ML20126G713
ML20126G713 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 03/26/1981 |
From: | ALABAMA POWER CO. |
To: | |
Shared Package | |
ML20126G710 | List: |
References | |
NUDOCS 8103310427 | |
Download: ML20126G713 (107) | |
Text
i O t ALABAMA POWER COMPANY -
JOSEPH M. FARLEY NUCLEAR PLANT - UNIT NO. 1 ANNU^L NON-RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT PERIOD ENDING DECEMBER 31, 1980
- . s - -
l l
I l
003 1 O Qf, s
1
+
l
. 4 Joseph M._ Farley Nuclear Plant Unit No. 1 Non-Radiological .
- Annual Environmental Operating Report t
' Table of Contents ,
Section ' Title-I . Non-Radiological \'ater Monitoring II Chemical Discharges ,
III Herbicide Application of ,.. ,,
[ Transmission Line Rights-of-Way
Miscellaneous Reports as Required by Section 5.6.la., Part A ;
l 1
1 I
i l <, .
3 INTRODUCTION _
This annual report is submitted pursuant to Sectinn 5.6.1.a.
Part A of the Environmental Technical Specifications, Appendix
. B , to Operating License flPF-2. This report sustarizes the Enviroamental Surveillance Program for the Joseph M. Farley fluclear Plant for the reporting period of January 1 - December 31, 1980.
L
0 . ._ _ .c . ..-. . . . . . . . . , . - - - - --
SECTION I NON-RADIOLOGICAL llATER MONITORING a .
This Section is submitted to fulfill the requirements of Sections 2.1 and 2.2 of the Environmental Technical Specifications for Farley Nuclear Plant.
I I i .
1 I
i l
l 1
i t
y a - , -+ ,.. -- - -
4 I-NON-RADIOLOGICAL WATER MONITORING I. Introduction
~
The purpose of this report is to provide the results of analyses which were perfonted for certain parameters as required by the NPDES permit and Environmental Technical Specifications for the Farley '
Nuclear Plant. This report consists of data provided to EPA and/or AWIC. .
II. Discussion A. Thermal The' temperature of once-through cooling water and service water by-pass was monitored once per week during the months of June, July, and August at the combined discharge prior to mixing with other waste streams as required by the NPDES permit. See Attachment I.
The flow of once-through cooling water and service water hy-pass was ronitored continuously at the combined discharge prior to mixing with other waste streams as required by the NPDE.S, permit.
" See Attachment I. . ..
The temperature of the cooling tower blowdown was monitored once per week during periods of maximum expected temperatures at the discharge from the cooling tower blowdown prior to mixing with other waste streams as required by the NPDES permit. See Attachment II . The flow of the cooling tower blowdown was monitored once per day at the discharge from the cooling tower blowdown prior to mixing with other waste streams as required by the NPDES permit. See Attachment II.
B. Chlorine To prevent any possibility of releasing waste water with chlorine concentrations above the NPDES permit limit, the blowdown is closed during chlorination. The blowdown remains closed until the chlorine concentration has decreased to a concentration below the maximum permissible discharge level. The blowdown can then be opened a s necessary. If the blowdown is not opened on the day the analysis is run, then an analysis may be reported when the flow is zero. See Attachment II for the chlorine analyses for the cooling tower blowdown. Chlorination did not necessarily occur on a weekly basis.
6-l C. p))
Samples were taken prior to mixing with other waste streams and were analyzed at the indicated frequency for pH as required in the NPDES permit for the following waste streams:
Monitoring NPDES Discharge Attachment Waste Streams _ Frequency _ Serial Number _ Number f Cooling Tower Blowdown Turbine Building Sump Once per week Once per week 002 004 II III
( Once per week IV Settling Basin
- 005 Sewage Treatment Plant E ffluent Once per month 007 Y Metal Cleaning Wastes Once per week 008 VI III. Conclusion The parameters of flow, pH, chlorine, and temperature were monitored as required by the NPDES permit and the Environmental Technical Specifications. Non-compliance mports for violations which occurred for these parameters were provided to EPA and/or AWIC. Copies of these mports may be found in the attachments.
~
Other miscellaneous non-compliance reports for NPDES -
violations are given in'Section V.
- In November,1978, the Neutralization Tank Waste (DSN 005) and the Tlemineralization Filter Backwash (DSN 005) were combined and are
- - - referred to as Settling Basin (DSN 005). ,
i ATTACHMENT I i
i t
Once Through Coo?ing Water and Service Water Bypass (DSN001)
Flow and Temperature
- b q -
- Temperature for June, July and August i
l r
I I
l -
t _ _. _ . _ _ _
-1
4
' A L A 3 A :.l A il A T E R I M P R 0 V 'E M E N T C 0 14 !.i ISSX0d uISCHARGE _
is 0 N I T o H I H G REPORT ~
ALABA;.tA Po.1ER C04PANY l
FARLEY NUCLEAR PorsER PLA!!T -
~ AL'-0024 619 JAdJAR(, 1930 -
DISCHARGE 031As UNCE THROJGH C00 LING'- UNIT I -
OATE FLO.i TE.49 AVG --- ---
.4AX
'J ,1 i f r.iJD DEG F FRE') 00NT 1/nK I -32.64 --
2 35.3J -
3 35.05 .
4 31.12 - - - -
S 24.94 6 21.23 -
7 26.83 - -
6 3/.53 ~
9 45.0/ -
43.39 - - - -
l0 .
a 49.52 II ,
12 53.97
- 13 54.07 -~
.- - ~
53.49 14 ,
15 60.60 59.02 lo I 54.65 .. ,
Io 52.32 -
B 19 55./4 - - -
- 55. il
~
20 21 60.3a . .
22 64.46 -
23 63.51 24 61.99 25 56.32 -- - -
26 36.42 '
2: 33.57 28 31.62 29 30.9/
JO 35.59 31 35.i3-AV3 45.00 .
f SIO.lATURE o? RES,)oNSIBLE OFFICI AL# M f,
t .
t i
i - - _ _ _ -.._ - _. _. .--- _ . _
3 -
w ,
w- . , - - - -
5 en
'A L A B A .'l.A ai ATER I.M P R 0 V E 14 E N'T C 0.M M 1 S S.I O N g.. .. . . . . . . . . --
DISCHARGE M 0 fl I T 0 R I 11 G R E.P Q R T . .. . .
ALAB AMA PariER CO,'.'P Ally F ARLEY UUCLEAR Po*:lER PLA'l[ . . . . . . . . . . :. . . . . .
AL-0024619
~
?E8RUARY, 1950 _. ., .. ., , .
DISCHARGE 001A: ONCE THROUGH COOLING - UNIT 1 .
' ' ' ' " ~ " ~
~ ' ' '~
OATE FLO.i TEMP 4.V G
.;, A x ___
~ ~
~
U:4 I T .SiGD DEG F ~
F.< EO Cat 1T 1/nX i
I 28.33 ,
2 29.45 3 27.12 . . . . . . . . _ . ..
30.39 4
5 35.30 \
42.00 ..
c o . .. . . -.. ..._......_......:... . ... _ .. . . . . -
7 37.45 '
8 38.56 -
. 9 36.5.3 . . .. . . . . . . . .. ..
10 . .
42.63 11 .e- ,
12 3.35 ,
13 32.45 '
14 44.05 J 15 47. 11 . . . .
Io 46.20 '
17 41.76 19 30.16 . . .. .
19 24.58 20 30.I4 . . j 21 30.41 ..
22 31.28 23 31.31 24 37.63 . . . . . . .. . . . . . . .. . ...
L 25 27.46 ~
26 31.13 27 32.35 . .
23 23.56 29 27.63 AVG 33.I3 SIGN ATURE OF RES PONSIBLE OFFICI Al#/c;:-EMIM / /#~
f i
I
. . . _ . . . . . . - . . . . . . . . . .. .- - - - - - - . . . - - - - . . - . . - - . . - ~ . - . ~-~y----..~~
ALABAMA ri A.T E i? . I M P R 0 V E M E ff T C 0 M M 1 S S I o 11 0ISCHARGE M d M I T 0.R I N G REPORT ALABAMA' POWER COMPANY
.FARLEY 31UCLEAR POWER PLANT AL-0024619 MARCH, 1980 .. - . . . ,
DISCHARGE C01A: ONCE THROUGH COOLING - UNIT I DATE FLOW TEMP AVG --
MAX --
UNIT MGD DEG F FREO CONT 1//lK 1 32.65 .
2 33.61 3 31.47 . ". .
4 29.94 5 26..I1
, 6 24.22 ~ ~ '
7 30.00 8 30.68 9 24.72 -
10 23.62 *'
, 11 24.38 ' -
12 29.03 ~
~' ~ ~~ ~~ ~~ ~
13 25.65 14 28.62 15 28.38 '
16 30.52 .
1 17 31.35 18 29.51 ' ' ' ' ~' '
19 28.44 20 .26.32 21 30.04 ', ,_ ,
22 30.23 23 27.27 24 26.80 25 29.22 26 30.12
} 27 26.86 .
I 28 30.23 29 36.69 30 27.70 ,
31 24.54 AYJ 28.68 I
)
SIGNATURE OF RESPONSIBLE dFFICI A'M76e #
. . . . ~ - - . ~ . - . - ~ ~ - - . . . . - - - . - . ~ ~ ~ - - - - . - ~ ~ ~ ~ ~ ~ ~ - ~ ~ . ~ ~ - ~ ' ~ ~ ~ ~ ~ ~ - - ~ ~ ~ ~ ~ ~ ~ - ~~
A L A d A .4 A et AidR I 14 P R 0 ( d ,4 d N ' T C 0 c.i.4 I S S IO:
0ISJHAdGd ;4 0 fl ITaH ING RdPOdT ALAdA;4 A PO.idR C0;4PAuY FAHLdY NdCLdAR Pon::H PLA.iT AL-0024619 Add!L, I/do VISCHAdGd OJtA* ONCd THRodGrl COOLING - UNIT I OATd F LO,e fd:49 AVG --- --
- ) AX ---
UNIT .4GJ Ddo F FR63 CosiT 1/,vK 1 29./0 ;
2 20.43 3 30.46 4 29.0/
S 32.04 0 31.31 7 2d.J6 o 29.3/
V 31.d/
l0 30.13 11 30.62 , ,.
12 34.16 13 29.3/ '
l* 2d.22 I5 30.04 lo 32.06 17 32.o1 Ie 32.5d 19 32.57 20 32.5/
21 2d.43 22 29.17 23 29. 16 24 26.3J 2p J0. /6 ,
- 26 3l.25 27 2d.44 ,
de do.40 l 29 26.4J i 30 2/.52
- 1 I AVG JJ.J7
.I 4
5 IJ.lA fJr<d 0F Rd5PoriSIdL5 uFF10i AI/fjS/M e,~ /
. . ~ . . - -
l _ _ . . _ _ , . . _ _ , . _ _ .
A ' L . A d A .4 A se A's E R I t1 P R 0 VE:45NT C 0 :4 14 I S S I O 31 OISCHAHGE r. a tl IT0 RING REPOdT ALAdAi4A FundR Cot 4P ANY FARLEY NUCLEAR PonER PLAitr -
AL-0024619 i.t Af, 1V60 O!SCHAdGd 001A2 Oc1CE THROUGH COOLING - Ur1IT I DATE FLon Td4P AVG --- --
MA.( --- --
U.'l ! T .-4G0 OdG F Fddd CONT 1/nX l 29.91
.2 2d.52 3 32.0/
4 26.34 5 2 /.2V o 29.06 7 28.61 0 32.25 9 32.75 10 31.69 11 26.73 12 26.35 -
13 J2.Od I 14 2 7. 17 lb 37.23 to 2 / .Vd 17 29.07 16 J2.d6
, 19 30.35
! 20 31.45 21 29.52 22 18.12 23 25.30 24 31.09 25 30.13 20 27.21
! 27 23.id j 20 25.24 i 2V 22. /d JO 22 .5o l 31 2d.04 I
j AVG 2d.60 i
'd! Oil ATJn'd UF RdSPoilSISLd 0FF ICI ALM /d7M - - /
8
. . . - * ~==4 - * * * ****=eN
'T T wr -Pr*- 7 gC- 3T1rr-d v e ? "
l l
' ~, .: LEIS: Ads F 8r :F alY' Oi rs l
l r g r / p l Y I : 1 ?:'O l
E*Gr Eu*GE D /. 'r c'FP F2*6r LE 96* 2 62 f:E*FE FC 60*i-9 LE 01*lE C i.
C9*lE ci 6*lr /g*cr et LG'6C EE g *or Et fo**g IE
- o*Er 0%
EC*cv 61 F L * /. 4 Pi i Ol
- D LI 1
t I*LP Er
- ci' ci l 66*FE fl l E. L ' li b ?I 9t*GC El SL*EE El ,
96 * (# 11 O*9E EP*EE Cl EP'OF 6 LL*62 E L t'
- I F L 96*Ef c O*pF I F
- L i' 9 P6*62 r 90*01 E l 29*61 2
/. /
- c E I 1
l 'AP/l ifJ00 CFF?
I 5 D?n CDi' lil'0 vy;
--- --- ;;, s at:J F c I? :'YC i 111,0 - UNIl000 P000HM1 D'Jo rY 100 20MYF0 fir GF61 ' :!rf 619 +'200-lY J ITV~M HE"L/ HYElDPI, AElFV-!
( ).NV A00 M:f'04 V':Y'd Yly l
l l
1 l' OdEF F- :- 1 0 C 1 I f. O l' BCPVU D 5 1 .
'i 0 I 5. F 1 h 1. O O- J J. _: ;l 3AC Fd' I M: JV" Y i. Y ;. 't t
'I- [i
n
. A L A 8 A ;4 A Area I 14 P R o y E f4 E N T e o ;4 :4 I s s I o ;4 1
DISCclAA0E 14 0 tl iTUdING Ri?OdT ALABAaiA P0n2R CO,,tPAtly FARLEY NUCLEAR PonER PLANT AL-0024619 JULY, 1930 OfSCHAdGi cola: 0.102 THROJGH COOLING - VilIT I J JAT5 Fluei T2,.1/
A VG --
14AX -- --
UnilT .4G0 Di3 F '
Fdt:0 CaclT l/nK 1 38.2d 2 44.25 3 43.62 4 43.50 .
5 41.d4 o 39.54 7 40.41 e 41.22 9 37.35 10 38.90 -
- 11 34. 73 39.6 12 26.o2 13 26.90 14 26.19 ,
16 21. l 3 lo 30.30 1/ 25 .77 83.0 le 2 7.32 ,
lY 27.52 20 3I.08 21 36.13 91.9 22 29.29 23 30.35 24 31.56
- 25 11. ll 2o 25.31 2' 7 25.Jl 2d 2/.14 J6.0 29 *I.09 30 49.04 31 4 7.32 AVG 33.93 33.9 51GJAfddi JP di3P0:lSibLi UF.=1v'l/b' Wa A ^
cf
AL'ABAAA .1 ATER ,I M P R 0 V E M E N T C 0 M M I S S I o rt 0 I S C .-l AR0E r4 0 N ITURING REPORT ALABAMA P0ndR CordPAtlY FARLEY NUCLEAR 90ddR PLAc1T AL-0024619 AUGUST, 1980 JISCHA.4Gd .001 A : ONCE THROUGH C00LItiG - UiiIT 1 .
UATd FLO,i TdMP .
AVG --- --
MAX ---
0:4 I f MG0 DEG F FRdd COrlT 1/dK I 45.13 2 37.61 3 42.04 4 25.99 5 33.04 92.0 ,
6 30.d0 7 33.25 6 33.22 9 32.06 10 26.37 '
11 30.00 12 27.27 92.0 13 31.67 le 31.21 -
15 35.96 Io 30.52 17 27.5/
I6 29.0S 19 33.03 20 34.23 ,
21 31.54 22 32.14 90.0 23 32.00 !
24 30.6I l 21.d6 2S 26 40 /d 90.0 ,
27 43.o3 I 2d 46.79 29 22.3d 30 35.94 31 3/.53 A V3 33.20 91.0 Sidcl ATJdd 0F RdSPorlSISL5 0FFI. ./M8de -
Q
~
- - ~ - - - - -----
3 *2s
4 A_L A B A .'( A if A T E R I 11 P R 0 V E 'J E i' 7 0 0 M M I S 5 I O il D ! 5 C if A A G E 11 0 fi I T U R I if G 2EPOdT ALABA!JA PoliER CottPA:lY .
