MONTHYEARML13070A0772013-02-28028 February 2013 APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051) Project stage: Other ML13136A0222013-02-28028 February 2013 APS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ML13135A3702013-05-17017 May 2013 Notice of 5/30/13 Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF0831 Project stage: Draft RAI ML13143A0892013-05-23023 May 2013 Meeting Notice with Arizona Public Service Company to Discuss the U.S. Nuclear Regulatory Commission (NRC) Staff'S Draft Request for Additional Information Relating to the February 28, 2013, Submittal Project stage: Draft RAI ML13157A0652013-06-10010 June 2013 Request for Additional Information, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (TAC MF0774-MF0776) Project stage: RAI ML13154A4322013-06-13013 June 2013 5/30/13 Summary of Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF083 Project stage: Draft RAI ML13161A2652013-06-20020 June 2013 Redacted, Request for Additional Information, 3/12/2012 NRC Order EA 12-049 Related to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (TAC Nos. MF0829-MF0831) Project stage: RAI ML13161A2522013-06-26026 June 2013 Summary of Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF0831) Project stage: Draft RAI ML13199A0332013-07-11011 July 2013 Response to Request for Additional Information for Overall Integrated Plan in Response to March 12 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order No. EA-12-051) Project stage: Response to RAI ML13206A0062013-07-18018 July 2013 Response to Request for Additional Information for Overall Integrated Plan in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis. Project stage: Response to RAI ML13246A0082013-08-28028 August 2013 First 6-Month Status Report on the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051) Project stage: Other ML13246A0072013-08-28028 August 2013 First 6-Month Status Report on the PVNGS Overall Integrated Plan Project stage: Other ML13296A0062013-10-29029 October 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: RAI ML13308C1532013-11-25025 November 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies Project stage: Acceptance Review ML13336A7752013-12-0202 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies - Correction Letter Project stage: Other ML14065A0392014-02-28028 February 2014 APS Second 6-Month Status Report on the PVNGS Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order Number EA-12-051) Project stage: Other ML14066A0362014-02-28028 February 2014 Second 6-Month Status Report on Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ML14069A5162014-03-19019 March 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (Mitigating Strategies) Project stage: Other ML14239A1812014-09-0808 September 2014 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other 2013-06-13
[Table View] |
Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies - Correction Letter (TAC Nos. MF0829, MF0830, MF0831)ML13336A775 |
Person / Time |
---|
Site: |
Palo Verde |
---|
Issue date: |
12/02/2013 |
---|
From: |
Bowen J S NRC/NRR/DPR/MSD/MSPB |
---|
To: |
Edington R K Arizona Public Service Co |
---|
Boska J P, NRR/DPR, 415-2901 |
References |
---|
TAC MF0829, TAC MF0830, TAC MF0831 |
Download: ML13336A775 (3) |
|
|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Randall K. Edington Executive Vice President Nuclear/ Chief Nuclear Officer Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034 December 2, 2013
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3-INTERIM STAFF EVALUATION RELATING TO OVERALL INTEGRATED PLAN IN RESPONSE TO ORDER EA-12-049-MITIGATION CORRECTION LETTER {TAC NOS. MF0829, MF0830, MF0831)
Dear Mr. Edington:
On November 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) staff issued the public version of the Interim Staff Evaluation of the overall integrated plan in response to Order EA-12-049 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, on the NRC's email list server. The date of the letter was inadvertently omitted from the first page. Enclosed is the first page with the date included. If you have any questions, please contact John Boska at 301-415-2901. Docket Nos. 50-528, 50-529, and 50-530
Enclosure:
As Stated cc w/encl: Distribution via Listserv Jeremy S. Bowen, Chief Project Management Branch Mitigating Strategies Directorate Office of Nuclear Reactor Regulation OFFICIAl USE ONlY PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Randall K. Edington Executive Vice President Nuclear/ Chief Nuclear Officer Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034 November 25, 2013
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1 ,2, AND 3-INTERIM STAFF EVALUATION RELATING TO OVERALL INTEGRATED PLAN IN RESPONSE TO ORDER EA-12-049-MITIGATION STRATEGIES (TAC NOS. MF0829, MF0830, MF0831)
Dear Mr. Edington:
On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Design-Basis External Events" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12054A736). By letter dated February 28, 2013 (ADAMS Accession No. ML 13136A022), Arizona Public Service Company (APS) submitted its Overall Integrated Plan for Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3 in response to Order EA-12-049. By letter dated June 20, 2013, the NRC sent a request for additional information to APS (ADAMS Accession No. ML 13161A259). By letter dated July 18, 2013, APS replied to the request for additional information (ADAMS Accession No. ML 13206A006). By letter dated August 28, 2013 (ADAMS Accession No. ML 13246A007), APS submitted a six-month update to the Overall Integrated Plan. Based on a review of APS' plan, including the six-month update dated August 28, 2013, and information obtained through the mitigation strategies audit process, 1 the NRC concludes that the licensee has provided sufficient information to determine that there is reasonable assurance that the plan, when properly implemented, will meet the requirements of Order EA-12-049 at PVNGS, Units 1, 2 and 3. This conclusion is based on the assumption that the licensee will implement the plan as described, including the satisfactory resolution of the open and confirmatory items detailed in the enclosed Interim Staff Evaluation and Audit Report. Document transmitted herewith contains sensitive unclassified information. When separated from enclosure 2, this document is decontrolled. 1 A description of the mitigation strategies audit process may be found at ADAMS Accession No. ML 13234A503. OFFICIAl USE ONlY PROPRIETARY INFORMATION Enclosure December 2, 2013 Mr. Randall K. Edington Executive Vice President Nuclear/ Chief Nuclear Officer Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3-INTERIM STAFF EVALUATION RELATING TO OVERALL INTEGRATED PLAN IN RESPONSE TO ORDER EA-12-049-MITIGATION CORRECTION LETTER (TAC NOS. MF0829, MF0830, MF0831)
Dear Mr. Edington:
On November 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) staff issued the public version of the Interim Staff Evaluation of the overall integrated plan in response to Order EA-12-049 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, on the NRC's email list server. The date of the letter was inadvertently omitted from the first page. Enclosed is the first page with the date included. If you have any questions, please contact John Boska at 301-415-2901. Docket Nos. 50-528, 50-529, and 50-530
Enclosure:
As Stated cc w/encl: Distribution via Listserv DISTRIBUTION PUBLIC LPL4 R/F RidsNrrDorllpl4 Resource RidsNrrPMPaloVerde Resource RidsAcrsAcnw_MaiiCTR Resource Sincerely, IRA/ Jeremy S. Bowen, Chief Project Management Branch Mitigating Strategies Directorate Office of Nuclear Reactor Regulation JKratchman, NRR/JLD RidsNrrLASLent EBowman, NRR/DPR RidsRgn4MaiiCenter Resource L ML 1333 ADAMS Accession Nos.: Pkg: ML 13326A713, etter: 6A775 OFFICE NRR/MSD/PM NRR/MSD/LA NRR/MSD/MSPB/BC NAME JBoska Slent JBowen DATE 12/02/13 12/02/13 12/02/13 OFFICIAL RECORD COPY