Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] |
Text
Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 July 10, 2015
SUBJECT: NORTH ANNA POWER STATION UNIT 2 -REVIEW OF THE STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING THE 2014 REFUELING OUTAGE (TAC NO. MF5787)
Dear Mr. Heacock:
The U.S. Nuclear Regulatory Commission (NRC) staff formally reviews all steam generator .(SG) inservice inspection summary reports submitted by licensees in accordance with the plant's Technical Specification requirements. By letter dated February 11, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15050A040), Virginia Electric & Power Co. (the licensee) submitted information summarizing the results of the fall 2014 steam generator tube inspections at North Anna Power Station, Unit 2. The licensee clarified a few minor points during a follow-up phone call, the details of which are summarized in
- the enclosed report. The NRC staff has completed its review of the report and concludes that the licensee provided the information required by North Anna, Unit 2, Technical Specifications and that no additional follow-up is required at this time. The NRC staff's review of this report is enclosed. Please contact me at (301) 415-2597, if you have any questions regarding this issue. Docket Nos. 50-339
Enclosure:
As stated cc w/encl: Distribution via Listserv
Sincerely,. Sreenivas, Project Manager lant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION REVIEW OF THE STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT NORTH ANNA POWER STATION, UNIT 2 DOCKET NO. 50-339 By letter dated February 11, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15050A040), Virginia Electric & Power Co. (the licensee) submitted information summarizing the results of the fall 2014 steam generator tube inspections at North Anna Power Station, Unit 2. North Anna, Unit 2, has three Westinghouse Model 54F replacement Steam Generators (SG) that were installed in 1995. Each SG contains 3,592 thermally treated Alloy 690 tubes, with an outside diameter of 0.875 inches and a wall thickness of 0.050 inches. The tubes are supported by seven Type405 stainless steel tube support plates. The tube support plate holes are quatrefoil-shaped. The U-bend region of the first eight rows of tubing was stress relieved after bending. The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions (e.g., tube plugging) taken in response to the inspection findings. On June 2, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff held a conference call with the licensee to clarify the results of the SG tube inspections at North Anna, Unit 2. The details of the call are summarized below:
- Inspection of the tubes was only performed in SG B.
- The licensee performed video examinations of both channel heads during refueling outage 23. There were no gross defects, no breach of weld metal, no missing filler material in the weld, and no discolorations identified.
- All thirty-five internal feedring J-nozzles were inspected in 2010. Four of the 35 J-nozzles (Number 1, 17, 23, and 35) were inspected in 2014 and there was no evidence of degradation or flow-assisted corrosion. The feedring in SG B is made from stainless steel. There was some discoloration of the riser barrels, but ultrasonic testing noted no wall loss. Enclosure
-2 -* Ultrasonic testing thickness measurements were taken in selected regions of the SG B feedring during the outage and identified localized exterior erosion on the side of the feedring thermal sleeve below the discharge of nozzle #35, with a minimum measured wall thickness of 0.291 inches. The localized erosion was evaluated and determined to be acceptable for continued operation until the next scheduled refueling outage in the spring of 2016.
- There were 63, 50, and 80 pounds of sludge removed from SG A, SG B, and SG C, respectively. These quantities are higher than what was removed in prior outages. These increases were attributed to improved sludge lancing equipment and a better process rather than increased corrosion product transport.
- Visual examinations at the top of the tubesheet showed no foreign objects in any of the three SGs and no eddy current indications of foreign objects werefound in SG B (only SG B was inspected with eddy current in 2Q14).
- There are no plugs installed in SG B. Based on a review of the information provided, the NRC staff concludes that the licensee provided the information required by the Technical Specifications. In addition, the NRC taff concludes that there are no technical issues that warrant follow-up actions at this time since the inspections appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly designed.and operated units.