Letter Sequence RAI |
---|
|
|
MONTHYEARML20273A2812020-09-22022 September 2020 Acceptance of Requested Licensing Action License Amendment Request to Resolve Non-Conservative Heat Flux Hot Channel Factor Requiments Project stage: Acceptance Review ML21054A0482021-02-23023 February 2021 Request for Additional Information Regarding Heat Flux Hot Channel Requirement Amendment Request Project stage: RAI 2020-09-22
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24285A1682024-10-11011 October 2024 Email Response: LTR-24-0212 David Lochbaum Letter - Public Access to Advisory Committee on Reactor Safeguards Materials - Seabrook ASR ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24115A2362024-03-28028 March 2024 Acceptance Review: Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23156A3042023-05-31031 May 2023 Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from Pressure Temperature Limits and Low Temperature Over Pressure Protection Curves ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23066A1892023-03-0303 March 2023 OEDO-22-00419: Email Dated 3-3-2023 to Petitioner on Seabrook ASR Petition ML23066A0892023-02-24024 February 2023 OEDO-22-00419 - Email Dated 02/24/2023 to Petitioner on Seabrook Unit 1 ASR Petition ML23020A9392023-01-19019 January 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements (EPID L-2022-LLA-0183) (Email) ML23011A3082023-01-11011 January 2023 Request for Additional Information Regarding Relief Request 4RA-22-001 (L-2022-LLR-0074) ML22341A0012022-12-0606 December 2022 Acceptance of Requested Licensing Action Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML22333A7452022-11-22022 November 2022 OEDO-22-00419 - Email: C-10 Response on PRB Initial Assessment - C-10 Petition on Seabrook ASR Concrete Degradation ML22287A1472022-10-13013 October 2022 2.026 Petition Screen-in Email ML22228A0552022-08-15015 August 2022 Request for Additional Information Steam Generator Tube Inspection Report Review ML22200A1082022-07-19019 July 2022 Acceptance Review for TSTF-577 Amendment ML24285A2022022-07-0202 July 2022 Email Response - LTR-24-0212 - Patricia Skibbee - President C-10 Board of Directors - David Lochbaum ML22153A4152022-05-31031 May 2022 Request for Additional Information Re 120V Inverter LAR from TS Branch - Final ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML22048B5522022-02-17017 February 2022 LTR-22-0010 Reply to Geoff Gilbert Email Concern About Seabrook Station Concrete Degradation ML22062B6642022-02-0707 February 2022 Request for Additional Information 120V Inverter LAR from the Electrical Branch ML22063A0002022-01-25025 January 2022 Requests for Additional Information from Risk Branch Regarding 120V Inverter LAR ML22020A2542022-01-20020 January 2022 LTR-22-0010 Geoff Gilbert, E-mail Concern About Seabrook Station Concrete Degradation ML21097A2512021-04-0707 April 2021 Request for Additional Information Regarding Steam Generator Tube Inspection Report Review for RFO 20 (EPID L-2020-LRO-0066) (Email) ML21054A0482021-02-23023 February 2021 Request for Additional Information Regarding Heat Flux Hot Channel Requirement Amendment Request ML20343A0942020-12-0303 December 2020 Request for Additional Information Regarding Seabrook (COVID-19) Part 73 Force-on-Force Exemption Request (L-2020-LLE-0219) ML20273A2812020-09-22022 September 2020 Acceptance of Requested Licensing Action License Amendment Request to Resolve Non-Conservative Heat Flux Hot Channel Factor Requiments ML20258A1502020-09-14014 September 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding One-Time Change to the AC Sources Operating TS ML20260H4932020-09-11011 September 2020 NRR E-mail Capture - Comanche Peak - Acceptance of Requested Licensing Action - Request to Use Later Code Edition of ASME OM Code ML20230A2962020-08-14014 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Allow a One-Time Change to the AC Sources Operating TS ML20167A1842020-06-11011 June 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding TSTF-411 and TSTF-418 (L-2019-LLA-0237) ML20124A0012020-05-0101 May 2020 Cancellation of Call with Seabrook on Steam Generator Tube Inspections ML20114E1592020-04-23023 April 2020 Email and Request for Additional Information Related to Seabrook License Amendment Request to Degraded Voltage Time Delay Setpoint (L-2020-LLA-0012) ML20101L0402020-04-10010 April 2020 Acceptance of Requested Licensing Action Relief Request to Use Code Case OMN-13 with 2012 Edition of the OM Code ML20101N0932020-04-10010 April 2020 Acceptance of Requested Licensing Action Re Relief Request to Defer ASME Inspections Due COVID-19 (EPIDs L-2020-LLR-0055, -56, and -57) ML20101H3912020-04-0808 April 2020 Verbal Authorization for Seabrook Relief Request 3IIR-7 ML20087K8262020-03-27027 March 2020 Upcoming Steam Generator Tube Inservice Inspection ML20063J9792020-02-28028 February 2020 Acceptance of Requested Licensing Action Amendment Request to Revise Degraded Voltage Time Delay Setpoint