ML21246A008

From kanterella
Revision as of 14:37, 11 October 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search

Request for Withholding Information from Public Disclosure
ML21246A008
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/14/2021
From: Ellen Brown
Plant Licensing Branch II
To: Coffey R
Florida Power & Light Co
Brown E, NRR/DORL/LPL2-2, 415-2315
References
EPID L-2021-LLR-0038
Download: ML21246A008 (4)


Text

September 14, 2021 Mr. Robert Coffey Vice President Corporate Support Florida Power & Light Company Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 (EPID L-2021-LLR-0038)

Dear Mr. Coffey:

By letter dated May 13, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21134A151), you submitted an affidavit dated May 3, 2021, executed by Gayle Elliott, Deputy Director, Licensing and Regulatory Affairs Framatome, requesting that the information contained in the following document be withheld from public disclosure pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR):

Attachments 1 and 2 of Letter, Mr. Robert Hess (Florida Power & Light, Turkey Point Nuclear Plant) to Document Control Desk (Nuclear Regulatory Commission), with subject, Relief Request RR8 and RR9, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1), Extension of Inspection Interval for Turkey Point Unit 3 and Unit 4 Reactor Pressure Vessel Welds from 10 to 20 Years A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commissions (NRC) Public Document Room and added to the NRC Library in ADAMS.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for Framatome in product optimization or marketability e) The information is vital to a competitive advantage held by Framatome, would be helpful to competitors to Framatome, and would likely cause substantial harm to the competitive position of Framatome.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

R. Coffey Therefore, the document above marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the U.S. Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-2315.

Sincerely,

/RA/

Eva Brown, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-250 and 50-251 cc: Listserv Gayle Elliot Deputy Director Licensing and Regulatory Affairs Framatome 3315 Old Forest Road Lynchburg, VA, 24501

R. Coffey

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 (EPID L-2021-LLR-0038) DATED SEPTEMBER 14, 2021 DISTRIBUTION:

PUBLIC RidsNRRDORL Resource RidsNrrDorlLpl2-2Resource RidsNrrDorl Resource RidsNrrPMTurkey Point Resource RidsNrrLARButler RidsOpaMailResource RidsRgn2MailCenter Resource RidsAcrsAcnw_MailCtr Resource RidsOgcMailCenter Resource ADAMS ACCESSION NO.: ML21246A008 via e-mail OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA DORL/LPL2-2/BC NAME EBrown RButler DWrona DATE 9/2/2021 9/3/2021 9/14/2021 OFFICIAL RECORD COPY