|
---|
Category:General FR Notice Comment Letter
MONTHYEARML24262A0102024-09-17017 September 2024 Comment (1) of Victoria K. Anderson on Level 3 Probabilistic Risk Assessment Project Documentation (Volume 7) ML24262A0112024-09-13013 September 2024 Comment (2) of Frances A. Pimentel on Design-Basis Floods for Nuclear Power Plants and Guidance for Assessment of Flooding Hazards Due to Water Control Structure Failures and Incidents ML24234A0892024-08-15015 August 2024 Comment (1) of Mark Richter on Acceptable ASME Section XI Inservice Inspection Code Cases for 10 CFR Part 72 ML24200A1852024-07-17017 July 2024 Comment (1) of Frances A. Pimentel on Draft Regulatory Guides: Design-Basis Floods for Nuclear Power Plants and Guidance for Assessment of Flooding Hazards Due to Water Control Structure Failures and Incidents ML24173A0042024-06-14014 June 2024 Comment (1) of Individual on Draft NUREG: Event Report Guidelines ML24173A0052024-06-14014 June 2024 Comment (2) of Tony Brown on Behalf of Nuclear Energy Institute (NEI) on Draft NUREG: Event Report Guidelines ML24114A0252024-04-0808 April 2024 Comment (4) of Charlotte Shields on DG-5080 Uas Question ML24093A0392024-03-28028 March 2024 Comment (1) of Thomas Basso on Preparing Probabilistic Fracture Mechanics Submittals ML24081A0872024-03-14014 March 2024 Comment of Janet R. Schlueter on Behalf of NEI on Information Collection: Material Control and Accounting of Special Nuclear Material ML24058A0052024-02-23023 February 2024 Comment (5) of Tony Brown on Behalf of Nuclear Energy Institute (NEI) on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 an ML24009A0372023-12-13013 December 2023 Comment (2) of Bruce Montgomery on Draft DUWP-ISG-02, Radiological Survey and Dose Modeling of the Subsurface to Support License Termination ML23353A2442023-12-13013 December 2023 Comment (2) of Bruce Montgomery on Interim Staff Guidance on Subsurface Investigations, Radiological Survey and Dose Modeling of the Subsurface to Support License Termination ML23348A0732023-12-11011 December 2023 Comment (2) of Charlotte Shields on Behalf of Nuclear Energy Institute on Draft Regulatory Guide: Physical Security Event Notifications, Reports, and Records ML23348A0772023-12-11011 December 2023 Comment (1) of Charlotte Shields on Behalf of Nuclear Energy Institute on Draft Regulatory Guide: Preemption Authority, Enhanced Weapons Authority, and Firearms Background Checks ML23349A0442023-12-11011 December 2023 Comment (1) of Charlotte Shields on Draft Regulatory Guide: Suspicious Activity Reports ML23326A1172023-11-21021 November 2023 Comment (1) of Alan Campbell on Proposed Revision to Standard Review Plan Branch Technical Position 7-19, Guidance for Evaluation of Defense-In-Depth and Diversity to Address Common-Cause Failure Due to Latent Design Defects in Digital Safe ML23326A0312023-11-17017 November 2023 Comment (2) of Kati R. Austgen on Draft Regulatory Guide: General Site Suitability Criteria for Nuclear Power Stations ML23284A3892023-10-10010 October 2023 Comment (8) of Ben Holtzman on Guidance for a Technology-Inclusive Content of Application Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Advanced Reactors ML23270B9552023-09-27027 September 2023 Comment (2) of Stewart Yuen on Proposed Revision to Standard Review Plan Section 15.0, Introduction - Transient and Accident Analyses ML23242A0412023-08-25025 August 2023 Comment (2) of Brett Titus on Behalf of NEI on Draft NUREG: Revision to Subsequent License Renewal Guidance Documents, and Supplement to Associated Technical Bases Document ML23236A5292023-08-21021 August 2023 Comment (6) of Bruce S. Montgomery on Draft Interim Staff Guidance: Use of the Decommissioning Trust Fund During Operations for Major Radioactive Component Disposal ML23256A1122023-08-10010 August 2023 Comment (3) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1132023-08-10010 August 2023 Comment (4) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1152023-08-10010 August 2023 Comment (2) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1162023-08-10010 August 2023 Comment (1) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1192023-08-10010 August 2023 Comment (4) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1202023-08-10010 August 2023 Comment (2) of Ben Holtzman on Behalf of Nuclear Energy Institute on Draft Interim Staff Guidance: Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications-Roadmap