ML19347C6732019-12-13013 December 2019 Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-418 ML19296D9122019-10-23023 October 2019 NRR E-mail Capture - Request for Additional Information Related to Seabrook Inverter Amendment (L-2019-LLA-0216) ML19295F5422019-10-15015 October 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise Onsite Power Distribution Requirements ML19275G7832019-10-0101 October 2019 Limited Appearance Statement from New Hampshire State Representative, Robert Harb Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6512019-09-27027 September 2019 Limited Appearance Statement from Joanna Hammond Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6542019-09-26026 September 2019 Limited Appearance Statement from Brian Campbell Regarding the Seabrook Station Unit 1 License Amendment Application ML19196A3592019-07-15015 July 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise the Emergency Core Cooling System Accumulator Technical Specifications ML19169A2412019-06-13013 June 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Relief Requests for the Containment Building Spray Pump Flow and Vibration Testing (Epids L-2019-LLR-00 and L-2019-LLR-00) ML19162A0662019-06-0404 June 2019 Reply to Mr. Rick Jakious'S E-mail of 5-29-2019 to Stephen B. Comley Sr., We the People with Attachments ML19112A1782019-04-22022 April 2019 NRR E-mail Capture - Point Beach; Seabrook; Turkey Point - Acceptance of Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML19101A4042019-04-11011 April 2019 NRR E-mail Capture - Point Beach; Seabrook; St. Lucie; Turkey Point - Acceptance of Licensing Action Relief Request to Use Encoded Phased Array Ultrasonic Examination Techniques for Ferritic and Austenitic Welds ML19070A2382019-03-10010 March 2019 LTR-19-0088 Maura Healey, Attorney General, the Commonwealth of Massachusetts, Ltr NextEras Requests for a License Amendment and Twenty-year Extension Prior to Issuance of a Final Decision in Adjudicatory Hearing on Concrete Degradation at 2024-05-24
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23011A3082023-01-11011 January 2023 Request for Additional Information Regarding Relief Request 4RA-22-001 (L-2022-LLR-0074) ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22228A0552022-08-15015 August 2022 Request for Additional Information Steam Generator Tube Inspection Report Review ML22153A4152022-05-31031 May 2022 Request for Additional Information Re 120V Inverter LAR from TS Branch - Final ML22062B6642022-02-0707 February 2022 Request for Additional Information 120V Inverter LAR from the Electrical Branch ML22063A0002022-01-25025 January 2022 Requests for Additional Information from Risk Branch Regarding 120V Inverter LAR ML21245A4382021-10-0505 October 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Revise 120-Volt AC Vital Instrument Panel Technical Specification Requirements ML21097A2512021-04-0707 April 2021 Request for Additional Information Regarding Steam Generator Tube Inspection Report Review for RFO 20 (EPID L-2020-LRO-0066) (Email) ML21054A0482021-02-23023 February 2021 Request for Additional Information Regarding Heat Flux Hot Channel Requirement Amendment Request ML20343A0942020-12-0303 December 2020 Request for Additional Information Regarding Seabrook (COVID-19) Part 73 Force-on-Force Exemption Request (L-2020-LLE-0219) ML20258A1502020-09-14014 September 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding One-Time Change to the AC Sources Operating TS ML20204A5422020-07-21021 July 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding Degraded Voltage Time Delay Setpoint ML20167A1842020-06-11011 June 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding TSTF-411 and TSTF-418 (L-2019-LLA-0237) ML20114E1592020-04-23023 April 2020 Email and Request for Additional Information Related to Seabrook License Amendment Request to Degraded Voltage Time Delay Setpoint (L-2020-LLA-0012) ML19296D9122019-10-23023 October 2019 NRR E-mail Capture - Request for Additional Information Related to Seabrook Inverter Amendment (L-2019-LLA-0216) ML18163A0352018-06-11011 June 2018 Requests for Additional Information for the Review of the Seabrook Station License Renewal Application ML18121A3992018-05-0101 May 2018 NRR E-mail Capture - Request for Additional Information Regarding ASR Amendment Request ML18113A5292018-04-18018 April 2018 NRR E-mail Capture - Draft - Request for Additional Information Regarding ASR Amendment Request ML18058A0522018-02-27027 February 2018 Enclosurequest for Additional Information (Letter: RAI Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 & 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2) ML18026A8792018-01-29029 January 2018 Final Requests for Additional Information for the Safety Review of the Seabrook Station License Renewal Application Docket No. 05-443 ML17332A3412017-11-29029 November 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Delete Operator Action and Request for Exemption ML17261B2172017-10-11011 