEB019)ASSTDIRVASSALLO~~4~I TRONLY(1)PROJMGRMINER4HlLTRONLY(1)INTERNAL:
ECr'.LF4l+LTR ONLY(Est+GOSSICK5STAFF4k4tLTR ONLY(1>DIRECTORDPM~~~~LTR ONLY<1)GAB~~<<LTR ONLY(1)ADFOREN64~+LTR ONLY<1)A13FORPLANTSYSTEMS<t4~LTR ONLYSD~~~LTRONLY<1)FERDBREWER/IE~~~~LTR ONLY(i)WBRCl-IIEFLNRN3BC<<LTRONLY<.1)LICASSTLNR53LA>+LTRONLY(i>NRCPDR+slLTR ONLY(i>OELD~<LTR ONLY<i)MIPC4~~~LTR ONLY(1>DEPUTYDIRDPM~~<LTR ONLY(1)DIRECTORl3SS4HILTRONLY(1)ADFQRREACSFTY<~LTR ONLY<1)(ADFORSYS5PRQJ>+LTR ONLY(1>KSEYFRIT/IE+%LTR ONLY<1)EXTERNAL:
LPDR'SlAlILKESBARRErPA4~4~LTR QNLY<TERA4~4LTR ONLY(i)NSIC+<ITRGNIY<i)ACRSCATB~~+LTRONLY(ih>DISTRIBUTION:
LTR41ENCL0SIZE:2P4%%%%%%0M4%40HF+0F+0F+dt%%8M%%%%%%%%%%%
CONTROLNBR:781920008 THEEND%444%%4%%%%%%%%%%4%%%%%%%%%%
r%%%%0
~'~ttj TWONORTHNINTHSTREET,AllENTOWN, PA.18101PHONE:(215)821.5151NORMANWCURTISVicePresident Engineering 8Construction 821.5381July5,1978Mr,BoyceH.GrierDirector, RegionIU.S.NuclearRegulatory Commission 631ParkAvenueKingofPrussia,Pennsylvania 19406SUSQUEHANNA STEAMELECTRICSTATIONUPDATEOFINTERIMREPORTOFREPORTABLE DEFICIENCy REGARDING SPOTWELDINGOFSTRUTMATERIALDOCKETNOS:50-397P50-388LICENSENOS:CPPR-101, CPPR-102ERs100450/100508 FILE840-4PLA-267P"Pc.o
DearMr.Grier:
Reference istomyletterPLA-249,datedApril26,1978.Wehaverecentlydecidedtotakeandtestadditional purposeofevaluating thesubjectdeficiency.
Basedestablished timerequirements forobtaining, testingresults,weconcludethatitwillnotbepossibletoreportbythedate(7/31/78) originally identified.
samplesfortheuponourrecentlyandevaluating thetestsubmitadefinitive Wetherefore submit.foryourinformation anewdate,September 29,1978,bywhichtimeweexpecttosubmittherequiredreport.Verytrulyyours,N,W,CurtisVicePresident;Engineering 8Construction ARS:mcb781920008 PENNSYLVANIA POWER8,LIGHTCOMPANY f
Mr.B.H.GrierJuly5,1978cc:Mr.ErnstVolgenau(15)DirectorOfficeofInspection 6Enforcement U.S.NuclearRegulatory Commission Washington, D.C.20555Mr.G.McDonald, DirectorOfficeofManagement Information andProgramControlU.S.NuclearRegulatory Commission Washington, D.C.20555