FARLEY ?!UCLEAd POWER PLAliT AL-00246I9 3 2?TE..!B5h , 1980 JISCdad'3d 001 A: Oi!CE THROUGH COOLING - UrlIT 1
, aid FLod TE?tP *'
AVG
'tA X ---
d.III MGJ DEG F Fdda Co.iT 1/,iX i
1 43.62 2 47.37 3 44.d2 4 39.03 5 45.52 6 50.51 7 39.40 3 34.50 i 9 33.c5 *
- l 10 34.77 11 0.27 12 3o.39 13- 31.30 l 14 40.15 .
15 40.50 16 3c.07 17 40.64 13' 43.70 17 43.21 20 50.04 i t 21 4d.c0 l i 22 .3.97 l ?J 47.49 24 49.15 i i
25 43.44
-20 30.35 27 19.39 t i
20 14.44 33.47
?> 1 30 33.143 A f3 33.cl
'5!3;./.Tod5 of AiS?O;:313LE 0?.:' ICI. F ##M2/WA l Required for o June, July, and August only
[/ j l
-l 1
y 9 -'+
v yr -
' ~ "~ ~
. A f.' A 3 A 'i A M A i~E P Ili P R 0 V E ItE[ C h P '1 1 S S i 0 .'l D 1 S C H A R .G .E.. .. :LO li I T..a R I.R_.G. R E P Q R. ..T . .
....._ ALABA!.tA PohER CO' IPA:!Y ... . ... . . . _ _ _ _ ..
F ARLEY N'JCLEAR PD.iER PL ANT
... . .. . . _. _ _ _.. . . ._ _ A L- 0 0 2 4 6 1 9 _ _ ..... __ .._ . .. . . . ._ . . . . . . . . . . . . ._
0 3 T03E R , 1980 .
DISCHAM.1E 001A: UNCE T!iROUGM C00LI!!G - UNIT I 3 *.T _ FLO:: . T E!.i?.___ _ _ . . . . _ . _ . _ . . . . . . . .. . . . . . _ _ . . . . . . . . . . . . .
3yg _ _ _ . ___
g, x __ __
U. T - m'rDa D d' ^, _ .c . . . .
.: 3E0 CONT 1 /!1K
- 1 41.42. . . . . . . _ . . _ . . . . . _ . . _ . . _ . . . . . . _ . . . . , _ . . . . .
2 27.27 3 33.42 4 35.I5.. _ . . _ - _ _ . . . . _ _ . . . . _ _ _ . . . . . . _ . . . . . _ . . _ _ . . . . _ . . . . _ . . _ . . _ . . . _ .
5 33.71 6 36.11 7 38.01......_ . . . . . _ _ _ . . . . . _ . _ . . . . . . . . . _ . . . . . . _ . . . . . . . . . _ . . . . . . . . . . . .
8 35.I7 9 39. 88
!' l0 26.69.. _ . . _ . . . _ . . -
11 32.29 '
12 32.66 13 3 2 . 6 3 . _. . . . _ _._ . . _ _ _ _ . . . . . . _ . . _ . . . . _ _ . . . . . . . _ . _ . . _ . . . . ._..
14 32.23 15 32.38 16 32.21.. . ._ . _ _ . . . .. - _ _ . . ... . .
37.44 17 13 34.49 19 32.62 . . . . _ . . . _ . _ . . _ . _ . .. . . .
4I.29 ._.
- 2. 0 21 32.53 22 37.35 ._.
i 23 31.31 24 33.59 c ., 3,,._5 0 . . . _ . _ _ . . ... .. .
.! 26 35.13 j 27 34.72 23 38.65 . . . . . . . ..
].! 23.93 29 i 30 35.39 31 36.19 _ _ _ _ _ .. ._
i i AVJ 34.23
( l
._. i j
e.1.wis....U.o. _n 0F .o. r S.o. >:15 I .a. L c 0.0.:1CIAL . 1 c_-/ .__ m C. 6. M.n 7 ,
1 I
o June, July and August only.
1 1
1 J
/. '
- r. : "A : AT: i; 1 . ? '? O V R :' i~ " T 00 ..; '. ] 9 9 1 m .!
'. ) 1 3 0 .! ; l' GE P 0 ITU '! !"G 9 i P ') '! T
.+,.r..
. . ..- -. s-.,.. p ; p. ,., .
c,,. ) . . . ) .s. r . s. ,. s, F ARL'!Y 'nJCLE AR Por'iR PL/..iT
/.L-0024619 in) Y E; .M t , 1930 C15%l/.:?]E 001.t.: 090';i THi?OUGri 000Lli:0 - Ui!IT I UATE F Loi.' TEiiP *
,, ya
- A l/,
vs. . eAn. :,ce
.--J f
.i1- -
, . *3. a-.
.- ns) , q 1 1<t.nr, n 1 31.22
. .n... .o .
3 3').20 4 34.89 3 33.40 5 34.13 7 14.06
.w
. .v . t3o.
.) 23.96 l) 29.20 .
' 1I 27.47 . . . .
12 14.47 13 12.25 14 13.00 15 13.50 l '> 17.71 17 1l.91 1 .' 1i.15 l '.) 12.37 2 .) 10.53
.1 10. SU -
3 1.3..,.>.,
23 II.4S 21 17.3:
23 7.0c 2i J.91 2 '/ N . 00 P :.' 27.33 29 27.13 3 .) 22.t4
- i. ':r .') l . a .'.
l nn
.b . _b ..c L O
,ff'.
- g. } ( ". . . ' *.* ' ~. . i. ()[! j '.* q.. ') ; )'. . C. } .', [ *.*. O1J11 { C ]
. ...)._,/'_/,_',.,..,'. .
i ,-
l l
l 1
- June, July and August only ,
l l
% 1
-A L A 'B A M A' ti A T E R 1MPR0VEMENT C 0 M 11 I S S I O N DIS. CHARGE M0 NIT 0 RING HEPORT ..
ALABAMA PodER COMPANY- , , __
FARLEY NUCLEAR POWER PLAffT AL-0024619 ,._ , _ ,. . . , _ ,, _
DECEMBEh,Il980
~ ~ "~~
DISCHARGE 001A: ONCE THROUGH C00 LING' - UNIT 'l ~
DATE FLOM ' TEMP , ,. , .
AVG --- --
MAX --- --
UNIT MOD DEG F '
FRdo CONT 1/d K*
i 26.36 - .. . . ..
2 26.25 3 26.12 4 23.42 . . ..
5 27.08 6 25.52 i 7 26.11 . ,_ . ,. , , ,
8 18.47
} 26.35 9
- l. 10 22.59 . .. ,, , _
11 21.85 - -
- 5 12 20.15 i 13 19.18 "
l 14 15.11 i 15 21.64 .
16 20.69 17 21.04 10 21.45 19 19.37 20 20.12 21 17.13 22 17.83 .
23 19.13 24 15.44 25 20.08 26 20.58 27 21.45
! 28 20.02 l 29 20.43 ,
l- 30 22.45
! 31 22.90 4
> AVG 21.50 I
- I kM ([
8k
(
he - -
e h
~~. ur .u a ar ( ..
r ._
, l l
i l
l ATTAti! MENT II Cooling Tower Blowdown (DSN002)
N OTE: There were no thermal readings taken when the flow was zero. Som chlorine analyses were performed when the discharge flow was zero.
These readings were taken to insure that any subsequent discharges were in compliance with the NPDES permit.
e a , n.. ~ --. e+ -e w- we w- -w n -e o
. .o
, e..
A L A 3 A 14 A . 1 ATE 1 I 14 P R 0 V E r4 E 11 I C 0 M t.( 1 S S I O ;1 0 1 S C 11 A R G E e4 0 N I T o R I il G REP 0RT ALABAt.iA PorldR COMP.\NY FARLEY N'JCLEAR P0;sER PLANT AL-0024519 - - ' ' ' * ~
J AtidAt? Y , 1933 .
DISO-iAdGd 002 A C00LIflG TodER SLodDorlN - UNIT 1 .
~
DATE FLJJ T53!P pH CL FREE CL -
AVG -- ---
6-9 --
.2 e
.4AX --- --
6-9 --
.5 J s4I f H30 dig F S .U . :4G/L iAG/L
- FREJ 1/0At 1/WK(1) 1/nd 1/nX 1/aK 1 3.96 ~ - - - ' - * * ~' *
- 2 0.
3 0.
'<' O.10 < 0.1 *
,o 4 0.
5 2.40 6 5. /6 7 5. /6 e 8 2.13 78.1 0.1 9 1.92 8.20' < 0.10 .<
10 5.76 11 2. ll. ,
e ,-
12 0. .
13 1.6d - * - - - - -
14 0.
15 0.
Io 1.04 < 0.10 < 0 .1 17 5 .16 60.1 18 2.90 19 0. e - - -
20 3.20 8.16-21 5. /6 ~
22 3.42 23 2.04 /8 .1 o /.// < 0.10 < 0.1 24 2.dd e 25 O. .
26 0.
27 0.
2d 2.52 /S.1 /./8 29 3.05 30 0.
31 0.
AV3 2.03 7d 6 "I.93 < 0.10 < 0.1 SIG:lATJAd 0F RdSPONSIdLE OFFICIAL c~ O M e d G'
e e m er mee**oom=ee m b ** enesene s e e . m o essesyas,ee a s e me emme a se eswee m esa m e mmem em enie m e s e -=e emap= tmeee ens ee, eee eemm em-e ** ***ee* me - esme* - ew .
rr- e,, y , , y
l
$, L A B A .M A WATER I M P R 0 V E M E !! T C0MMISSIO N j .. ,. . _ . . .
,i . DISCHARGE M0y.. I T 0 R I t' G REPORT AL A3 AM A PC,tER CO'.'PAtiY FAHLEY !!UCLEAR Po?!ER PLANT . . . .
l AL-OO24619 I
l F E BH'J ARY , 1980 . . . . .
I 1
DISCHUiGE OO2A: COOLING ToriER BLOWDO i?! - Uf1IT 1
[
i DATE Flo el TEMP oH CL FREE CL AVG -- -- 6-9 -- .2 l '( AX 6-9 -- .5 UrlIT MGJ DEG F S.U. MG/L MG/L FREC 1/ DAY l /.1K ( 1 ) I/7h' I/WK 1/ViK' 1 O.
l 2 0.
i 3 O. . .
! 4 O.
t o 0.
1
! o O. . . . ... .
, 7 O.
5 O.
. 9 O- . .. -. .
10 O. .
J. 11 O.
12 O. . . . .. . .
- 13 0. .
.! l4 O.
I 15 O. -
i '6 O.
O.
i la 0.34 < 0.10 ~~
< 0.1
'7.76 19 3.24 77.0 20 2.25 21 5.76 . . .
22 3.46 23 I.92 24 5.76 . . . . . .
25 5.76 i 20 2.33 7.87
! 27 0. 66.9 < 0.10 < 0.1
- 25 3.54 i 2? 1.94 ,
I WG 1.26 72.0 7.82 < 0.10 < 0.1 SIG4ATURE 0 RESP E43 ISLE 0??ICI AL8M422 ,
= . . . . - . - - - - . . . . . - - . . . . . - . . ~ . . . . . - . . . . . - - - - .
. . . . ~ . . ..
, ALABAMA NATER IMPR0VEMENT C0MMISSION DISCHARGE M0 NIT 0 RING R E P.0 R T ALABAMA POWER COMPANY
. FARLEY NUCLEAR POWER PLANT _ _
AL-0024619 MARCH, 1980 , .;
DISCHARGE 002A: COOLING I'Or:ER BLOWDOWN - UNIT 1
~
DATE FLOW TEMP pH' CL ~ FREE CL AVO -- --
6--9 --
.2 MAX -- --
6--9 --
.5 UNIT MOD DEO F S.U. M0/L MG/L FRE0 1/ DAY 1/WK(1) 1/WK 1/WK 1/dK 1 0.
2 0.
3 0. .
4 0.
5 3.60 84.0 8.46 < 0.10 < 0.1 '
6 5.76 ~ ~
7 1.86 8 0.
9 4.38 '
10 5.76 86.0 8 .' 15 ' ,
11 2.61 , + -
12 2.42 . .. .~
< 0.10 < 0.1 .... . . . . .
14 2.67 .
15 O.
16 0.
17 2.60 8.10 < 0.10 < .0.1 18 3.36 ~' ' . ' '
19 3.58 81.9 20 5.76 21 2.88 , ,,
22 2.08 23 5.76 24 5.76 80.6 7.94 < 0.1 O_ < 0.1
- 25 2.32 ,
26 2.19 27 5.76 ,
28 2.08 29 0.
30 1.64 31 5.76 8.12 AVG 2.79 83.1 8.15 < 0.10 < 0.1 SIONATURE OF RESPONSIBLE OFFICI A'M/ > I aa 7 I
ATdd I Al P H 0 / d :4 d il I C 0 ;4 f4 I 3 $ 1 O lI
. A L A 3 A ..l A <t
~'
OIS03ARGd la o N IT0H I il G HdPOdT ALAdAMA POndR J0MPAllY FARLdY NUCLEAR PondH PLANT AL-0024619 AddIL, 1930 .
DISCHAdGd 002A COOLING Torldd oLO.iDoraN - UlilT 1 JA rd FLO,5 Td!4P pd CL Fdds CL A'/G --- ---
6-9 -- .2
.i A X --- -- 6-9 --- .5 Ur4 IT :.10 0 DdG F S.U. .4G/L 14G/L fad 2 1/0Af 1/nK(1) 1/ ,6 K 1/nK 1/riK i 3.04 'd.1 2 3.64 < 0.10 < 0.1 3 5. 15 4 2.5d 5 0.
o 0.d2 7 5.7o 6 a.00 Y 0.
< 0.10 < 0.1 10 2.3d 11 1. /6 79.0 7.65 - -
12 0.
, 13 2.46 la 5.1o 66.0 7.69 1a J .05
< 0.10 < 0.1 16 0.
17 0.
Io 0.
lY 0.
20 0, 21 3.13 d2.9 7.Yd 22 3.2d 23 2.40 < 0.10 < 0.1 24 5.7o 25 2.Vo 2o J.
27 2.20 26 5.lo < 0.10 < 0 .1
, 2Y 5.7o i 30 3.17 31.V 0.18 i
t Av3 2.50 73.0 7.93 < 0.10 < 0.1
- I . ka d 1
m j
ALAdAAA .s A T E A I e,i P R u 1 E ra d N f C 0 la :4IS$103 0ISCdARGE ta 0 tl I T U k IN3 dEPOdT ALAdA,dA PO,tEd C0aPANY FARLdY NUCLEAR PonEd PLANT AL-0024619 rA A ( , 19d0 0ISCHAdGd 002A COGi_ I tlG ra,1dR BLuno::.itt - UN Ir i DATd FLO. Td:4P pH CL' FREE CL AVG --- -- 6 -9 --
.2 t4 A4 -- --
6-9 --
.5 ,
Vil li :4JJ DEG F S.U. MG/L olG/L FRED 1/0Af 1/,1.<(I) I /,t:( 1/uK 1/dK I 1, 12 2 2.>d 3 0.
4 3.39
- 5 4.66 6 2.2d < 0.10 < 0.1 7 3.16 d4.0 8.01 6 0.
Y 0.
10 1.12 11 5. lo . -
12 3.14 13 0. < 0.10 < 0 .1 14 1.20 86.0 8.24 15 2.2d 16 -5.52 11 2.dd Id O.
1Y 0.06 20 0.
21 2.40 34.2 8.20 < 0.10 < 0.1 22 3. 16 2a 3. 10 24 U.
23 I. 14 20 2.16 d4.9 8.26 2/ 3.04 < 0.10 < 0.1 2e I.96 2V 2.36 10 2.52 31 0.
AVG 2.14 d4.8 8.19 < 0.10' < 0.1 e
'6 e n
- r/ *Y i
I.
, - - . , _ , . - -, . . - , - - .m,,-- a m- , , , , . - . . , .-
l
- g PRplY l:. lidu F Tril 5!:0A5?F ?L EHNYFf IS I*L > 01'u > ol*P O'6F f / *U C/. Y
- O Cf
- O 62
- C F2
- O LE
- G 02
- C 9P
- O t2
- O E2
- O 2E
- C. 12
'O DE
- C 61 O ci
- O ll
- C T' l
- O 91
- C. ?!
- O Cl .
