Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI
ML20206U204
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/19/1999
From: Thadani M
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-M96848, TAC-M96849, NUDOCS 9905250102
Download: ML20206U204 (3)


Text

.

MEMORANDUM TO: Docket File May 19, 1999 FROM: Mohan C. Thadani, Senior Project Manager ORIG SIGNED BY:

Project Directorate I, Section 2 Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3: DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 96-06," ASSURANCE OF EQUIPMENT OPERABILITY AND CONTAINMENT INTEGRITY" (TAC NOS. M96848 AND M96849)

The attached request for additional information (RAl) was transmitted by facsimile on May 19,1999 to Tom Loomis of the licensee's staff. Review of the RAI would allow the licensee to determine and agree upon a schedule to respond to the RAl. This memorandum and the attachment do not convey a formal request for information or represent an NRC staff position.

Docket Nos. 50-277 and 50-278

Attachment:

RAI DISTRIBUTION Docket File" PUBLIC EAdensam (EGA1)

JClifford MThadani PDI-2 r/f DOCUMENT NAylFMDRAFTRAl.WPD g

OFFICE h hI NAME Nhadani/vw DATE I //7/99 OFFICIAL RECORD COPY i l

9905250102 990519 i PDR ADOCK 05000277  !

P PDR  !

I i

t p reopg

& UNITED STATES L :s j

f NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666-0001

,d ,

'+4***** '

May 19, 1999 MEMORANDUM TO: Docket File FROM: Mohan C. Thadani, Senior Project Manager Project Directorate I, Section 2 Division of Licensing Project Management Office of Nuclear Reactor Regulation GUBJECT: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3: DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 96-0S, " ASSURANCE OF EQUIPMENT OPERABILITY AND CONTAINMENT INTEGRITY"(TAC NOS. M96848 AND M96849) l The attached request for additional information (RAI) was transmitted oy facsimile on 1

May 19,1999 to Tom Loomis of the licensee's staff. Review of the RAI would allow the licensee to determine and agree upon a schedule to respond to the RAl. This memorandum and the attachment do not convey a formal request for information or represent an NRC staff position.

Docket Nos. 50-277 and 50-278

Attachment:

RAI

r REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 96-06. " ASSURANCE OF EQUIPMENT OPERABILITY AND 1

CONTAINMENT INTEGRITY."

In a letter dated September 11,1998, PECO Energy Company (the licensee) provided additional information in response to a request for additional information concerning GL 96-06 that was issued by the Nuclear Regulatory Commission (NRC) staff on May 28,1998. The licensee indicated that the temperature in the reactor building closed loop cooling water (RBCCW) system will not exceed 124*F during a loss-of-coolant-accident (LOCA) concurrent with loss of offsite power (LOOP), and therefore boiling will not occur in the RBCCW system, in order to complete our review of the waterhammer and two phase flow issues for Peach Bottom Atomic Power Station, Units 2 and 3, the NRC staff requires additionalinformation as follows.

. Provide a copy of the calculations that were completed by the licensee to reach its conclusions, including sufficient explanation of the methodology and assumptions that were used. This information is needed to allow the NRC staff to perform independent review. Bounding calculations that are conservative will suffice.

. Provide a copy of the vendor's data sheet for the drywell coolers.

Attachment

_ .