ML12081A105
From kanterella
Revision as of 00:33, 30 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML12081A105 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 03/16/2012 |
From: | Freeman P NextEra Energy Seabrook |
To: | Burritt A L Reactor Projects Branch 3 |
BURRITT, AL | |
Shared Package | |
ML12081A094 | List: |
References | |
SBK-L-12059 | |
Download: ML12081A105 (96) | |
Similar Documents at Seabrook | |
---|---|
Category:Final Safety Analysis Report (FSAR)
MONTHYEARML22131A1082022-05-0505 May 2022
[Table view]1 to Updated Final Safety Analysis Report, Chapter 2.3, Figures ML22131A1262022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix a - C ML22245A0022022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2.4, Figures Redacted ML22131A1012022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix a, Onsite Meteorological Data Summaries, November 1971-March 1973 ML22131A1112022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix J - K ML22131A1232022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix B, Onsite Meteorological Data Summaries, April 1979-March 1980 ML22131A1222022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance ML22131A1022022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix G - I ML22131A1092022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix C, Geologic Investigations of the Scotland Road Fault (Clinton- Newbury Fault), Newbury, Massachusetts, and Portsmouth Fault Investigations ML22131A1062022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22245A1002022-05-0505 May 2022 9 to Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a - Redacted ML22131A1072022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML22131A0952022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22131A0922022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML22131A1212022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix D, Geologic Bedrock Logs of Boring in the Site Area ML22131A1032022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix E, Historical Earthquakes in the Site Vicinity ML22131A1352022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 7 ML22131A1202022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22245A0532022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Section 2.1, Figures - Redacted ML22131A0942022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs ML22131A1242022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix D - F ML22131A0912022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22131A1302022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Part 2 and Appendix H ML22131A0882022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix L - R ML22131A0932022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 1, List of Effective Pages and Introduction and General Description of Plant ML22245A0422022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics - Redacted ML22131A1312022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 3 ML22131A0982022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix F, Geotechnical Report - Reactor Borings, July 1974 ML22131A0992022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22131A1162022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22131A0892022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix I, Report of Analysis of High Energy Line Breaks Outside Containment ML22131A1292022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22245A0592022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 2_Redacted ML22245A0612022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted ML22131A1172022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems ML22131A1002022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Container Liner Anchor Load Tests, Part 1 ML22131A0972022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1 ML22131A0902022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 2 ML22131A0962022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System SBK-L-22042, 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 1 Redacted2022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 1 Redacted ML22131A1252022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML21089A0732021-03-30030 March 2021 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.2, Figures Redacted ML20323A1592020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A Through Appendix 3C ML20323A1522020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems ML20323A1552020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3I ML20323A1512020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2J Through Appendix 2K ML20323A1582020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3D Through Appendix 3F ML20323A1572020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Part 1 ML21089A3662020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Figures, Redacted ML21089A0822020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Figures - Redacted 2022-05-05 Category:Letter MONTHYEARML24254A2552024-09-25025 September 2024
[Table view]Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 L-2024-058, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule 2024-09-25 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML12081A105&oldid=920429"