.- , *O 21 1 I O
- E' II I'O > 01*O > EO*G 0*9F OL*2 Cl O f.
- I (
9L*9 0 V6*2 L CL*l 9 CE*G 6*l6 CE*F 9 cl*l p l'0 > Ol'O > E2*2 0
'O 2
- O I
< "/ l
' >l u / l St'/ l '
(l),M/* ).YO/l LFF?
'l/Li; ~1/01 'G*S ? O?G CO'e lli D c* --
6-9 --- ---
YYi 2* ---
6-9 --- ---
O/.Y 70 . :E5 10 pd a;;,= j stel? F,7 v c I IIr:0 - P"OGu.079 F3DOJ O!!I'1000 :Y200 :DFW.' SIC 0961 'Or?r 61972CG-lY JJ'Yld MFund FY.:1 0 fu! A ? l)IY ?
).I M 00 F.EO? Yi!YEY~lY 1 F 0 A .: F L '- I F G l I f. O n EOH Y i D5 i r ,
Yr Y E 'v 7Y
- f. O I F 5 I 1l r, 0- 0 .T !J ? W E /. O N dn I F ?IY" ,
A'L A 3 A .4 A is A T d R I e4 P R 0 V d A d N T C0A:4 I S 5 I O c1
'd I S O cl A d J E I4 0 N I T d R I 14 0 R2POdT ALABA/4A PondR COMPA:lY FARLEY UUCLEAd PunEd PLANT
\L-00246I9 JJLY, 19d0 ,
DIS 0 dad 3d 002A CJOLING TJnER eL0dDO.td - UN IT I OATE Floa I dAP pd OL FR d5 OL AVJ --- -- 6 -9 ---
.2 AAX -- --- 6-9 --
.5 UtlIT .400 OdG F- S .U . .4G/L t.iG/L
- Rd] I/JAf 1/aK(1) 1/HK 1/nK 1/dK i 0.
2 0.
3 0. '
4 0.
5 O.
o 0.
7 O.
3 0.
V 0. ,
, 10 d. ~'
11 0. /l.4 7.80 < 0.10 < 0. 'l 12 0, 13 1.14 '
14 8.40 16 8.40 to d.40 ,
17 d.40 Y0.0 8.2I Did not chlorinate 18 d .40 iV d .40 20 d.4J 21 5.76 dd.0 8.21 Did not chlorinate 22 5. 76 23 S.7o 24 5.7o 25 5.75 2o 5 . 76
'21 5. 10 24 5.76 33.0 8.64 2V 1.30 30 0.
31 J.
AVO 3.48 39.3 d.22 < 0.10 < 0.1 SIJiATJ.<d JF dd5PO.lSIBLd 0FFICI N g d / I M h
&/
.(
A L A d A .4 A 'aATER I r4 P. R 0 V E .4 E il T C 0 la to I S S I 0. 1 0 I 5 0 ri A d G E la u il I T o R I ti G RdPOAT ALAS At4A PoadR C0:4PAliY FARLdY NUCLEAR P0aER PLAffT AL--0024619 AJ30Sr. 1980 JISCHAd0d 002A: 000LIriG fodER BlodDonti - UtIIT I UATd FLJo f d.49 pd CL FREE CL A fd -- ---
6-9 --
.2
- 4 A ( ---
6-9 --
.5 J.41 T l400 OEG F S.U. A0/ L I4G/ L FRc0 t/ DAY 1/aK(1) I/dK !/,vX 1/dK 1 0.04 2 0. < 0.10 < 0.1 3 1.22 4 2.42 S 3.16 93.0 8.33 < 0.10 < 0.1 6 3.36 7 0.30 5.13 6
Y 4 .2 d 10 5.7o ' '
i 11 5.7o 12 5 . 16 95.0 8.21 Did not chlorinate 13 5 .16 .
14 5.7o
- 15 3.07 <
lo 0.
17 0.
16 0. 8.o7 < 0.10 < 0.1 19 0.
20 0. '
21 0.
22 0.65 97.0 23 3.10 24 2.1/
25 2.26 20 4.00 d3.0 8.24 < 0.10 < 0 .1 27 6.43 2e 6.46 29 2.34 30 0.
31 0.
AVO 2.5 / /2.0 d.36 < 0.10 < 0.1 Sid.lA fd ni 0.= Ri5PariSloLi 0FFI 'i'W?SSW '
C7
(
kL A. - B A 4 A ~ AYEH
.# I h P R 0 V E .'! E :1 T C 0 M :i I S S l 'O :I
.1 I S C H A A G E ?! 0 :I I T U R I .I 3 2EPOaT ALA3A?tA 90.lER COMPA!!Y FARLdY ,fiUCLEAR PCs.'ER PLArIT AL-O'J24619 SdPT3.!Edii, 1930 JISC.iAdGd 002A: COOLIilG TOWEi4 3Loii30,; ! - UtiIT 1 DAri FLD,1 FEMP pH CL FREE CL Aya ___ _ _ _ .
6-9 - - - -
.1 (AX --- -- 6-9 --
.5 V'ilT 10 3 U5G F S.U. "G/L
. MG/L I
?:25 0 1/ DA ( l /...;( l ) 1/iis i//is 1/.t.;
I 0.
2 0. .
3 0.
4 1.72 39.0 3.20 < 0.10 < 0.1 5 3.00 6 0. -
7 0.
3 3.25 90.0 S.85 < 0.10 < 0.1 9
- 5.7o 10 3.20 e
- II i.02 12 2.93 .
13 1.06 14 5.76 15 1.63 dd.0 3.69 0.1 10 C. < 0.10 <
17 0.
16 0.
19 0.
20 6.70 21 5.7o
?2 6.73 *
?3 5.70 2; 2.5, 34.9 3.17 < 0.10 < 0.I 25 O.
26 7.
27 0.
?3 1.43 2; 3.40 dd.0 5.24 .
30 0.97 < 0.10 < 0.1 A'/G 2. D 33 . 0 3.43 < 0.10 < 0.I S IT. ATUdd Of aiS'co!l3 I BLE 0;F I C *M2_4_U/M.d-
~
A L A .? A 1 A 'i A T E P
. I ;t P R 0 V E li 3 '! T C 0 v. :4 I s s ' y :) it -
DI S C 11 A R G S 4O' NIT.0 RIdiG '4 5 P O o - T - -.
.~ AL AbM4 Pai;liR CO:.iP A;tY . . . - . - - - .
FARLEY NUCLEAR PoilER PLANT
. ..-_ .. AL- 002 4 6 I 9 .. . _ . . .._ . _ . _ . . . . _ . . . . . . . . . . . . _ _
00T033R, 1930 DISC.iAffGd 032A: C0JLING fo.lER 3 Lor:DO:-!N - Ul;IT 1 J ,.. ...
i .; rLO..... T ,.c.3 , ,7. .-. . . - p 1.. _ .. .. . .
,v., L . . F R .,_.r,; ~, L . . ...~. ... _.. ..... .-... .
AVO --- ---
9 --
.2 L'. A'i --- ---
6-9 ---
.5 '
U.17 :.;GD DEG F _
S.U. _
MG/L -
l4G/L . . . . , .
FRE7 1/7AY IMS'(1). 1/ id 1/'lKi 1/'clK 1 2. 2.3 . _. . . - . . . - . . . _. _ . . _ . . . . . . . . . .
2 0.
3 1.23 4 C. .. .... .. . _ . . . . . . . _. . _ . _ _ _ . .. . . . . . . .
5 3.43 6 3.45 52.9 S.48
.7 1.12 . . . _ _ .. _. . . <. . . O.10 < . O .1 . . . .
3 3.36 9 .
4.02 10 5.76 . . . . . . _ . . .. . . . . _ ..._. _ _ . . . . . _ . _ . . _ . . . . . . . . . . . . . _ _ ...
11 5.76 12 5.76 --
13 5.76 . . . _ . . . . . . _ . _ . . _ _ . . . . . . . . . . . _ . . _ .. _. . . _ . . . . . . _ . . . . _ . . _
14 5.76 80.1 8.23 15 5.76 16 4.63 .. .. ._ . . .. . .. .. ..
17 0.
13 2.76 < 0.10 < 0.1 19 5.76 ~
~~
3.25
'i9.0 20 2.01 21 2.04 < 0.17 < C.1 22 4.87 ... . . . ..
23 0.62 24 5.76 25 5.76 . .
26 5.76 27 4.34 B3.0 3.I2 2? l.02 . ..< . 0.10. < 0.1 l 29 2.02 ;
30 O. ,
31 0. . . . . . . . ... .
1 A V3 ~ 3.30 81.2 8.27 < 0.10 < 0.1 l sIonTuu .)F aspa::sIBLE OFFICI AL .g W _- rC.9Maged l
l
. _ . . . . . . . . . . , , . . j
- I
r.
. .,, , ? o .> : ,.. .: : uu . .. . . . . , , . . .
a e. . .. es 3 .: 1 .
DI3C:. .'s 909 '- 0 : ! I f) RI: 0 R P -) RT 4.# .s a s),. g .. .::
g ,.
.*s 3
Ik ..s s.i r. .. . ;
- f.) s ". ... c e :
. >l .r*i.T.
~
.J ./.m. . s.f. :. y 6 . dv e ' '..f.t. t.. ?) p() o.';* ....!)
< AL-7J215I9-
. . q. . : . 3. .:. ,,
, 1 e.p.>. 3
.>! C:.". ? UE 702 A : ';03Ll'!O Tr)"ER BLorno.1" - 041 .
1
- : , a.. .,i wi,.,
. E.c. c,c
....s
..~... m .) ...
A_ s ___ .,y_
- g ,:n __- __
___ ___ 5_9 _. , t;
'. ;, ;' ra. n., . . ...o, ,, r .,cf /L
. , . . ., . - .n> .n. . >. e.n .t: .
I //::'. 1 /, t.<
f : .! ~ l /'. A Y I /cM i ) I /::/,
l l
I ?.
2 2.20 .
3 1 . '2 2 ' .
.a. 7. .
79.0 ?.30 < 0.10 < 0.1 3
',) ..>'O
. . .i ,.m,
. o 3 5.76
- 0.04
! 1.; I.w c II Oe 1-d I .o . * .
t 1.3 ,.
1 0.
is 0.
! l ?, 3.
I7 .) .
I> ).
l '.! 0.
- 2) 9. '
l .'! l 0.
.>.<. n. . .
2.i 7.
2.: " ...
22 0.
.).
Ti J.
,i ,.
l' n. ,> .
- 0. ,. 3 h
0.17 < ') . 1
/7
. o f.' 70.-) 3.38 <
I. ,. ., v ma ,, *
~-
) , .s..
, , . _L__/__..
,_I.._
V
. A, ' f. ef.
c' '. y ; = .'*;) .; :. t } p m. .;. c. '.): y. , q ?. * ~* .: ' 1:L; } . -} ;,[.
. , . ' , . . , - . . , , ' ,. _ - * . '.. *i
_ t ,
A 6
-i e
e
.l ._
. . . . . .. . . . . . .. c . . . . ....a J ... e
,e s y u m m sl s_ s 1 0u '
DISCHARGE M0N1T0 RING REPORT 4 ... . .- - . . .
ALABAl4A P0/IER COMPANY
~~ ~ ~ ' "" ' '
'FARL'EI NUCCEAR POWER PLANT ~
AL-00246I9 .
. . - - . . . . . . . . . . ._..e. i DISCHARGE 002A: COOLING T0/IER BL0 TID 0/IN - UNIT I DATE FLori TEMP pH CL FREE CL AVG 6-9~~^ ---
~ ~ ~~ .2 " ' ~ ~
MAX -- --
6-9 ---
.5
' ~
UNIT MOD DEG F S.U. MG/L MG/L FREO 1/ DAY 1/WX(1) 1/dX 1/l'iK 1/.1K ..
1 0.
2 0. ,
'~
3
~
- ' ^ ^
- 0. '
4 0. ,
5 O. - . . . .
7 0.
8 0.
. ~ . . ... . . . . .
10 02 11 0. '
12 0. ,
13 0.
- 14 0. ~ ~~
~ ~ ~ ~'
15 0. ~ ~ ~
16 0.
17 0. '
18 0.
~ ~ ~
19 0.
20 0.
21 0. -
22 0.
23 0.
24 0. '
25 O.
26 0.
- 27 0. '
28 0.
29 0.
\
30 0. ~
31 0. .
AVG No DISCHARGE t
./ , '
[
-_ , 9 h As=y u 4
- 4e 4 ew. e .. e
, _ . . . p_., .--y
l' i
t i
ATTACHMENT III ,
Turbine Building Sump .
(DSN.004) t =
e t
I i
s 1
4 A
f 1
J b
h I
I
+
h I
I I i l
n .
I 4
. - - - - - v - r e-e-, ,v, -- , - - v e .c,wv.m w- . e- .-w e- - ~ , . . - . . , -n-. - ,- r r .v r- ~
- ~ -- - - -
- ALADAMA POWER COMPAlly
?
600 NORTH 16TH STREET - P. O. Son 2541
. SIRMINCHAM. ALABAM A 35291 - . (205) 323 5341-I
. February 15, 1980 i Mr. Jarras W. Warr, Chief '
Alabama Water Improvement Comission -
Perry Hill Office Park
3815 Interstate Court liontgomery, Alabama 36100
- j
Dear fir. Warr:
Re: Farley Nuclear Plant .
tiPDES Permit No. ALOO24619 s In accordance with Part II.A.E'of the referenced pennit, we are submitting a non-compliance report'for violations which occurred at the referenced plant. On February 3, 1980, 25,320 gallons of waterAnwere -
discharged from the turbine building sump, discharge point 004A. .
analysis of the water for oil and grease gave a concentration of 0.092-
' ppm; however, the concentration was actually' 92 ppm. This error occurred
-e because the equation used for calculating'the oil and grease was misread. '
To help prevent the recurrence of this error, the procedure used to calculate the oil and gmase concentration has been revised.
The steam generator blowdown, discharge point 003A, was found [
by an analysis performed on February 5,1980, to have a copper concentration of 1.74 ppm. This non-compliance was caused by oxygen leaking into the system. This oxygen, along with the amonia in the.
steam generator, produced a corrosive effect on the copper piping.
Steps are underway to reduce leakage of oxygen into the system.
If you have any questions, please contact re. . . .
' Yours ver truly, l.
' A' 'Q
' . Arno d, unager t *
// Terry Envi ronman,t and Research Services j
\
FVB/y bec: fir. R. P. ficDonal d Mr. H. O. Thrash ,
Mr. O. D. Kingsley .
fir. W. f t. Jackson lie. Rod Baine lir. F. V. Brown -
File: T(7) 1306 /
t
('
' ,' Allbams Pow.c Comptny !
600 North 18th Stroct Post Office Box 2541 - i Birmingham. Alabama 35291 T.i.pnon. 20s a23-534:
E1 -
A!abamaPower
. she sod,wn electric systom August 12, 1980 ' [;
4
./ {
Farley ttuclear Plant *
?PDES Permit ib. AL0024619 ,
Mr. J . P . Martin -
Alabama Water Improvement Commission .
Perry Hill Office Park . ,' , ,
3815 Interstate Court - -
Montgomery, Alabama 36109
Dear Mr. Martin:
i
! 'During the period of July 29 through August 1,1980, we
' reported violations of the oil and grease concentration limitations j, for the turbine building' sump (discharge serial number 004).for the referenced permit. These oil and grease violations were' thought to have occurred when an EHC fluid line ruptured. EHC fluid is a man-i made triaryl phosphate ester which analyres as oil and grease. When samples were analyzed by the plant laboratory, the analyses indicated a violation of the oil and grease concentration limitation. However, when 1 the samples were later analyzed by a commercial laboratory and by the '
Company's central testing laboratory, doubts were raised as to whether ,
these violations actually occurred. The sequence of events surrounding t
, these reported violations are given below:
At approximately 1030 on July 29, 1980, an EHC . fluid line to ,
- the main turbine #4 governor valve ruptured spilling fluid onto the
- turbine and the floors under the turbine including the turbine building basement. Since it was assumed that some of the fluid had or would ultimately flow into the sumps, the sumps' discharge valves were closed . The sumps were almost full just prior to the rupturing of the '
EHC fluid line. Following the EHC fluid line rupture the reactor '
tripped, and the 68 high pressure feedwater heater (water side) relief valve lif ted discharging an excessive amount of feedwater to the sumps.