ML23256A1222023-08-10010 August 2023 Comment (5) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1232023-08-10010 August 2023 Comment (4) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1252023-08-10010 August 2023 Comment (4) of Ben Holtzman on Behalf of Nuclear Energy Institute on Draft Interim Staff Guidance: Review of Risk-Informed, Technology Inclusive Advanced Reactor Applicationsroadmap ML23234A0392023-08-10010 August 2023 Comment (4) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23181A0292023-06-29029 June 2023 Comment (2) of Rod Mccullum on Draft Regulatory Guide: Weather-Related Administrative Controls at Independent Spent Fuel Storage Installations ML23174A0492023-06-16016 June 2023 Comment (2) of Ben Holtzman on Behalf of Nuclear Energy Institute on Draft Interim Staff Guidance: Review of Risk-Informed, Technology Inclusive Advanced Reactor Applicationsroadmap ML23158A2162023-06-0202 June 2023 Comment (2) of Alan Campbell on Draft Regulatory Guide: Guidelines for Lightning Protection for Production and Utilization Facilities ML23159A2472023-05-22022 May 2023 Comment (4) of William Gross on Perimeter Intrusion Alarm Systems ML23143A1982023-05-18018 May 2023 Comment (1) of Richard Mogavero on Behalf of Nuclear Energy Institute on Draft Regulatory Guide: Cybersecurity Event Notifications ML23130A2082023-05-0808 May 2023 Comment (9) of Mark A. Richter on Behalf of Nuclear Energy Institute on Material Compatibility for Non-Light Water Reactors ML23115A0152023-04-0707 April 2023 Comment (1) of Alan Campbell on Draft Regulatory Guide: Criteria for Programmable Digital Devices in Safety-Related Systems of Nuclear Power Plants ML24120A2702023-04-0404 April 2023 Melody Rodridguez NEI Comment on Controlled Unclassified Information ML23089A0012023-03-28028 March 2023 OMB 3150-0035, NEI Comment on 10 CFR Part 21 Information Collection Renewal 2023 ML23094A0632023-03-28028 March 2023 NRC-2022-0145- NEI Official Comment Attachment on 10 CFR Part 21 Information Collection Renewal ML23115A0172023-03-23023 March 2023 Comment (3) of Alan Campbell on Draft Regulatory Guide: Criteria for Programmable Digital Devices in Safety-Related Systems of Nuclear Power Plants ML23074A0472023-03-14014 March 2023 Comment (2) of A. J. Clore on Perimeter Intrusion Alarm Systems ML22354A2422022-12-19019 December 2022 Comment (4) of Thomas Basso on Behalf of Nuclear Energy Institute on Performance-Based Containment Leak Test Program ML23005A2412022-12-16016 December 2022 Comment (1) of Janet R. Schlueter on Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities ML22244A1732022-08-31031 August 2022 Comment (1) of Tony Brown on Behalf of Nuclear Energy Institute on Industry Comments on Draft Appendices to NUREG/BR-0058, Revision 5, Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission ML22242A0302022-08-29029 August 2022 Comment (1) of Victoria K. Anderson on High Energy Arcing Fault Hazard Frequency and Consequence Modeling ML22231B0532022-08-19019 August 2022 Comment (6) of James E. Slider on Nrc'S Fiscal Years 2023-2027 Artificial Intelligence Strategic Plan ML22230A0402022-08-15015 August 2022 Comment (4) of William R. Gross on Behalf of NEI on Update of Facility Security Clearance ML22224A1942022-08-12012 August 2022 Comment (1) of William R. Gross on Behalf of Nuclear Energy Institute on Personnel Access Authorization Requirements for Non-Immigrant Foreign Nationals Working at Nuclear Power Plants 2024-09-17
[Table view] |
Text
6/8/23, 4:08 PM blob:https://www.fdms.gov/d2612833-b433-43d4-9942-826737bc4a90 SUNSI Review Complete Template=ADM-013 As of: 6/8/23, 4:08 PM E-RIDS=ADM-03 Received: May 22, 2023 PUBLIC SUBMISSION ADD: Stanley Gardocki, Bridget Curran, Mary Status: Pending_Post Tracking No. lhz-1pgn-3x0e Neely Comment (4) Comments Due: May 22, 2023 Publication Date: Submission Type: Web 2/21/2023 Citation: 88 FR 10481 Docket: NRC-2022-0157 Perimeter Intrusion Alarm Systems Comment On: NRC-2022-0157-0001 Draft Regulatory Guide: Perimeter Intrusion Alarm Systems Document: NRC-2022-0157-DRAFT-0004 Comment on FR Doc # 2023-03490 Submitter Information Email: txc@nei.org Organization: Nuclear Energy Institute General Comment NEI Comments on Draft Regulatory Guide, DG-5065, Perimeter Intrusion Alarm Systems [Docket ID NRC-2022-0157]
Attachments 05-22-23_NRC_NEI Comments on DG-5065 Perimeter Intrusion Alarm Systems blob:https://www.fdms.gov/d2612833-b433-43d4-9942-826737bc4a90 1/1