October 2017 Request for Additional Information Regarding License Amendment Request Related to Alkali-Silica Reaction (CAC No. MF8260; EPID L-2016-LLA-0007) ML17276B7572017-10-0202 October 2017 NRR E-mail Capture - Draft - Request for Additional Information Regarding ASR Amendment Request ML17214A0852017-08-0404 August 2017 Request for Additional Information Regarding License Amendment Request Related to Alkali-Silica Reaction ML17201Q1072017-07-18018 July 2017 NRR E-mail Capture - Draft - Request for Additional Information Regarding ASR Amendment Request ML17139B8352017-05-24024 May 2017 Final Request for Additional Information Regarding Seabrook License Renewal Application - Set 26 ML17150A2862017-05-0505 May 2017 NRR E-mail Capture - Draft - Request for Additional Information Regarding ASR Amendment Request ML17088A6142017-03-29029 March 2017 Request for Additional Information for the Review of the Seabrook Station License Renewal Application ML16341B9022017-03-0707 March 2017 03/07/2016 Summary of Telecon Held on Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Request for Additional Information Pertaining to the Seabrook Station License Renewal Application ML16342C4672017-03-0101 March 2017 12/01/2016 Summary of Teleconference Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Requests for Additional Information Pertaining to the Seabrook Station License Renewal Application ML16337A0082016-12-0101 December 2016 NRR E-mail Capture - Need for Supplement to ILRT License Amendment Seabrook Station, License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency ML16326A0372016-11-30030 November 2016 Requests for Additional Information for the Review of the Seabrook Station License Renewal Application ML16326A0092016-11-18018 November 2016 NRR E-mail Capture - Request for Additional Information Re. Nextera/Fpl LAR to Adopt TSTF-545 - CACs MF8203, MF8204, MF8208, and MF8209 ML16301A4282016-11-14014 November 2016 Requests for Additional Information for the Review of the License Renewal Application ML16319A4222016-11-10010 November 2016 NRR E-mail Capture - Need for Supplement to ILRT License Amendment ML16319A4212016-11-10010 November 2016 NRR E-mail Capture - Need for Supplement to EAL License Amendment ML16230A1062016-10-0303 October 2016 Request for Additional Information Request to Extend Containment Leakage Test Frequency ML16230A5332016-09-22022 September 2016 Request for Additional Information Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 ML16258A0222016-09-19019 September 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action Alkali-Silica Reaction ML16187A2032016-07-0808 July 2016 Requests For Additional Information For The Severe Accident Mitigation Alternatives (SAMA) Review Of The Seabrook Station License Renewal Application (TAC No. Me3959)- Enclosure ML15328A1392015-12-0404 December 2015 November 23, 2015, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Nextera Energy Seabrook, LLC, Concerning Requests for Additional Information Pertaining to the Seabrook Station ML15251A3332015-10-0202 October 2015 Request for Additional Information Related to the Review of the Seabrook Station, Unit 1, License Renewal Application-SET 25 ML15224A5662015-08-28028 August 2015 Request for Additional Information Related to the Review of the Seabrook Station License Renewal Application-Set 24 ML15131A3382015-06-0505 June 2015 Request for Additional Information Regarding License Amendment 14-03, Changes to Technical Specification 3.3.3.1,Radiation Monitoring for Plant Operations ML15043A2212015-02-24024 February 2015 Request for Additional Information for the Spring 2014 Steam Generator Tube Inspections ML14363A3672015-01-0909 January 2015 Request for Additional Information Regarding the License Amendment Request to Revise the Technical Specification Pressure-Temperature Limits and Request for Exemption from 10 CFR Part 50, Appendix G Minimum Tempt Requirements ML14358A0732014-12-24024 December 2014 Request for Additional Information for License Amendment Request 13-05. Fixed Incore Detector System Analysis Methodology 2024-07-12
[Table view] |
Text
From: Poole, Justin To: Browne, Kenneth; Mack, Jarrett Cc: Danna, James
Subject:
Request for Additional Information Regarding Seabrook Heat Flux Hot Channel Requirement Amendment Request (L-2020-LLA-0187)
Date: Tuesday, February 23, 2021 9:01:00 AM Attachments: L-2020-LLA-0187 Final RAI.pdf Ken/Jarrett, By letter dated August 17, 2020, (Agencywide Documents and Access Management System (ADAMS) Accession No. ML20230A425), NextEra Energy Seabrook, LLC (NextEra, the licensee), requested an amendment to Seabrook Station, Unit No. 1 (Seabrook) Technical Specifications (TS). The proposed license amendment request (LAR) revises the Seabrook TS to resolve non-conservative heat flux hot channel factor (FQ(Z)) requirements. In reviewing the submitted information, the U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is necessary to complete its review.