The sumps overflowed and the turbine building basement ultimately became i covered with water to an average depth of four inches. The water level ,
was threatening to reach electrical equipment such that a serious personnel and equipment safety hazard developed. Since the influent could not be -
stopped at that time, discharge of the waste water was necessary to alleviate the safety hazard. To help niinimize the impact of this discharge, ,
the flow was directed through an oil separator. However, we later determined that the fluid was heavier than water and the separator would e
. - - , ~ . , , , ,
1
{ . ,
Mr. J. P. Martin -
Page 2
- August 12, 1980 ,
not have removed it. The flow was left in this configuration in case.
- any of the water contained any " natural" oil and grease. .While the -
waste water was being directed through the oil separator, the discharge' was released to the environment through a stonn drain instead of through -
the normal discharge point.
The reason this violation was reported was that analyses performed by the plant laboratory was apparently. in error because of -
contaminated solvents used in the extraction. Values obtained from the.
Company's central test laboratory and the Polyengineering laboratory S.' will be used for reporting ' purposes. The values obtained by these laboratories gave concentrations which were within the concentration limit. However, the pounds per day limitation was , exceeded.
To investigate the environmental impact of any EHC fluid which might have reached the environment, the Company's biologist investigated the discharges at Farley to determine if any environmental impact occurred. !b stresses on the environment were observed.
If you have any questions, please contact us.
- . Verf truly,yours, . .
& ./ & ! ! MM3 nager-
~ C. Bi ddinger ,11 ,
f Environmental,and45 search services FVB:y b
j e
l a
-,y --7 . -
e
'A L A S A .t A A A T E R ' ,1 Al P R 0 V E .4 E' N T C 0 14 ':.1 1. S S I o N DISCHARGE l4 0 N 1 T U R I N'G REPOHT -
r AL AS A.'.l A P0nER 00I.!tMNY FARLEY NUCLEAR PO.iER PLA iT ,
AL-0024619 - -
JAfiJAR(, 19$0 .
. e DISCHARGE 004A: TJd:sl:ld BUILDI lG sui.t? - U:!IT I DATE FLun pH - TSS 3&G A '/J --
6-9 6.3 3.1 -
i.! A X --
6-9 20.9 4.2 diilT MGJ S.U. -
PPD PPD FAE2 1/,1)( 1/aK 1/aK 1/ n .<
2 '
3 4
5 6
I 8 0.0164 6.65 1.23 1.80 V
go .' ,
11 <
^
.. I2 '
13 : '- -
14 0.0211 7.49 0.53 1.02 .
15 16 1.7 la 19 20 21 ~~
22 0.0164 1.81 0.41 0.22 23 24 ,
25 -
26 27 26 0.0143 7.60 0.25 29 30 31 AVG 0.01 /1 /.49 0.50 0.97
' SIG.lATJR2 OP RdSt>0:lSIBLE OFFICI ALMhMI f .-
/
. ~ .. .
~
k, L A d A .4 A Fl A T E R I !4 P - R 0 V E la E N T C 0 i4.4 1 S S .I o cf DISCHARGE 14 0 N I T 0 R I N G R-E P O R T - - -
- ALABAidA PO<iER CO:4/ A:lY f
FARLdY tlUCLEAR PariER PLAriT AL-0024619 - - -
. s FEBRUA.<Y, 19-33 JISCelAd3d '}94A TUr?JI.id 33ILDI:lO SU.>.tP - U:!IT I ,
JATd FLO.i pH TSS 0&G l 'y 3 ---
0-9
- 6.3 3.1
- .i A X ---
5-9 20.9- 4.2
>J.ll T ..l JJ 3.0. P/0 PPD F.4 d3 l/od I /uiK 1/nK 1/s,K 1 . ._ . .. . . .
2 3 0.0263 19.41 4 , .
5 0.016:3 1. '/ d 5.05 3.46 b *
{ . .. . . .
b 9 Ji .
10 - - . . . - -
, 1i U.013/ l.14 < 0.11 0.35 .
12 l3 l .; .
15 16 -
17 IB
- 19 . ..
20 0.0168 7. 82 1.82 2.14 21
- 22 -
23 24 25 - -
20 0.0169 b.98 1.27 0.86 '
21 2d 29
.WG ).01/> 7.43 2.29 5.25 SIC.i ATU 4d UF RES?o;!S ISLE OFFIC I A'M<' M# -
7 /
M e
e y gg m g 4 M .EWh @h
- 5 M sW 6.D.4 e d* g6.Dem> g i ge m ge e ,$u yp w peg W m geig pgey ge MM% m i e,N SE *W ye..ggum dus pe'IpgD't iWge9 M M .M M M m eg s g egg o gd. eM .e %--
, 1 ALABAMA WATER IMPR0VEMENT. C 0 M M I S S.I o N DISCHARGE M0 NIT 0RINO . REPQRT ALA8AMA PoriER COMPANY
, . FARLEY. NUCLEAR PodER PLANT ..
AL-0024619 MARCH, 1980 DISCHARGE 004A: TURSINE BUILDING SUMP - UNIT 1 DATE FLod pH "TSS O & G' AVG ---
6-9 6.3 3.1 MAX -- 6-9 20.9 4.2 UNIT MGD S.U. PPD PPD FREO 1/tiK I/dK I/WK 1/WK 1 .
2 t 3 .
4 5 . 0.0162 8.13 1.08 0.84 6, . .
8 9 ~~
10 0.0211 ~ ~~'6.93 l' . 0'6 0.74 . -
.Ii 12 '" ~ * ~
13 .
14 15 16 17 0.0190 6.70 0.95 0.95 18 -
ip 20 21 22 23 24 0.02.l! 6.84 1.41 0.85 25 26 27 28 29 30 31 0.0109 8.33 0.7'3 0.62 AVG 0.0177 7.39 1.05 0.80 SIGNATURE OF RESPONSIBLE OFFICI AL ML2M e /
.....m.e..e e- . 4 m - == m e e . ..,............,c........... ...,,% .m*w.w.... ..m . . . . . _,.% .
A L A S A .4 A 4 ATdd IM r) R 0 V d .4 d N f C 0 !4 14 I 5 - S I O (4 0I5CdAdG6 t4 o N I T0H ING 'R d P G A T ALAB Al4A P0.iEH COMP A;1Y FAdLdY (1UCLEAR PonER PLAi4T AL-0024619 P
AddIL, 1/d0 OISCHAr<GE 004 A
- TUddit4d SUILUING SU!4P - Ui4IT I UATE F LJ.1 pH TSS 0&G AVG ---
o-9 6.3 3.1 4AX --
6-9 20.9 4.2 di4 ! T c4Gd 5.0. PPD PP D F Rt:0 1/. K 1/evK 1/,i t( 1/nK i . ,
2 3
4 b .
6 7 0.0464 7.01 4.26 2.05 6
9 '
1O ,
II 12 13 '
14 lo 16 0.015d 1.15 0.79 0.86 17 18
'lY 20 21 22 ,
23 0.0232 6.69 7.94 2.19 24 25 2o 21 2d 29 30 AvJ 0.0235 7.02 4.33 1.70 i
SIGi1 ATJr(d 0F ddSPo!1SIBL5 0F:ICI ALN A&/I u
A L A b A .4 A et - A . i E d I' ,! P n 0 /dM E il T 0 0 id ;4 I 3 $ I O cl 0 I S O :i A n V d to a ta IT0d INO ddPOdT ALAB A,4 A F0.4 dk 00!49 AtiY FARLdY flUOLdAd P0ai:R PLA.4f AL-002441V
- .t A Y , 1960 UISoriAdGd 004A TdHdINE ddILOIfic SUld - UNIT I UATd FLO,4 pri TSS 0&G AVG - - -
6-9 6.3 3.1 14 AX --
6-9 20.9 4.2
'JN I f ;400 S.U. PPD PPD Fdco 1/aK 1/nX 1/dK 1/ . ,X l 0.0232 8.57 0.97 0.74 2
3 4
5 o '
7 0.01/0 7.00 0.32 0.o3 6
9 iO . . . . . _ _
1i - -
12 13 0.0211 7.96 1.5d 0.83 14 to lo 17 18 IV 0.01V0 7.35 0.63 0.29 20 21 22 <
23 I 24 l 25 I 0.70 20 0.0211 7. d7 0.37 27 i 2d 29 30 31 1
AVO J.02J7 7.75 0.d4 0.57 l 1
51 J.4 Af Jd d JF Rd5FU.4SISLd UFF IC I ALdf .= L- M M </ ' l
)
. j 1
,. . . _ . . _ _ _ _ _ ____1
, A l'>A 1A .e Asih I ?d O 'V E a ii i f .: 1 ' t '.* I S. i Ian O I S C !! A .- G E. 'A 0 .: If1AI;3 a d e 4 :t T ALA.l A.tA ro.;jit 00Mr A iY
?Ai1 LEY TJCLEAd ' v0<.d:<r' L/JiT AL-0724619 J a ':d . li3n .
JI30.iA.RG i 004 1.s TURBI?id SUILDIt!q SU:.ie 'Ji;IT I
'JAf2 ? LO.i oH' TSS 0&G AVG -- 6-9 6.3 3.1 iA /, 6-9 20.9 4. 2' O.JIT aG) 5.U. PPD PP3
/ddO 1 / . . f. 1/.t K 1/tts 1/. X 1
2 0.0141 7.46 0.J7 0.20 3
.i o
o 7
V 0.:1211 7.35 1.06 0.90
_ . .l. ') ,
11 C 12 13 14 .
10 lu 17 li 19 0.0119 7.15 0.95 1.39-20 21
.n.
23 0.U179 6.37 0.97 0.25 24 s-
-i .o
- 20 27
.o. n,
- 3. 9
- 30 7.' lod o.30 2.24 1.41 A/G 0.217; 7.03 1.10 7.43 31 3
- :/. l...5 16 a dS PO:is ;L.i 0 ?? II/ L W e 4 M M
.e _/
1 I
i I
e
A L A 3 A .4 A .t ATdd I at P R 0 V d 14 i !i T C 0 la ;4 I 5 S I O .1 O I S C :i A H G E i4011 IT0 KING R.d P O d T ALAB A?4A Purid2 001.iPAdY FARLEY !!UCLEAd PONER PLAi1T AL-0024619 JJLf, 1930 OISCHAdGd 004A: TJRdI?id du1LDIllG SUMP - UilIT 1 .
JATE FLJ,8 pH TSS 0&G A v~G --
o-9 6.3 3.I ldAX ---
6-V 20.1 4.2 UdIT .400 S .U . PPD PPD fad 3 1/.44 1/.iX 1/ ,1K 1/nX
~ ,
i 2
3 4
5 6
/ 0.0190 o.99 0.32 < 0.16 6
9 10 . .
Il '
12 ,
13 14 0.0190 d.10 0.32 0.17 15 to 17 10 .,
19 20 21 j. 7.91 0.3o 0.22 22 23 24 25 20 27 26 0.J200 7.u3 0.11 < 0.17 2Y 30 31 A /O 0.J146 7./l 0.23 < J.12 SI 3 4 ATJ <d JF d dSPoliS I SLs O PF I J I r.d2 N/M es
4 A L A B A .4 A si-A I E H I 14 P R 0 VE:4 daT C0:4:41S5IO:I JfSOdAdGE I.i 0 ff I T d R I N G AEPOdT ALAdA4A PodER Coi49AdY FARLEY t4UCLEAd ?0Hdd PLAtiT AL-0024619 P AJGUST, 1930 OISCHAdGd 004A: TJadI.fE SUILDIllG SUt4P - UtilT I JATd Flus pH TSS a&G AVG * ---
6-9 6.3 3.1
. 34 AX --
6-9 20.9 4.2 U.l IT 44 0 ) S.U. PPD PPD Fdd3 1/.M 1/,1K 1/,1K 1/uK i
2 3
4 5
0 7
6 0.0153 d.20 0.26 < 0.13 9
10 - -
, ,3 12 0.0211 7.73 0.70 < 0.18 13 -
14 to lo 17 18 0.0232 d.32 0 39 < 0.19 19 20 21 22.
23 24 23 J.0215 d.44 0.16 < 0.13 2o 27 26 29 30 31 i
AV3 0.J234 d.17 0.33 < J.I7 l
SI'MAIJdd JF Rd5PO.lSI Ls UF?!01 #2 D[.4d' ,M 1
1
A L A E A li A ii A T E R I 't P R 0 V E .'3 E 'rl I C 0 1." I S S I O !!
) I 5 C ;i A d G E M 3 if I T U .4 I ;! G dEPOnT -
ALA3 A.'IA PO!lER CO'. IPA?!Y FARLEY !!UCLEAR 90/.ER PLA:IT AL-0024619 ,
53?Td!SEn, 1930 J ISC.i AdOd 00, A : TUR'31.id SUILJI!!G SU .ld - -J.MIT l C ald ? LO.i pH TSS 3 !. G A 5/G 6-9 6.3 3.l
.tAA ---
6-9 20.9 4.2 JIIT MGD S.U. PPD PPD
/.id0 I /.l.: 1/.iX 1/.!K 1/nK I 0.0042 d.02 0.04 < 0.04 2
3 4
5 o
7 5 0.0137 a.60 0.57 < 0.ll
? . .
l 10 ll 12 13 14 15 0.0100 7.91 0.79 < 0.16 lo 17 .
IS 19 20 21 22 0.0127 l.95 0.11 < 0.11 23 22
,a c
2J /
27 2:
27 0.0170 7.10 0.32 < C.16 30 WO J.0137 3.00 0.3o < 7.11 3 I li AI";;,3 0? J.'iS?O is I :L2 0F?IOW [ # <dE - -
A 1.,A 3 A :.1 A i. A, T R f M P R t) '/ E 1 E !? T C 0 M 'i l S S I O .'l
, - D I S C ii A R ri :: - -4 0 :1 1 T O R I N G- 4EPQRT -
AL AGANA PO?!!!R Col.iP Al1Y -
FA2L'iY r!UCLEAR PO?!EP PLANT .
. . . . . . AL -- 002 4 61 9..... ... .. . . . . . . . . . . . . . .
0 'T.~0 3 ? :! , 2.930 '
DISCdt.RJJ 004;: FUR 3 I N E 3 U II.01 'G SU.'. P
'JN I T I CAi: t- LO.. oH.. . .TSS ....0 4 G... .... .... . . . . . .. __
AVJ ---
6-7 6.3 3.1
- .i A X ---
6-9 20.9 4.2 U:lli "GD
. 5.U. PP D.. PPD . . .. . _ .
F.7E1 1/v;K 1/ ,1K 1/'llK 1/?!K .
1 ..
2 3
4 ... ... . . . . . . _ . _ _ _ . . . . . . . . ._ . .
o 6 U.0127 3.09 0.32 < 0.11 7 . . .
n 9
10 . . . .. . . . _ . . _ . . .. . . . _ _ . . . . . . . . . .. . . .
Il 12 3.0200 8.07 O.33 < 0.17 - '
13
~
l .,.
15 .
16 17 IS 19 . . . . . . . - . _ .
20 0.0211 S.31 0.18 < 0.13 21 22 23 ~
24 -
26 ..
2n >. D2 I I S.07 . 1.23 < 0.18 27 c.
,s. ,# -
30 31 AVJ 0. 017i7 8.13 0.52 < 3.16 SI L.MTUPE .;F R.iSPa.!S13LE OFF ICI AL QI g ' A rr' S C G i k tr le.
A L / f,/- li A '" A T ?. !! I . ' P R n ' V E 2 '. E T C0 " !' ISSIo>
D I 5 C !. A :1 0 5 't o !! I T o !? I"G R -i P ') DT ALA3 A*c;/, Po.!:.!;? C0;DA !'I FARLE f "UCLE/.R .Por 0 PL/.':T
/.L-0021619 "O '/ 'l ' J Ef l , 1900
- > I S : ;.( 0
- 3 0 ') .',/, : TUL',I'I3 30 I LDI "O SU"P J:1IT - 1 JAW 6: Lor: o;i TSS 0&G A VO --- f:-0 6.3 3.1 y 6-9 a0.9 4.2-
>.. .r - . . .n. .n.. e.u.
- .p><. .)
.n.a 9 F2 '10 1/it i //: I n'!( l /e ll'.
I 3
4 J . 01 G 3.21 0.12 < 0.12 6
6 1
3
'> 0.02il !! . 21 1.23 < 0.10 I ') . ..