WILLIAM GROSS Sr. Director, Security & Incident Preparedness Technical and Regulatory Services 1201 F Street, NW, Suite 1100 Washington, DC 20004 NUCLEAR ENERGY INSTITUTE P: 202.739.8123 wrg@nei.org nei.org May 22, 2023 Office of Administration Mail Stop: TWFN-7-A60M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Program Management, Announcements and Editing Staff Submitted via Regulations.gov
Subject:
NEI Comments on Draft Regulatory Guide, DG-5065, Perimeter Intrusion Alarm Systems [Docket ID NRC-2022-0157]
Project Number: 689
Dear Program Management,
Announcements and Editing Staff, On behalf of our members, the Nuclear Energy Institute (NEI) 1 appreciates the opportunity to provide our comments on Draft Regulatory Guide DG-5065, the proposed revision to Regulatory Guide 5.44, Perimeter Intrusion Alarm Systems. The guidance found in this Draft Guide (DG) is intended to provide an approach that is acceptable to the NRC to meet regulatory requirements for perimeter intrusion alarm systems.
Specifically, this revision describes acceptable approaches for intrusion detection system operability and performance tests.
The following comments are provided for your consideration.
- 1. The DG guidance on early warning systems (EWS) is not sufficient. Section 8.13.5 states: If it has been calculated that an early warning system (EWS) is necessary in order to meet the performance objective of 10 CFR 73.55(b), then that system should meet the established intrusion detection alarm system criterion. However, the DG does not clearly indicate what portions of 10 CFR 73.55 must be satisfied in order to credit the EWS. As many licensees have implemented EWS, NEI 1
The Nuclear Energy Institute (NEI) is the organization responsible for establishing unified industry policy on matters affecting the nuclear energy industry, including the regulatory aspects of generic operational and technical issues. NEI's members include entities licensed to operate commercial nuclear power plants in the United States, nuclear plant designers, major architect/engineering firms, fuel cycle facilities, nuclear materials licensees, and other organizations and entities involved in the nuclear energy industry.
NUCLEAR. CLEAN AIR ENERGY
Program Management, Announcements and Editing Staff May 22, 2023 Page 2 recommends that the NRC engage with industry stakeholders to help inform NRCs refinement of this guidance before it is finalized.
- 2. The DG uses terms and phrases, such as to meet the NRC staffs expectation for this requirement, that imply the guidance is required to comply with the regulations. NEI recommends the language be modified so that it is clear the guidance provides one acceptable method to meet the regulations and other methods could be found acceptable.
- 3. There are examples that are inconsistent with facility threat characteristics. Section 8 of the DG provides an example associated with an adversary characteristic that is not applicable to the power reactor radiological sabotage design basis threat. NEI recommends that the NRC review the guidance and ensure examples are consistent with the adversary characteristics for the applicable facilities.
- 4. Finally, the DG includes an extensive bibliography and list of references but provides no clarity on the NRC expectations concerning applicability to the different categories of covered licensees. The Documents Discussed in Staff Regulatory Guidance section found on page 15 does not adequately address the aforementioned concern. The NRC should consider clarifying the applicability of the various references to each facility type for which the guidance is appropriate. NRC should further clarify which portions of those documents provide guidance acceptable to the NRC, and perhaps more importantly, those portions that are unacceptable. The references found in the DG are an extensive addition (the previous version has no references) and depending on how the NRC chooses to address this comment, it may be appropriate for the NRC to re-notice the DG for public comment.
If you have questions or require additional information, please contact me or AJ Clore (202.739.8025 or ajc@nei.org).
Sincerely, William Gross c: Mr. Gregory Bowman, NSIR/DPCP, NRC Mr. Anthony Bowers, NSIR/DPCP, NRC Ms. Rebecca Lagios, NSIR/DPCP, NRC Mr. Al Tardiff, NSIR/DPCP/MSB, NRC