On February 11, 2021, the NRC staff sent NextEra the DRAFT RAI to ensure that the question is understandable, the regulatory basis is clear, there is no proprietary information contained in the RAI, and to determine if the information was previously docketed. On February 18, 2021, the NRC and NextEra held a clarifying call. During the call, NextEra requested a response date of 30 days from the date of this email. The NRC staff informed NextEra that this timeframe is acceptable. The attached is the final version of the RAIs.
These RAIs will be put in ADAMS as a publicly available document.
Justin C. Poole Project Manager NRR/DORL/LPL I U.S. Nuclear Regulatory Commission (301)415-2048
REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION CHANGES TO RESOLVE NON-CONSERVATIVE HEAT FLUX HOT CHANNEL FACTOR REQUIREMENTS NEXTERA ENERGY SEABROOK, LLC SEABROOK STATION, UNIT NO. 1 DOCKET NO. 50-443 By letter dated August 17, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession number ML20230A425), NextEra Energy Seabrook, LLC (NextEra, the licensee), requested an amendment to Seabrook Station, Unit No. 1 (Seabrook) Technical Specifications (TS). The proposed license amendment request (LAR) revises the Seabrook TS to resolve non-conservative heat flux hot channel factor (FQ(Z)) requirements.
Regulatory Basis NRC Generic Letter (GL) 88-16, Removal of Cycle-Specific Parameter Limits from Technical Specifications, provides the guidance necessary to relocate the cycle-specific values of parameter limits from the TSs to an administratively controlled, core operating limits, in accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR),
Section 50.36(c)(2), insofar as TSs include limiting conditions for operation (LCOs), and of 10 CFR 50.36(c)(5), insofar as it establishes the characteristics of Administrative Controls, such as those set forth in Section 6.8 of the Seabrook TS.
Among other things, 10 CFR 50.36(c)(2)(ii)(B) requires that LCOs include LCOs on a process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. Adherence to LCOs like the heat flux hot channel factor (i.e., FQ) assures that the initial conditions of the emergency core cooling system (ECCS) performance evaluation, performed in accordance with the requirements of 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors, are met. Additional criteria applicable to accident and transient analyses are also identified in Section 4.1 of the enclosure to the licensees LAR.
In accordance with GL 88-16, the Seabrook TS 6.8.1.6.b, states, The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC in:, and TS 6.8.1.6.b.14 indicates that WCAP-10216-P-A, Revision 1A (Proprietary),
Relaxation of Constant Axial Offset Control FQ Surveillance Technical Specification, February 1994, shall be used, in part, to determine TS 3.2.1 AXIAL FLUX DIFFERENCE, and TS 3.2.2 Heat Flux Hot Channel Factor.
NRC Staff Issues 1 and 2: Application of Rj Factor The LAR proposes to apply a burnup-dependent correction factor, Rj, to the formulation for the transient heat flux hot channel factor surveillance parameter (i.e., FQW(Z)). The NRC staff notes the following, concerning this parameter:
- The formulation of the Rj factor is not described in WCAP-10216-P-A, Revision 1A.