. 11 12 1a, 14 IS 15 17 0.,?l10 7.57 1.76 < l.75 IJ l I? '
.o s, 1 m, i
[e 22 l 1
25 j 2' O.?l F3 7.91 0.25 < 0.12 i 2.5 I 2.,
-s
- c. I-
? *5 .
2 .'!
SJ .
. a, /' C . 0 6 3.'. 7 . 9 ff C.84 < C.33 1 l
l 1
1
. . I' 'l. 9 ..
l 1 L'asw* f ns
- * ,1
- n',) * !:. y. t ?. f ; t.' .) *, os
- t .t', f .'s T '.:. (s.t:0 [vt'f l l. ,w. . , . , f.g* y , . ,_ w _
r G l,.y ). ,*, < g .* \ " (. .
4, , . -
(
U l
l 1
A L A'.B A M A W A.T E R IMPROVEMENT C 0 M l.L I S S I 0 N DISCHARGE M0N1T0 RING REP 0RT ,
ALABAMA P0/IER COMPANY ,
FARLEY NUCLEAR POWER PLANT AL-002461.9 DECEMSER, 1980 ,
~ " ~ ' '
DISCHARGd 004A: TURBINE BUILDING SUMP - UNIT'I
-DATE Flori pH TSS 0 &'.G AVG ---
6-9 6.3 3.1 MAX ---
6-9 20.9 4.2
. UNIT MGD S.U. PPD PPD ~
F.9EO 1/ulK l / s*lK 1/tlK 1/vlK l 0.0116 6.87 0.10 < 0.10 '
2 3
4 . . . _ .
6 7
8
-9 0.0232 8.08 0.19 0.39 10 . , , , ,
11 . ..
12
.l3 . .
15 16 17 18 19 0.0274 7.03 0.23- < 0.23
- 20 21 22 .
23 24 25 26 27 0.0316 6.87 1.58 < 0.26 28 29 30 31 AVG 0.0235 7.21 0.53 < 0.20 SIGNATURE OF RESPONSIBLE OFFICI AL 7 b C BcdJ nger hr
L 1
l 1
1 ATTACHMENT IV Settling Basin I l
(OSN005) l I
NOTE: Occasionally pH reading was not determined because the flow at the time of analysis was zero.
V -
[..
ALABAMA POWER COMPANY 800 NORTH 1aTH STREET - P. O. Box 2641 BIRMINg HAM, ALABAMA 35211 - (205) 323.$341 e
June 6, 1980 t
Mr. James W. Warr '
- Alabama Water Improvement Commission '
Perry Hill Office Park 3815 Interstate Court Montgomery, Alabama 36109
Dear Mr. Warr:
Re: Farley Nuclear Plant NPDES Parait No. ALOO24519 In accorda cc with Part II.' .2Aof the referenc~cd permit, we are submitting a noncompliance that occurred as indicated by an analysis performed on June 2,1983, for the vaste settling pond effluent (Discharge Point 005). Analysis of the. cf fluent gave a pH of 10.88. ,
= .. ,
During April,1980, lime was placed in the . waste se ttling pond to neutralize sulf uric acid which had been transferred to the pond from a damaged storage tank. The acid was neutralized and no problem was encountered through the end of May. However, starting on May 6,1980, clarified water was discharged to the pond as part of the clarifier preoperational testing. Apparently the turbulence caused by the addition of clarified water assisted in gradually dissolving the layer of calcium sulfate which had formed over the lime when the acid was neutralized by the lime. Once the layer was dissolved, the unreacted lime was exposed causing the pH to exceed the upper limit.
To prevent the recurrence of this violation, the discharge of the clarified water to the ash pond has been terminated. Acid will be added to the pond to reduce the pH and to neutralize the lime.
If you have any questions, please contact me.
Yours truly, ;
WVw Y M C. lilldinger, Jr.[fInagE Environmental and Rer.carch Services !
rvn/y l
8 H tL P 1 fl C D E V E L 0 P ,A . L A D A M A,
~
ALABAMA POWER COMPAtW
- 500 teoRTH ISTH STREET - P. O. Boa 2641 BIRMINGHAM. ALABAMA 352M - (205) 323 5341
- Jtme 16,1980 Mr. James W. Warr, Chief Alabama Water Improvement Commission
- Perry 11111 Office Park 3815 Interstate Court .
Montgomery, Alabama 36109 Re: Farley Nuclear Plant <
NPDhs Permit No. AL0024619
Dear Mr. Warr:
In accordance with Part II.A.2 of the referenced permit, we are submitting a noncompliance report for violations which occurred at the referenced plant. ihe vaste settling pond, discharge point 005, exceeded the kilograms per day limitation for oil and grease (O&G) and for total suspended solids (TSS). These violations occurred on April 13, 1980, when 717 kilograms of TSS and 64.9 kilograms of O&G vere discharged.
), From March 22, 1980, through April 13, 1980, the discharge from
. the vaste settling pond was closed to allow treatment of sulfuric acid which The acid had been transferred to the pond from a damaged storage tank.
was successfully treated. Ilowever, during this time period the po ;d was receiving waste water from the water treatment p? ant and had reached its full capacity. The water was found co be within limits on TSS and O&G and was therefore discharged. The concentrations of TSS and 05G vere 21 mg/l and 1.9 og/l respectively, but the large flow of 9.10 million gallons of To prevent water caused the kilograms per day limitations to be exceeded.
' similar occurrences, the flow rate will be limited to ensure that kilograms per day limitations are not exceeded.
We apologize for the late rep.orting of this noncompliance. This noncompliance was not recognized earlier because of an error in waiting for the discharge quantitics to be calculated by the computer instead of calculating the quantities immediately. In the future all discharge quantitics will be calculated immediately upon determination of the concentration of the appropriate parameter.
If you have any questions, please en11 ric.
Yours truly, I 1
- C.MddInner,Jr Manc'er Environmental and Research Services 3
FVB/y H E t P iN G D tV tL 0 P A L A D A M A
/
- - Izbsms Power Comp 2ny ECO North 18th stroit
[
N. -
Post Offico Dos 2641 Birmingham. Alsbema 35291.
Telephone 205 323-5341
- E7 e
- . Alabama Power thesouthem electrcsystem t
i July 8,1980 -
.(
h Mr. James W. Warr, Chief Alabama Water Improvecent Commission Perry 11111 Office Park .
3815 Interstate Court a-lbntgomery, Alabama 36109' . -[
Re: Farley Nuclear Plant NPDES Permit lb ALOO24619 ,
Dear Mr. Warr:
'. In accordance with Part II.A.2 of the referenced pennit, we are submitting a noncompliance report for a violation which occurred at the >
referenced plant. An analysis performed on July 2,1980,. indicated a pH of 9.25 for the waste settling pond (discharge point'005). ,,
f
- As indicated in our June 6,1980, letter, sulfuric acid from a damaged storage tank was transferred to the waste. settling pond and was ',
neutralized by bulk lime addition. Consequently, the lime that did not' immediately react settled to the bottom. This lime has been slowly .
dissolving driving the pli above the 9.0 limit. ,
When the violation was detected, the discharge valve of the waste i
settling pond was closed off. Since the efforts described in the June 6, i 1980, letter were successful in keeping the pH within limits until the i present noncompliance was detected, simi,lar steps have been instituted to insure that future discharges are belost the 9.0 limit. '
i i
I Yours very truly,
- l, ,
d./a3bd[ C. triddinger, J o.::'
ana er aY Environmental and Research Services ,
SAJ:y
)
l
.g
- 8. 600 Alabama Powtr Company. <
'- North 18th Strset .
- # Past Offica Don 2641 ,
Birmingham. Alabama 35291 .
Telephone 205 323-5341
(.. ~ '
p .
Alabama Power thesouthem electric system
. 1 S'eptember 16, 1980 <
Farley Nuclear. Plant - .
_ NPDES Permit No..AL0024619 .
Mr. James W. Warr Alabama Water Improvement Corrmission Perry Hill Office Park ,
3815 Interstate Court -
Montgomery, Alabama 36109
Dear Mr. Warr:
e In accordance with Part II.A.2 of the referenced permit,. '.
u we are submitting a noncompliance report for a violation which occurred _
at the referenced plant. An analysis performed on September 8,1980, indicated a pH of 10.0 for the waste settling pond (Discharge Point 005).
As has been explained in letters on June 6,1980, and July 8,1980, the problem stems from an acid tank leak which occurred in April , 1980. The acid was neutralized by excess lime. The lime <
continues to dissolve causing the high pH values. -
Attempts to neutralize the lime with acid have resulted in lower pH values but does not appear to be a long term solution since the pH ultittately increases above 9.0. We are investigating dredging .
,the lime from the pond as a long term solution to insure the pH .
stays within discharge limits. .
Very truly yours, -
l gf(ddinger, t}rm Manager '
- CC .c=4 M
C .% ;
Environmental and Research Services j
]
SAJ:y 1
( .
j E I
- 1 l
. . - . . - . . . . . . , . . , . , - , . , . . , - - - + . - . . _ . . . . . . .
- 4
'.) L A d A .4 A I 14 P R O ' 1 E 14 d !! T C O '14 .M T S S I O
- i ATER .'t OISCHAHGE !4 ONITaR I fl G REPORT - "
ALABAM A POndR C0!/.PMlY FARLEY llUOLEAa PonEd PLAitT AL-002461? ,
J \:i J AR ( , 19 30 ~
DISCHAs1: 095 : SdTfLIs0 SASIll DATE FLad pH TSS 0&G AV3 ---
6-9 50.0 25.0
.4 A A --
6-9 16/.0 33.4 JaIT 400 -
S.U. PP.) PPD Edd] I/oK 1/ ,f K 1/ ,iK 1/n t; 2 .
3 .
4- 0.0016 7.03
- 0.05 0.03 5
6' l O .D i d i 6.80 0.62 0.2 /
8 9 '
10 - - - -
3g .
12 13 * -
14 0.013/ 6.42 1.55 < 0.16 16 to .
17 le 19 '
20 -
21 ,
22 23 24 3.0336 7.69 0.2d 25 -
23 21 23 0.0533 6.99 ! . /d 0.53 29 30 J1 AV3 U.0252 1.02 0.95 0 . 2. 6 S!-J;/ATJd2 0F RESPO iSIBL-i 0FF ICI ALd'2-N48 x -
8 e, e .e, eme e+ es w em e ...se.eame===m,-., -s e emm== nse . ** masse ===.- esen e * - e en*=me e m *==+,see- * *""* *=
- Nm eas se e ** **= * * **-e ==w= a e emme esse ++o-e-* *
,, e -- >
ALABAMA WATER I M P R 0 V E M E N'T' C0MMI5SIoN ,
DIS 6H 'R C' E M0 NIT 0RINO R E.P Q R T ALA3AdA ParlER " COMP ANY
. . . . . . .F.ARLEY. NUCLEAR POWE.R PLANT .. . ... ., . _ .
AL-0024619 FEBR'JARY, 1930 . , .
DISOH ARGd 005 : SETTLING BASIN
~ ' ~ ~ ' ~~
~
D ATE FL0cl pH' ~TSS O&G AVG --- 6-9 50.0 25.0 4AX --
6-9 167.0 33.4 .
Ucl iT 14GD S.U. PPD PPD FREC 1/MK 1/WK 1/WK 1/WVs I
2 3 ' ' '
4 0.0187 6.90 < ' O .' 16 "O.16 5 -
6 . . . . . . . . . . . . . . . . . . . - . . . . . . . .
7 t
8 . .
Y . . . .
10 '
1I 12 0.01B7 .
6.85, .
1 . 4. 0 . , 0. 1 6 . . , . . . .. . ..
13 .
I4 13 .. ..
I6 I7 13 0.0187_ 7.17 ' O.47 0.19 ..
19 20 .
2I . .
22 23 24 . . . . . . . . . . .
3 '
25 0.0533 . 6.20 . . 2.22. <. 0.44 26 27 . .. _
23 29
~ ~
AVG 3.0274 ~ 6.78 1.04 < 0.23'
~
V S I G.1 ATURE OF R E S P ONS I SL E O Fr:I C I A'd#/4 ~ _. f
A L.A S A M A WATER IMPR0VEMENT C0MMISSION DISCHA'RGE M 0 N I T 0.R I N G REPORT ALASAMA POWER COMPANY FARLEY NUCLEAR POWER PLANT AL-00246I9
~
.AARCH, 1980 DISCHARGE 005 : SETTLING BASIN
'~
DATE FLOW pH TSS 0 &' G AVG --
6-9 50.0 25.0 MAX 6-9 167.0 33.4 UNIT MGD S.U. PPD PPD FREO I nlK 1/WK 1/dK 1/WK 1
2 3 -
4 5 0.1870 6.51 6.24 19.04 j 6 . . .
t S t .-
9 '
10
.I 1 0.2940 8.08 9.81 < 2.45 12 .
14 15 16 17 0.0014 8.62 0.02 < 0.01 18 ~
19 20 21 22 23 24 ,
20 26 27 28 29 30 C.
31 AVG 0.I206 7.74 4.02 5.07 SIGNATURE OF RESPO:1SISLE OFFICI A'7DdMA g-
A L A d A .4 A- ,e Afdd I ,.l P d 0 '/ E .4 d 11 I CO4 DIS.3IO4 0 I $ J ri AHG'd M o ti iT0k I f4 G AEPOdT ALAo A..t A Po.idR 00aPAtiY FARLdY tiUCLdAR AhvEd PLANT AL-00246iV APHIL, 1960 OISCHAdGd JJ5 : SdrTLIiG dASIN DATd FLod pH TS5 0&G AVG -- 6 -V 50,0 25.0 c.i A X ---
0-V 167.0 33.4 UNIT MGJ S .U . PP0 PPD FHbJ l/aK I /88K 1/dK 1/ets 1
2 1 3
4 5
o 0.
7 6
Y 10 '
11 12 13 V.0200 6.15 1580.1 143.02 la 1o lo 17 0.0255 7.11 < 0.2 0.34 1d 19 20 21 0.0255 d.83 0.4 0.26 22 23 24 23 2a 27 2d 0.07dJ 7.53 4.5 < 0.65 29 JU A/J 1.e2Vd 7.41 317.2 29. 7V SiG!!ATU 4d of Rdsdo:15IOLd UFFICI AL&d / v My ff 9
1 A L A 8 A .4 A tr A T E d I At P W u V E i.! d N f C 0 A r.i'I 5 S-I O N OI 5 C ri A d G E M0 NIT 0 KING REPQRT l
ALAbAt.tA Porf ER Cot 4PAciY l FAHLdY NUCLdAH PondH PLANT I AL-0024619 l l
- 4 A 1' , IVd0 )
4 UISCHARGd 005 : SdTTLING 3ASIN DATd Flu,4 pd TSS 0&G Av0 ---
6-9 50.0 25.0 i
.A AX --
6-9 167.0 33.4 )
Wilf .4GJ S.U. P90 PPD Fac0 l /.i s 1/,1K I /,1K 1/nK i l
1 l 2 1 3 i 4
S 0.1080 7.57 6.31 *
< 0.90 I 6
7 e
9 10 13 ,
12 1.6300 d.90 108.82 13.60 ;
13 14 lo lo !
Il l lb I IV 1.6300 7.31 40.81 < 13.60 l 20 l 21 4 22 l 23 2
25 ]
do 1.o300 d.58 40.81 17.08 J 27 ;
2o 29 l 30 ,
31 AvJ 1.2c96 J.09 49.19 < 10.43 SIJJATJdd UF RdSPONSIBLE UF.:ICIAI M N- 35 M7+#M i
- 1. n B'A'M A: dATE IMPROVEMENT C'O M M I S S 1ON
-D I.S C H A d G E MONIT0 RING REPORT .
f ALABAMA'PodER COMPANY FARLEY NUCLEAR PonER PLA W - L AL-0024619 -
8 JUNE, 1980 .
'DISCHARCE 005 : SETTLING BASIN ,
DATE t:LOM pH TSS 0&G >
AVG 6-9 '50.0' 25.0 SX -- 6-9 167.0 33.4 ,
UNIT MGD S.U. PPD PPD .
FRE0 1/dK 1/WK 1/dK 1/dK i 1
2 0.4310 10.88 18.0 ~< 3.60 -
3 4 .
5 6
7 '"
8 0. . ,
c g -
to . 3 i 11 12 '
13 ,
14 ' '
15 O. -
'16 . , , ,
17 '
18 19 * * ' '
~~ ;
20 21 <
22 0. '
- 23 -
26 ,
25 2.8000 8.06 116.8 < ,2 3.37 26 L 27 28 - '
29
'30 0.I870 8.99 6.2 2.18 :
AVO 0.5697 9.31 23.5 < '4.75 -
^
h h b _g
- - - . ~ ~ . . .... ~.,...._. _ __ - f .. . . . . _ ,_ . - _ _ . _, . .. ., _ _ . . , ,
, . - - . _ . _ -- , , . ~ _ _ .-, - --
kLA8A.4 A .i A f E R I la P H 0 V E I4 d N T C 0 14 14 ISSIoJ 0IS0dAHGE .40 NITUh INO R5POdT ALAbAl4A PondR COMPAdY i FAHLdY NUCLEAR PanfER PLAi!T AL-0024619 JULY, I W30 0,ISCHAH06 006 : SGTfLI!40 SASIN DATE FLO,i pH TSS 0&G AV3 --
6-v 50.0 25.0
.4 A X --
6-9 1o7.0 33.4 delit :40 0 S.d. PPD PPD FRd3 1 / ,4 .< 1/ ,1K 1/aK 1/nK I
2 I 3
4 5
o 7 0.
d 9
10 ^
11 12 13 U.
14 to lo 17 le 19 20 0.13 /J d.51 17.1 < l.14 21 22 23 24 25 2o 27 2d 0.1970 6.50 15.6 1.98 29 30 31 AVJ J.031) 7.56 d.2 < 0.68 SIJ.iATJxd JF Rd3PosiSIdLs OFFICI d4 1
6 L A' d A :.i A ,i A T d R 4MPR0Vd,4dNT C 0 A i.! I S S I O if 0I$0HAROd M0N ITJRING 2dPOdT ALABAMA PeridR Col4PAilY FARLdY NUCLdAd PuddH PLA.lT AL.-002 4619 AUQJST, I/d0 DISCHAdGd 005 2 5dTTLIdG dASIf4 UATd FLJ.i '
pH TSS 0&G AVG ---
6-9 50.0 25.0
.4 A X ---
o-9 167.0 33.4 0.111 c400 3.U. PP0 PPO FRdC I /ar, 1/ .1 K 1 / ,v .< 1/HK I
2 3
4 5
0 7 4.7 < l .ld b
9 0.0533 9.45 4.0 < 0.44 10 , ,
11 0.02 3d d.14 1.4 < 0.24 12 13 .
15 10 17 16 19 J.43ld 6.05 10.8 < 3.o0 20 dl 22 23 24 25 7.1 < l.18 P. o 0.0540 l.60 2/
23 2V 30 31 A /3 0.1413 3.06 5.0 < l.19
". , s .
e
. _A . .
> .s
.n . .,. 1 : if a :, d ,.<.0.,,-...c. -
r.; . ,
- 0,. . I s- ns ,
. J, u 2 I S C :i A 11 G E .< d P ') .: T 1 0 c. I T a .7 I l 7 ALAlk"A FC.!d.< 00:'PA::Y FARLEY iiUCLEAR PonER PLA.lT Al-0024619 5 iP Ti'6E:t , 1930 s: 4 . I . l, vJ ,. A > I . I
, . , . , , . . ... y .
.> I ,a 7 . i. . n u, s. . . P.2 .
., r~
.1.. . _= :_.)s . .o..! v. o-- a .
) p.. v A '/G ---
6-9 50.0 25.0 6 .-9 167.0 33. 4
.a.s, '. i LA , '. ou o.J. r).7,o t+ ,)
FRiO I / i:
I/,0; I /.!'; 1/.!%
1 7
3 5 0.4310 7.37 39.6 < 3.60 o
7 8 C.0730 10.00 5.2 < 0.65
) .
10
- 11 17 .
13
- 14 15 to 11 11 l?
20 .
21 0.
~)
.u 1 .
23 0.1370 6.14 4.6 < l.14
?-
u 23 27 23 27 -
J.I671 7.43 3.I < 1.56
.N A'i3 3.1 ':a 3 3.06 10.5 < 1.39
.;'..:.,~,..:.
.. .:g :: .a . p i ; i .: t : <:g:t..n. h_ ___ i k f &
s a. g/
- - - -, , . n . ~ , - - - - , . , -
) j AD\3A !A aATER
- I tt P R 0 V E ?.i E ?! T C 0 ti 4 I S S I o 'l i D, 'I S C H, A R ' O 9 .. it 0.. 'l I .T 3 .R I. :! O Ii R'S P O R T !
f
.ALA3AMA ?O7:ER CD.tPANY . .
.:. j FARLEY 11UCLEAR Por:ER PLA'IT
....AL-0024619.... ...... . .. .. . .... . . . .
00 fJdf 2, 1980 DISOMAR3E C05 : SETI'LI:10 BASI:1 DATE FLO' I ... .- pH...... .TSS .. . O. & G .. . . . . . . . .
.W J ---
6-9 50.0 25.0
.', A X ---
6-? 167.0 33.4 I
'III T !!GD 5 . U . .. . PPD .. PP D. . . .
FREJ l/MK l f;;K 1 h;K i/MK 1 , . . . . . . . . . . . . . . _ . . .
2 J -
4 . . . . . .
5 ..
i 6 .
7 0. .'.2 ^ O ^..9 9' 10.0 < 2 . 7 <'. . . . . . . . . . ..
B 9
10 .
i I
i, il
- 12 13 0.1030 14 7 . 2 5_ .. .... . . 1. 8. .
.<.. 0. 9. 7. .. . . . . . . . . . . . . . . .
)
15 16 . .. . .
I7 .. .
1?
I9 . _ . . . . _ . . ..
23 0.2330 7.43 4.0 < l. 99 21 22 23 .
24
- s. =J e
u 27 0.0336 3.37 0.3 < 0.23 25 L. Y 3\
'VJ 0.1764 7.51 6.3 < 1.47 SIG"ATURE OF R2S?O lSI 3LE OFFI CI AL N,_,2p, MrO8 W /
i l
I r
.-. _ . - - - ~ _ . ._ .- -. - - --- _ - . - .~ .. . . ~ - - -. ._
r s.
.5 ,A q t t:. ~ ..
i e .> . ., ) V -., .: ! ,. .I-s . ..- ., .i
,) c: ..
.- j <3
- ' .i
- , ? ! S ; il A i? O E "0
'! IToR 1'.'G R 3 P ') :1 '.'
i
. L. ..s.. . .c.. . 3 )...l ,r,
. . g ,.,) ,, 3c.. s.
r e.. Li.:. v. . pJ <,,.
.. .r . . ., .n. .o. ,.) .. .. , ; ,
c..
4 AL-0J24619 .
1,., c., .. )
,s.. . . :,
,. j ,, - . . ...~: .. . y.> . t.:> . a .- ..--: . ,;. 7 .y g ;. . c, ...; .,..
GATI F U) .'. pH TSS O T. O
- A . ---
6-9 03.0 24.0 l '. --- *o I f.7 . 0 33.a
, p i . .- :- p. 3;s 33 .3 r e. nn. ...ij.
- I ,, . I <. . . . . ,.
1 1 /. ..
, ,- .1,,l.s, 1
2 3 0.1a40 9.13 3.3 < l.20 i ,
J 7
1 .) 0.1 140 6.42 2 . e': < l.20 11 9 '
12 ..
13
- 1 ,.
l .,,
1 .%
17 7)700
. 6. 9 0.7 < 0.55 1,
- 4. I
..p)
, 3, .
., 3
- , , , .,-. .,u p.. .r . ; ,. ; . .
- . <. ,,.
. 7; I
P 'i 9) i
- ,; ..j.
5.- 4 . ca n.-
1 . .J
< ., . 3 3
/ ' /.I133 7.07 20 < 0 . 'R
.,. s, .
' , , , ~j ..
4
\.-
t -
- 1. .2'its
. .c v ) I c. o .l . sI.. t.: ..i;t.rrj..,).
.s
,, !- r -
. , ,, } "g, " .AI .: '. "s
.. .. sJ. -
's f.,.'. . ) e , .,. z p, .---e.-~~
g, i
\)
i s
d e
. . - . _. - _ . _ . . . . _ . . _ - ~ . . . . . . ~ . _ . . - _ _ _ _ _ _ _ . . _ - . . . . . . . . _ _ . . . . . . , _ . _ , _ . _ _ . . _ _ . . . , _ . . - , . . , , _ . . . _
A L ' A .,B A M A MATER I M P R'0 V E M E N T C 0 M M I s s'I O 11
', DISCHARGE M 0 N I T'O R I N G .R E.P 0 R T ALABAMA POWER COMPANY ,
FARLEY NUCLEAR PodER PLANT AL-0024 619 _,_
DECEMBER, 1980
~"
DISCHARGE 005 : SETTLING BASIN DATE FLod pH TSS 0&G AVG ---
6-9 50.0 25.0 MAX ---
6-9 167.0 33.4 UNIT MGD S.U. PPD PPD
- FREO 1/,1K 1/,1K 1/WK 1/WK 2
3 4
5 6
7 8
9-10 11 12 0.0533 7.88 2.7 < 0.44 -
13 14 15 16 17 18 19 20 0. .
21 22 23 24 0.0336 8.08 0.6 < 0.28 25 -
26 2.7 28 29 0.0255 7.47 0.9 < 0.21 ,
30 31 AVG 0.0281 7.81 1.0 < 0.23 S IG.'!ATURE OF RdSPONS I SLE OFFI CI AL 2/ e 4,.C' B;dd. 7 h
ATTACHMEf6 V Sewage Treatment Plant Effluent (DSN007) 9
)
9
'f.
6
-( - ALABAMA POWER COMPAt1Y-
. 400 NORTH 187H ST R E ET - P. o. Box 2641 SIRMINcHAM. ALADAMA 35231 - (205) 323-1341
, C.-
~
- March 4,1980
,- , -)
~
Kr. James W. Warr, Chief .
Alabama Water Improvement Co=:=Lssion .
Perry Hill Office Park. ,
3815 Interstate court .
1 Montgomery, Alabama 36109 ,
Dc c Mr. Warr: ,
. Re: Farley Nuclear Plant NPDES Permit No. ALOO24619 In accordance with Part II.A.2 of the referenced permit, we are-s ubmittirg a non-compliance report for the sewage treatment plant effluent !
(Df.scharge Point 007) . The pH of a sampled analyzed on February 24,19S0,
( w as 5.01. The pH of a second sample was 5.67. .
- The sewage treatment plant's chlorinator has a manually set- '
flow rate to provide ade , tate chlorine injection for the expected flow f rom the sewage treatment plant. During the non-compliance period the flow f rom the sewage treatment plant was abnormally low. This resulted in excessive chlorine and consequently a lowered pH. To prevent the recurrence
- o f this violation, efforts will be made to decrease the chlorine injection. ,
rate when low flows from the plant 'are observed. .
Yours very truly,
./ , ,
Ter
/ o d, Pan s er-Environment c.
3 and Research Services rva/y bec: Mr. J. E. Dorse tt Mr. H . O. Thrash ,
Mr. W. M. Jackson A( , * .
Mr. F. V. Brown Mr. W. R. Bayne J File: T.(7) '1202 Og b H Et P 1 N C D EVEL0 P' AtID A M A
- i
-1
ALA3A .( A nATEA IMPR0VEMENT C 0 M M.I S S I O il 0ISOHARGE M 0 11 I T'O R'I N G R~E P O R T ALABAM A PodER COI.' pally FARLEY t;UCLEAd POWER PLANT AL-0024619 -
JAiTJAR(, 1930 JI SCH A.Od 03 / : Si.'. AGE PLANT D AT E FL0d 300 pH TSS -CL FEC COLI AVG ---
30 6-9 30 200/103
..! A X ---
45 6-9 45 ---
400/100 U.il i :.t3] ;4G/L S.U. .4G/L MG/L COL /!/.L FAEO 1/i4 J I/A0 1 /s.'. 0 1/o10 I /.1K I/0TA 1
36.40 -
2 3
4 .
5 6
i 8 16.40 9 -
10 -
r i; I2 -
13 ..
14 17.20- .
!S lo 13.0 6. /0 13. 2.30 0.
l/
13 j9 . . ,.- .
20 0.0120 , 6.36 21 22 23 .
2 -4 -
25 12.00 20 27 2S 29 JO 31 -
AVG U .012') 13.0 6.53 13. It.26 0.
SIG:i ATJAd 0? R iSP0;! SIDLE OFFI CI Ad7d---bdd '
O~--
A L A B A .1 A ri A-T E R IMPR0VEMENT C 0 M M l'S S Ifa N-4 0 I S'C f!s~G A E' ~M5NI I' O R I N'G R' E P 0' R T.
ALABAMA POWER 00?/P.ViY '
FARLEY. NUCLE AR PO'iER . PLANT. .. .. .
AL-0024619
- E3RU GY , 1930 , .
DISCH OOi 007 : SEviAGE PLA'1T
~
D ATE FLod EOD 'oH TSS CL ~FEC COLI
.U/G --
30 6-9 30 ---
200/I00 4AX --
45 6-9 e. 5 --
400/1CO UcilT MGJ MG/L S.U. MG/L ~ MG/L COL /4L Fah0 1/hD 1/MO 1/MO 1/MO 1/,1K 1/0TR 2
3 4
5 6 . . .
3 9 ' ^
10 11.90
, 11 12 . .. .. . .. .
13 23.0 7.30 . 12. 147.00 0.
14 26.20 15 .
16 17 la . _ . 18. 40 19 20 21 ~ '
22 23 24 0.0033 ' ~
5.67 ' '
25 6.62 29.10 26 ;
27 26 29 O/G ?.0033 23.0 '6.53 12. 46.56 0.
S!GATURE OF RES?o4SI SLE OFFIC! 2.d.E--/ dO4r '
W I
l l
j 1
'f i
. . . , , . . . . , . . . . . -_...m.- __ . _ . . . . . __ ,
A L.A.3 A M A WATER 1MPR0VEMENT C0MMZSS10N DISCHARGE M o N I"T 0 R I N G REPQRT ALABAMA POWER COMPANY FARLEY NUCLEAR POWER PLANT . .
AL-0024619 MARCH, 1980 . ,.
DISCHARGE 007 : SEWAGE PLANT DATE FLOW BOD pH TSS CL FEC COLI AVG ---
30 6-9 30 --
200/100 MAX --
45 6-9 45 --
400/100 UNIT MGD MG/L S.U. MG/L MG/L COL /ML FREO 1/MO 1/MO 1/MO 1/MO 1/WK 1/OTR 2
- 3 .
4 ,18.40 5
6 .
7 8
9 10
.11 . .
I2 68.0 , 6.50 48. 4.50 0.
I3 14 14.30 15 16 17 18 , ,
I9 ,
20 21 0.0100 7.06 11.30 22 23 24 5.20 25 26 27 23 29 30 31 7.60 AVG 0.0100 68.0 6.78 48. 10.22 0.
SIGN ATURE OF RESPONSIBLE OFFI CI A'M /-N #[
. - . - - - - - - - - -- =-
i
A L A d A_. ^4 A el A TEd I M P R 0 V d M E N'T C 0 r4 M I $ 5 I O ;i-0I$0 dad 0E :.t 0 ti ITuWING REP 0AT ALAdA!.iA PuddR CU,iPAtiY FAdLdY iiUCLEAR PondR PLA:1T AL-002461Y APHIL, 19d0 JISCHAkGd 00 7 *-SEnAGd PLANT DATd FLoa 300 pH TSS CL FEC COLI AVG ---
30 6-9 30 ---
200/100 MAX ---
45 6-9 45 --
400/100 VWIT 400 ..tG/ L S.U. .4G/ L 40/L COL /:.tL FdE0 I/;40 I /t40 I /nto I /t.to I /,1X 1/0TR 1
2 3
4 b-6 7
6 V
IO ^
11 l2 13 14 I5 16 17 17.40 1d IY 20 6.88 21 22 29.60 23 24 0.00d0 40.0 7.40 id. 3.00 0.
2S 26 21 28 29 30 29.50 AVJ 0.u0dd 40.0 1.14 Id. I V . -38 0.