- The Rj factor, as described in WCAP-17661-P-A, Improved RAOC [Relaxed Axial Offset Control] and CAOC [Constant Axial Offset Control] FQ Surveillance Technical Specifications, is applied to a FQW(Z) surveillance parameter that is based on a planar-radial (i.e., FXY) surveillance, which the licensee has not proposed to adopt.
NRC Staff Issue 3: Implementation of RAOC Operating Spaces Similar to the Rj parameter described above, the implementation of RAOC Operating Spaces is described in principle in WCAP-17661-P-A and does not appear to be consistent with the methods described in WCAP-10216-P-A, Revision 1A.
NRC Staff Issue 4: Required Actions in Table 3 of Attachment 4 The licensee proposes to adopt Required Actions that would be specified in a Table contained within the COLR. As described in the regulatory basis above, TS 6.8.1.6.b requires the use of NRC-approved analytical methods to specify core operating limits, and for those methods to be listed in the Seabrook TS. Therefore, the methods used to determine the parameter limits in Table 3 must be provided to the NRC for review, approved by the NRC staff, and referenced in the TS.
NRC Staff Issue 5: LIMITATION 2 Imposed in the NRC SE Approving WCAP-17661-P-A LIMITATION 2 imposed in the NRC SE (ADAMS No. ML18298A320) requires final power decrease to 50 percent. This LIMITATION 2 appears applicable to Seabrook, since the first paragraph on page 7 of 35 of Enclosure 1 in the LAR states that the THERMAL POWER is limited to less than 50% RTP, or as specified in cycle specific COLR, to assure additional margin to the transient FQ.
NRC Staff Issue 6: Adequacy of the Proposed Surveillance Formulations 2.10.4 and 2.10.5 in the COLR The LAR proposes Surveillance Formulations 2.10.4 and 2.10.5 in the COLR to address the non-conservatisms identified in NSAL 15-1 regarding the FQ(Z) surveillance formulation. The proposed COLR surveillance formulations do not contain the terms such as T(Z)-COLR and AXY(Z), and use FQ(Z) instead of FXY (Z) in the NRC-approved formulations (Equations 5-1 and 5-2) in WCAP-17661-P-A. The second paragraph on page 5 of 35 of Enclosure 1 in the LAR states that T(Z)-COLR and AXY(Z) are not being pursed due to low safety significant without presenting technical basis supporting the quoted statement. The discussion of adequacy of using FQ(Z) instead of FXY (Z) is not presented in the LAR.
Request For Additional Information (RAI)
RAI - 1 Justify the validity of the adoption of the Rj factor in light of the fact that doing so will result in COLR specifications that do not adhere to the methods referenced in 6.8.1.6.b.14, as required by the Seabrook TS. As necessary, consider proposing a revised TS citation that specifies, with adequate accuracy, the Seabrook-specific methods that would be used.
RAI - 2 Justify the applicability of the Rj factor, in light of the fact that the Seabrook licensee does not intend to adopt the broader surveillance formulation described in WCAP-17661-P-A.
RAI - 3 Justify the implementation of RAOC Operating Spaces as consistent with WCAP-10216-P-A, Revision 1A, or provide additional information to describe how the RAOC Operating Spaces would be formulated. As necessary, consider proposing a revised TS citation that specifies, with adequate accuracy, the Seabrook-specific methods that would be used.
RAI - 4 Describe how the required margin improvements contained in Table 3 of the COLR were formulated, demonstrate that they provide the required, additional margin to justify continued operation in the event FQW(Z) exceeds its limit, and as necessary, consider proposing a revised TS citation that specifies, with adequate accuracy, the Seabrook-specific methods that would be used.
RAI - 5 Discuss the applicability of LIMITATION 2 imposed in the NRC safety evaluation approving WCAP-17661-P-A to Seabrook specific methods. If the licensee determines that LIMITATION 2 is not applicable, please provide rationale for the basis of the determination. If LIMITATION 2 is applicable, please justify a value, other than 50 percent, that would be specified in cycle specific COLR, as stated in the LAR.
RAI - 6 Discuss how the effect of terms, such as [T(z)]COLR and AXY(z), on the proposed FQW formulation in the COLR were determined to involve low safety significance, and justify the adequacy of the proposed surveillance formulations in COLR with use of FQ(Z) instead of FXY (Z) in the NRC-approved formulations (Equations 5-1 and 5-2) in WCAP-17661-P-A.