SIJiiAT-JRE JF dd5?O.1SidLd 0?FICIAf M 7__/ 1 7 / , _.,
, A L A :s A A A a A idR I et P k 0 1 E 4 d il T C 0 14 :.1 I S S 1 O d OI5CHAdGE .4 0 N IT0R ING REPOd r ALABA!4A PU.1ER COMPAdY FARLEY NUCLEAa podER ' PLANT AL-0024619 M A '( , 19dd UISCliAdGd 00/ 5doAGd~ PLANT OATd FLO i 800 pH TS5 CL FEC COLI AVG --
30 6-9 30 ---
200/100
<4AX ---
45 6-9 45 --
400/100 UNIT .40) 14G/L S.U. MG/L MG/L COL /AL FdEQ l/a0 I /tdo I/!40 1/40 I /,1K 1/OTR I
2 3
4 5
6 7 8.60 6 ,
9 10 11 12 13 14 12.'70 IS to 17 ld 19 20 0.030J 6.95 21 3.00 22 39.0 7.50 45. < 0.10 > 9999.
23 24 23 26 '
2/ J.0250 6.54 2d 5.20 29 30 3\
AVG J.0275 39.0 7.00 45. 5.91 > 9999.
SIGd ATJad J? Rd5c'ONS idLi UFFICI AL 6M/ </
1'L A : 2 'A . . A I d .y I :* e .< 0 '/ E.1 H If .; 3 : I S 3 Ia*
J l S C K A :< J li .4'l I T '.) n' I : J -: a r- 0 .< i AL AJA A ? O.:dH CC+'.P A:.'Y t A dLEY FJCLEAd P').'.ER PL Ail f AL- m24619 J'J . .: , I>30 QI 3 2.! A:t'id 00 / : S E,i Ald eLAtlT
.?Ard plo. 300 a.-i T SS CL FEC COLI
/n --- 30. o-? 30 --
2no/100 (A s ---
45 6-V 43 ---
A no/10')
U.N I T (GU W/L S.U. 10/L .:G/L 00L/ ?!L p air. I/.iO 1 / 10 I / (O 1 /'40 1/Ti i/DIR l
o 5.10 3
.,m o
a 7
.i 7
l ')
11 43.0 7.30 23. , 0.40 0.
1 *> .
13 1.50-1.;
15 15 1.40 17 13 1J 29 0.32 7) 7.10 21
.n.
23
? .
25 27.01 20
'l
$. s. .
1)
JC 17' 1. " :27) 4J.0 7 . "!0 23. 7.1: O.
3 ! J. , .* a ., s . Y .t iS .-O. i 5 I 'ili 0 d. I2i/' d > d _#M e - / /
cf /
t
, - , y .--
A L A d ; .4 A
.4 A fdR IM t> R 0 V E .4 d N T C 0 :.i .4 I 3 3 I O il 1
uiSCdAHGE :4 0 il 1T0H IHG H i n' O'd T l ALAti A, A P0HdR Cul4PA iY FARLdY tt0CLdArt PuddR PLAT 1T AL-0024619 l JULt. I/30
- DI S0d A,4Gd VJ / SdaAJd PLAitT DATE F LJ.i 300 pd TSS CL FEC COLI A'/J ---
30 6-9 30 ---
200/100 i
,a A X --- 45 6-9 45 --
400/103 u iIi .4JJ ..n 3/L S .J . .40/L ..) G/L COL /c.il FAdQ l/r10 ( /.10 1/<40 1/t40 1/.lK 1/0Td i
2 3
4 5 0.90 o
7 c
9 0.40 10
- ii .
I2 13 14 15 10 1/ 45.0 c.10 9. 4.50 0.
Is 19 2U 21 0.20dJ 7.10 22 23 37.10 24 2'a 23 2/
2c 2)
.50 31 AVG 0.0330 45.0 c.cd 9. 10.73 0.
SIJ.;AT).fi ;? R d5PU iS I dLd UFF IC Id/- -bMM e/,#
ff i
I
I A L A d A 14 A nAfEd I M P R 0 V d #4 E fi T C 0 M i4 I S S I'O N OISCHARGE M 0 t1 1T0k I tl 0 RdPOdT ALALIA;4A POWER COMPAtiY FARLEY NdCLEAR t)0riEd PLAi1T AL-0024619 AJUdST, 1960 JISC.'iAdGd 00 7 SddA32 PLAtlT JATd Flad 30D pH T SS CL FEC COLI AVG 30 6-9 30 --
200/100 l4 A,( ---
45 6-9 45 --
400/100 U.4 I T .M0 .4G/L S .U . i40/ L I4G/L COL /.4L Fdde I/,40 I/.10 1/i40 1/ 40 1/dK 1/0TR I
2 1.10 3
4 5 11.40 6
7 44.0 6.90 21. 2.70 0.
d 9
10 . .
11 12 13 .
14 IS lo 17 1.60 le 19 20 21 22 0.0300 - 7.34 3.50 23 24 2S 2o 11.30 27 26 29 30 31 AVJ U.030) 44.0 7.12 21. 5.27 0.
SIJ.iATJds J. Risr utiSIdLi 0FFIC!!NO T-/ C4 e s
ILA33'tA A ATEA I M P R 0 V E !! E lI T C 0 :! 4 I S S I o il J I S 0 H.A R G E !.1 0 ;l I T o R I :-! G A E P 0 .1 T ALASAMA Po 'ER CO."PA.iY FARLEY ?!UCLEAR P0/IER PLAllT
,AL-00246I9 SE?TE'.t3EA, 1980 J I S O.( A.tG 03/ : SEaADE PLA!!T 0Ai3 FLO.i 30D pH TSS CL F50 COLI AVG ---
30 6-9 30 --
200/100
. A ,( ---
45 6-9 45 ---
400/107 IJ:llT 'tGJ 'tG/ L
. S.U. P.tG/ L . M0/L COL /::L F HiO I /.'10 1/;.!O 1/MO 1/ !O I /,li' I/CTR I
2 3
4 5
6 7 < 0.10
- 3 9 19.0 6.90 3 3.. O.15 > 9999, i 10 . .
Il 12 13 14 5.69 15 13 5.20 17-13 ,
l?
20 0.0030 6.73 21 12 5.00
?3 2,
25
^
i a
27 23
- 2/ 17.00 ,
30 P
.i/) 0. 1920 19.0 6.34 33. 5.50 > 9999.
. S IG :/CJ..a : .: -!d3Fo!!5I?LE 'i?/I C'dTh[ %- -
i c7 ,
1
- Chlorinator out of service 1 1
1
.. , ,,,( .. .. . . . . . ,- . ,, . . . . , ._ ,c w, ...n - i ,, - s 4 , . . ,
, D 1 S C 11 A . R . G_ E. 11 3 !! . I T .0 .R l il G
. 3 E .P O 2. T .. .
.. ALAC AMA . Po,!2R CO'.iP A(!Y .. . . _ ..
t i
FARLEY NUCL:A R PonER PL A!T
. . . . . . . . . . . . A L- 002 4 61 9.... . . . . . . . . . . . . .
OCTOBER, 1980 DISCd 4R'3E 007 : S E,4 1GE PLA'IT DATS FLO',!.. S O D.._ _. . ._.. p H . .. . . _T S S . ._...CL .FEC COLI. . _ . . . . . . .
AV3 ---
30 6-9 30 ---
200/100
'AX ---
45 6-9 45 ---
400/100 U!ilT . ;G D .;C/L. S.U. ?iG/ L . MG/L COL /RL.. .. ..
FRO .1 /. in i /:to 1/:.10 1 /.20 1/1K 1/QTR 1 .. .
2 3
- 4. .. . . . . . . . . . . . . . . . . . . . . .. . .
a 6 1.30 7 . . . . . . .. .. . .. . . . . . . . . . . . _ . . . .. . . . . _ . . . .
8 9
- 10. . . . . .
Ii 12 13 . . . . _ . . . . _ . _ _ _ . . . . . . . . . . . _ . . . . . . . . . . . . . . _ . . . , . . . . . . .
14 26.0 6.90 6. 2.60 0.
15 16 1.30 .. . . . . .. . . .
I7 18 19 . . .. . .. .
20 0.C400 7.38 21 22 23 24 25 .. . _ . 1.40
- l ./,
2'i 2. 90 28 . . ._
. 1 29 3D 1 . . . . . . . . . . .
l 1
AV3 0.0400 26.0 7.14 6. c 1.42 0. '
f S I O.J A rL:.'?. O F Rd S?o.iS 19 LE O FFI CI '. L .
/
- 4. - EclhTb C.% bb..f.d. l 1
4 i
phe. em .
1,.
f..
4
. c. .r : o. 1 ..,..u , o. y .. .
. 4. r c ,3 .. ,,
y c. c. ,
,) .,
. . ., .> 1 .
. D ! S 0 .: A205 U. ') el ITn2I40 2 E ? o !! T i . l. a, ., :. . .. . s:.s e,).....,
.... . ,. ......s.
) . . . > . . ,(
a . , f. f 1,- .a vea., :-
c A... e - , ; nt o :. .d .
3;.3..,,.
.1 A!.-0324619
- s.) , . >,.: >. . . .
I r.y n .v.
, . , . . . . .3.
- . s7 . .
- 6 ;. ..,.A.
- . r,. t;
. r>'Lb:e4 t
, .. r. F L,.) i . >, r.). n .
,s.1 ec
..u ai m.
c ::..a.
. .~.
. . ,, L I
'. / '
30 6-9 30 ---
200/1 n 43 6-9
- 3 ---
400/100
( n. t-J . 4.j . or t
' .t . f.
- f.* it.' / l. r*st } s /.* t t,,
. . s- . :fu .
r ': . . 1/:'O 1/-O I /.'n I /:'/) 1 /. ; < 1/r:79 i
).
t o
5 7
~.
- 1) 3.53 11 33.0 7.00 15. 3.00 3.
j .7 . ..
- 1. .
It 15 l,
i, se 4.
1
.> ; .. . .up, .v. 7 . .,. 3
. 11.... r.=
22 23
- i. >
23
- a , ,.
<t x: .
2)
- 7. .i i . n. . s"/ n
.c
. J . .., 3 5 0
. . . ., , . ,J 7 . n,1 1. . , .
. . . n.
, 3- , . .
> j , . . . ., - . . :. c.. c r .: ..c .,n. . c i . .im .. r e.:.:: r . [ a:t
(.-___ _ ,
/
._..,,.4 ,' /-
- r. e,;-
f' I l s e
oversite 4
1 A L A B A.M A ti A T' E R I M P.R 0 V E M E N T C' O M' 14 I S' S ' i 0 N D I.S C H A H G E M'. O N 1 T 0. R 1 N G . REPORT . . . ,
ALABAMA P0/lER COMPANY _ _ , .
FARLEY NUCLEAR PorlER PLANT
- AL-0024 619 DECEMBER, 1980
' ' ~~~ ' ' ~ ~ ~ ~ ~ ~ ~ ' ' ' " '
DISCHARGE 007 : SEdAGE PLANT' ~ ~'
DATE FLod BOD pH TSS CL- FEC COLI ' ~ ~ ~ ' ~ ' '
AVG --- 30 6-9 30 ---
200/100' MAX ---
45 6-9 45 ---
400/100. i UNIT MOD MG/L S.U. MG/L MG/L COL /ML FREO 1/ l1,0 1/MO 1/MO 1/MO 1/WK 1/0TR I .. ... . . _
2 J
4 . .
5 6
7 ._ ._ _. , ,,
8 i 9
10 31.0 7.10 24. 2.30 _ 0. . .
11 5.70 -
12 -
13 . . . . . . ._. . - . . .
14 15 16 17 18 5.20 19
- 20 0.0030 ,
7.30 21 22 5.20 -
23 24 25 25 ;
27 1 28 29 l
30 31 1.80 0.0050 31.0 7.20 24 4.04 0. l AVG- l I.
3 5IG;!ATURE OF RESPONSIBLE OFFICIAL b;;1,17%,1EC.GJdgerh.
i
0 f
F ATTACHMENT VI lietal Cleaning)
(DSN 008 Wastes
,. =
i r
.I i
I l
l l
t b
- i. 1
-f
,t
.I 4
-1 :
- j l
t . .
- ALADAMA POWER COMPANY
- - DIRMlHCHAM. At.ABAMA 35al - pc5) m.gpg e
March 20,1980
. ' ~ '
r .
Mr. Games W. Warr, Chief ' -
- - Alabama Water Improvement' Commission -
Perry Hill Office Park ~
f gom ry 1b a 361d ,
Dear Mr. Warr:
Re: Farley ttuclear Plant's .
llPDES Permit tio. AL0024619 .
In accordance with Part II.A.2 of the referenced pennit, we are submitting a non-compliance report for violations which occurred at the
- Farley !!uclear Plant. During the period of March 8,1980, to March 11, 1980, approximately 300,000 gallons of water were released from the metal cicaning ' waste holding pond, discharge point 008, into .the Chattahoochee '-
River. The iron concentration of this water was fnund to be 1.55.mg/1..
^
i .
- This non-compliance occurred because the heavy rain which occurred'durin'g
- this period cause'd the pond to overflow. .To help prevent the recurrence '
of this violation, the height of the dam has been raised to giv'e . increased' r:.'.,
volume in the holding' pond. ,
The steam g'enerator blowdown, discharge point 003A, was found '
- by analyses performed on February 27, 1980, to have an iron concentration of 3.01 mg/l and a copper concentration of 1.19 mg/l . . This non-compliance was caused because Unit I has experienced several shutdowns recently,As and air in-leakages which were reported early continue to be a problem.
part of the Company's effort to eliminate these violations, the Company is attempting to locate and repair these leaks.
If you have any questions, please call me.
Yours tr.uly, l
. 7.! h / -l
.g'E- c . John E . Dorse tt '
v General Manager, j Power Generation Services '
9
. g Il c 1. Pl tt G DcV E lop ALA D A l.t A
..o .- -wee.e.-- e
.ene m . as .em.-e, e.
- w .
- -em e assie w* esem es * <-me=
.. . e S om mape , me . . , . .
-.*amea
- e e- es.e e . em.. .. wo e e e .w 4.
Alibams Paw r Company
. 600 North 18th streit Post Office Box 2541.
Birmingham. Alabima 33291 Telephone 205 323-5341
- py _
- . Alabama Poiver -
the southem c ectic system .
July 10,1980 Farley Nuclear Power Plant NPDES Permit tb. ALOO24619 .
Mr. James W. Warr, Chief
- Alabama Water Improvement Comission Perry Hill .0ffice Park ,;
3815 Interstate Court -
Fbntgomery, Alabama 36109_ e
Dear Mr. Warr:
As required by your letter of June 11, 1980, we are providi.ng l the following. responses to the noncompliance items. .
' ~
Item 1: Metal Cleaning Waste The metal cleaning waste pond was designed to hold metal cleaning waste plus the runoff from 15 acres of plant yard. However, the heavy rainfall encountered in the spring caused the storage capacity to be exceeded. Had the heavy rainfall not occurred, the storage capacity would not have been exceeded and no problems would have been encountered.
The discharge of metal cleaning waste into the pond has ceased.
Any future metal cleaning waste will be directed to a chemical holding pond which does not receive yard drainage.
Since the metal cleaning at Farley has been completed, we propose to eliminate the present metal cleaning waste pond and allow the surface drainage to discharge through the pond by placing a drain pipe in the dam to allow the water to pass. This arrangement has been ,
discussed with Mr. J. P. Martin. Your concurrence in this arrangement I will be appreciated.
i Item 2: Holding Time We have investigated the matter of holding. times for oil and 1 grease, fecal coliform, and B0D. We found that the only one being exceeded 1 is the oil and grease, which has a holding time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. However, EPA proposed in the December 18, 1979, Federal Pegister, to change the holding time for oil, and grease to 28 days. We feel that the 28 day holding time is more realistic. However since the official holding time is presently f.
- . ' (:- D Mr. James W. Warr, Chief Page 2 July 10, 1980- .
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, our method of' shipping samples to the central laboratory has been changed to insure that the present holding time is not exceeded.
This new method of shipment is the same, as that used by other plants within Alabama Power.
If you have any questions, please contact me. . .
.Yours .very truly,
&bh/AS C.'Biddinger, Jgs, Mad 5ger m
Environmental and Research Services FVB:y .
g 9 .
h e
e f
a
?
J a
e 4
4 ,
se g> +
, - - >c._ , _ = -, ,. , -.,r- _ , , ,,w,_. .,, , , - % . r.,- -
A L A S A .4 A AATER I M P R 0 V E i4 E il T C 0 M M I S N I O l1 REPOHT 0ISCHAHGE M 0 !! I T o R I 14 G ALAS A iA Poi 1ER CO:.tP AliY FAHLEY NUOLEAR ?0aER PLAdT -
AL-0024519 J A.lU AR (, 1930 -
\
DISOHAdGE 003 : METAL CLEAI!It4G MASTES DATE Floa pH TSS' T Phos 0&G CU FE AVG --- 6-9 30 1.0 15 1.0 1.0 l4AX -- 6-9 100 i.0 . 20 1.0 I.0 U.11T .4JJ S .0. .14G/L MG/L hiG/L MG/L hiG/L FRE] 1/JAf 1/,G 1/dK 1/nK 1/.iK 1/aK 1/ ilk 2
3' . _
4 5
6 . .
f 9, 8 .
9 --
10 -
12 l3 .
! 14 0. .
15 to Ie -
1S 19 20 -
21 0.
22 23 24 25 -
26 2t 26 0.
29 30 31 AVG .O JISCHARGE i
S IJ.J ATJ.f E JF RESP 0;tSISLE OFFICI ALdl #
0 '
i
)
b '
I
+ - - - - - . . . - - - - - . - - - - . . - - ~ - . - - - - . - . . . - - . .
w
i,
. A i. A 3 A 11 A 'ti A T E R f M P R 0 V E h E (1.7 C0MM2SSIoN J
.. .. . l D I S C li A R G E M 0 !J. ITURI4G REPORT AL A3 A't A PO,iER CO?.'PANY e FARLEY tiUCLEAR PorER PLAlli' .
AL-0024619 F EB fiU A.RY , 1980 DISCHARGE 008 : METAL CLEANIliG PI ASTES
~
DA'iE Flo,1 pH TSS T PHOS 0 & G' CU i:E AVG ---
6-9 30 1.0 15 1.0 1.0
.! A X ---
6-9 100 1.0 20 1.0 1.0 U 11T .'4GJ S. U. MG/L 'tG/ L
. MG/L MG/L l!G/L F.-i E O I /D AY l/WK i/WK 1/nX 1/riK 1/dK 1/WK 1
l 1 O.
2 3 - .
4 0.
5 6 . . . .
7 8
9 . .
10 0.
II
, 12 . . . . .
13 14 15 .
I6 17 9.
1S .
19 20 21 22 .
23 24 0.
25 26 27 2d 29 WG W DISOHARGE SI G'4ATURE OF RE3?orlSI BLE OFFICI AL#.A-4-MO f
/
- en. en - - -es . y . o .e -eme e . e. ee -, e e ew eeps +. -- -
-m e e e em eee gs**e eww e* + +====== - . eum m +- =**=***"*m**NNe*=*
ALABAMA WATER I M.P R 0 V E M E N T C0MMISSIoN D I S C.H A R G E MDNIT0 RING REPORT ALAB AMA PodER COMPANY ,
. FARLEY NUCLEAR POWER PLANT .
. AL-0024619 MARCH, 1980 .
D!SCHARGE COE : . METAL CLEANING WISTES DATE FLod pH TSS T PHOS 0&G CU FE AVG -- 6-9 30 1.0 15 1.0 1.0 MAX --
6-9 100 1.0 20 .l . 0 1.0 Uill T MGD S.U. MG/L MG/L MG/L MG/L MG/L FRED l/ DAY 1/WK 1/WK .1/Nrs . l/WK 1/WK ,
1/WK 2 0.
- 3 .
4 5
6 . ..
7 '
8 9
.0.1000- '
10 0.1000 11 0.1000 . 7.43 13. 0.9.10 . 1.4 < 0.01 1.55
, 12 . . . . . . .. . - .
13 14 15 16 17 ,
18 . . . . ,
19 .
20 21
- 22 ;
23 0. .
24 . . . . .
25 26 '
l 27 -
28 29 30 0. .
31 AVG 0.0500 7.43 13. 0.910 .l.6 < 0.01 1.55 SIGNATURE OF RESPONSISLE OFFICIA? N - [ d 1
a
.e
A L A d A .4 A .i.A T E d IA PH0 V E la e N.T C0 4 :4 I S S I O N OISCdAdG$ :4 0 N I T o n I N G dEPOHT ALAc AJ4A PontR CD:A P Ad Y FAHLdY NJCLEAd donER /LAdT AL-0024619 AddIL, 19do JISCHAHCd 006 2 AdTAL CLEANING VlASTES DATd FLO,v pH TSS T PHOS 0&G CU FE AVO ---
o-9 30 1.0 15 1.0 1.0 r4AX ---
6-9 100 1.0 20 1.0 1.0 U.1I i .400 5.d. MG/L ,4G/L MG/L .4G/L MG/L Edta 1/ DAY 1/.tX 1/etK 1/ rad 1/dd I /,iK . 1/.f K I 2. 0.494 < l.0 < 0.01 0.98 2
3 4 14.d000 1.02 5
6 7
6 9 .
10
. +:
12 13 b.
- 14 lb lo 17 16 19 2U 0.
21 22 23 24 2S 2o 27 0.
28 29 30 AVG 3. 7000 1.02 2. 0.494 < l.0 < 0.01 0.7B 1
1 SIGNATJde CF RdSPCNSidLE OFFIJI A'[ /-e.L7I- c l
.. .....~..
h
A L A . d A :4 A d ATdd IMPR0VEJENT C 0 la A I5S I O cl -
U ISCHAHGE I4 0 N I T U H ING AE-PORT ALABAntA PosidR CokPAi1Y FARLdY NUCLEAR duabR PLA;1r AL-0024619 f.t A ( , 1980 DLSCHAr<GE 006 adTAL CLEANING WASTES DATd Flait pH TSS T PHOS 0&G Cd FE AVG --- 6-9 30 1.0 15 1.O I.0 AAX --- 6-9 100 1.0 20 1.0 1.0 UNIT 6l00 S.U. MG/L big /L hiG/L a(G/L stG/L Fde] I/DAf 1/dK 1/.iK l/rtK 1/nX 1/r1K 1/dK I
2 3
4 0.
5 6
7 6
9 10 i .
. ll 0.
12=
13 14 15 to . i 17 a IU 0.
19 20 21 22 23 24 25 0.
2o l 27 2d 29 30 31 AVJ aJ DI5CHAdGd
(
l SIO.lArJdd aF Rd5PmiSIdLd 0FFICI AIMM$dd s-
A L4 3A i2 .. A T'd ri I " 9 d 0 ! d 4 d if i .; a :* " ! S 3 11 :)
3 i 6JdAdSd 1 0 .I I f 0 :4 1 4 0 .f d P o .< T ALA I At:A H).ld.4 CC d?Ani FAdLEY !JCLEAit /0/E!! PLA if AL-0024619 j J li .' d . 19 31 DISC.lAHGi 000 : AdTAL CLdA.NI'lG n'ASTES J A fd F L\).4 p.4 T53 f PF.05 0&7 CtJ Fi
- 4. VG 6-9 30 1.0 15 1.7 1.0
%X --- 6-9 l 'V) - I.0 10 1.0 1.n
- u. LIT AG) 5 . il . '4G/L .tG/L :!G/r O/ L !!G/L F a d'] 1/DAf 1/aK 1/,i K 1/ris 1/ is I/nX 1/ <. <
1 0.
2 14.5000 /.04 7. 0.059 < 1.0 < 0.01 0.52 3
4 5
6 7
3 9
10
. 1i 0.2233 d.04 4 O.106 <
t 1.9 .<
4 -
0.01 0.7B 12 U.4992 13 0.4992 14 0.4972 15 0.4992 1> 0.o732 11 ').161$
13 19 .
23 21 l 12 RJ
) .
25 29 27 2 -1 2V 1.
31 l A. V i 1.7ca0 7.54 7. 0.060 < l . ') < ?. . n l 0.52 i
i l
S l;i. Aiu..d- )F :< =EdGh313L5 O?F I CI ' LL AO
~
- - f 4 1
e i
i
A*L A d A ..t A d A f 2*H I i4 P R 0 V E 44 d N T C 0 .4 14 I S S I O :4 JISCHARGE to 0 if I T 0 R I t1 G REPOdT i
I ALABA;4 A P0ddR CO.d ANY FARLdY tlVCLEAR Po,1ER PLANT AL-0024619 JULf, i160 ,
JISCHARGd 006 : a2TAL CLdAtildG <vASTES DATd FLod pH TSS T /HOS O&G CU FE AVG ---
6 -V 30 1.0 15 1.0 1.0 l4AX o-9 100 1.0 20 1.0 1.0 JNIT .4GJ S.U. MG/L MG/L 14G/L .4G/L M3/L
' F.M3 1/DAf 1/,aK 1 /,1.< 1/uK t/dK 1/nX 1/.iK 1
2 3
4 5
6 0.
7 d
v i
10 .
Il 12 1 :' O.
14 16 16 17 18 19 20 0.
21 22 i
23 24 ,
20 2o
'27 3.
26 2Y 30 31 AVG 4.) DISCdAdGd SI'J.iATJ4d UF RdSPD.iSIbLE OFFICI/ 6 % h -
67
-4 =
= = = =p-=a4
- -e %...
6
A L A 8 A .4 A si A T-E A I r4 9 R a V E :4 E N T C 0 i4 4 I S S I O 14 0I$CdAA02 A 0 fl I T U R I i4 G dEPOdT ALABAr4A PondR CoxPAriY FARLEY lidCLEAd PonER PLAtlT
- AL-0024619 AUGUST, 1960 DISCHAdGd 003 : ,aETAL CLEA14ING WASTES ,
DATd FLua pH TSS T PHOS 0&G CU Fd AVG --- o-9 30 1.0 15 1.0 1.0 4AX --- o-9 100 1.0 20 1.0 I.0 MG/L 0,11 f i40 ) 5.U. !.iG/ L i4G/L MG/L 14G/L Fdd) 1/DAf 1/dX 1/dK 1/nX I/dK 1/dK 1/,iK I ,
2 3 0.
i 3
6 7
8 i
9 ., ..
10 0.
Il 12 13 .
14 15 to 17 0.
le 19 20 21 22 23 '
24 0.
2d L 20
.i '
2/
23 2v 30 31 J.
[
AVG ua JI5CriARGd i
i SI11ATJad 0F RdSPO:451SLd GFFICId / UI fM
]
y/
f m
O
+
ALA3A:4A el AfER I .'4 P R 0 V E M E il 7 00 ;4 14 I S S I O N JISCHARGE M0 .'l 1 T 0 R I if G HEPGAT ALA3 A!.8.A PC lER COMPAtlY FARLEY tJUCLEAR PodER PLAfiT AL-0024619 33P TE 43ER, 1980 CISC.!A7tGE 003 : METAL CLEAtil?!G ;'lASTES DATE ? LO,1 pH TSS T Plios 0&G CU .:E AVG ---
6-9 30 1.0 15 1.0 1.0
.4AA ---
o-9 100 1.0 20 1.0 1.0 U IIT :.iG) 5.U. 14G/L MG/L MG/L iiG/L iiG/L
/ d s ') 1/DA( 1/.iK 1/.is 1/dK 1/.iX l/slX 1/d4 1
2 3
4 5
6 7 3.
i i s a -
lO -
11 12 13 14 9.
15 ,
15 17 13 19 20 21 0.
22 23 24 25 2c 27 2z 0.
2)
.30 A '/J 10 .JISCHARGE 5I3.iA?URE ai DES?O. 5IBLE OFFIC'MM NMr '
~
..es w. ..e.+. w e- e. + -
' ; L A 3 A .1 A 'c! A T E R 1 !i P R 0 V E .1 E '! T C 0 l.t 't I S S I o 't .
O I S ' C ii A R 3 -E '4 0 N I T- 0 R I 71 G R E P o 9 T-ALAS AM A P:r/'ED C01.!PAdY . . . . - . . - . .
. ARLEY '!UCLEAR P0ilER PLA!!T
. . . . . . . . , ...AL-0024619.. . . . . _ - . . . . . . . . . . . . . _ . . . . . . . . .
OCTOBER, 1980 -
DISOHARGE C03 2 1.tETAL CLE ANII'G .iASTES DATE Fi.0W - .. . pH . ._ __ISS . .T PHOS. O . & G .. . . . . C U - . .. . FE . _.
AVG --- 6-; 30 1.0 15 1.0 1.0
- A iX ---
6-9 1 00 1.0 20 1.0 1.0
'J:11 i GD
. S.U. 149/L .. . :1G/L MG/L 'iG/L - .1!G/L . ._
- 250 1/ CAY l /.1K 1/' ilk 1/ iK 1/.iK 1/i;K I/MK I . . _ . . . . . . . . _ . . . . . . . . . . . . . . . . . . . _ . . . _ .
2 3
4 . . . _ . . . . _ . . . _ _ _ . . . . . . . . . .._. . _ . -
5 0. .
, 7 . . . . . . . . . . _ ._ . . _ _ . . _ . . .. ..... ... . .. ._ . . _ . .
O i
i 9 l0 ._. .. . . . . . . . . _ _ . . . . . _ _ _ _ _ . . - . . _ . . _ . . . . . . . _ .
> ~
- j g 12 C.
. 13 . _ . - - . - . . .. ... ._. . . - . . _ . . . _ . . . _ . . . . _ . . . . . . . - .
1/,
- 1 b 16 . . _ _ . . . . . . .. . . . . _ _ . . i 17 .
1 1: R e w* se e 19 . . . . . . . . _ . . . .. ...
l 20 1
21 22 . . . .
I 23 1 24 -
'j
- LD . . . . . . ..
.s 4). .Aa
.i 27 t ,= -.
t u, g
.'. Y
}
30 3 I . . . - . . ..
I f
4 6/
.T e 'J' ...I h eI g.(w%'.(#. . . '.
. O. f'J' C..
I t
A SIGN ATU RE OF RESP-).'!3I SLE OFFI CI AL h ,7 G=/*
J
. Ob1A ~<
e v r
a e.> e. , I n ., ,., - . e.
i.
,,,,,,) s/ c: r. .,. .: _ ., ,- 2
- c. e.) .. , 1 ,.) .
R 'd ? ') RT n I ' S 0 H A !? O E :' O U I T t) RI"G i\ } ,., .we n i. e r .aa Sg r.., , .e.
. a. a er e .) a.:-
r- es e.A..
F.i.a. . L c_: i a ..m- . u nt i.:.w.. .av. . m. . .o L, . .T AL-0921519 i V E l lii.: . 1980 .
.,..,.,e.- e asa r.. . .: w : v n,,,
- .. la-- da. L C L.g;n. . j 11. .w,. 1.,.n a r.>* *E"c.:
Fl.01 p:1 TSS T Pii')S O ?. G CU F2
- .'A TI
/. .' '; --- 6-9 30 1.0 15 1.0 1.0
--- 6-0 10J l.0 20 1.0 1.0
G/L "'VL s c. ! '.' 'GC S.U. "
2/L . ',G / L , "G/'
. W .O 1/r:AY l f iX 1/,1K 1/dK I/HK 1/'t!K I/JK i O.
2 s.
~5 7
3 U.
O, 11 I2 .
I S
b 1 A.
I7 1i '
i7 2) t 1
- ) ) .
23
- 4. * $
ee d' J
- ) "l' s.
.r. ., ,.
I
.u.f
[ .. . L . a .s .om..\
f
., J .4
.e. so..
$ . ' - A l
oj*
,,, ) 7'
. . . ., . . . m , , . , , , , ,, , ,
" ' ' ' " * * * -..e .
- o. w .,e.y.m..e.... . ,.%
ALA-BAMA WATER .C 0 M M I S'S I O N IMPR0VEMENT
)
DISCHARGE M 0 N 1 T 0 R ,1.N G R E P 0 R .T. . . . .. ._ _.,_
1 ALABAMA PONER COMPANY .'.. . . . . . _ . . . . . . .
I 1
FARLEY NUCLEAR POWER PLANT
. .. . . .AL-0024619... . . . . . . . .. . _..... .. __.... .
DECEMBER, 1980
~~'"~~' ' '~~ ~ ~~ ~ '
DISCHARGE 008 : METAL 'CL$AN'IN6 IIA'S'TES'~
DATE FLOW pH . .TSS. ..T PHOS 0&G .. CU_ . .. F E . .... ..
AVG ---
6-9' 30 1.0 15 1.0 1.0 MAX ---
6-9 100 1.0 20 1.0 1.0 UNIT MGD S.U. MG/L MG/L MG/L MG/L MG/L ~
FREO 1/ DAY
- I/dK 1/WK 1/dK 1/dK 1/dK 1/dK i . - .. . - - _ . . . . . .
3 4 . . . . . .. .. . .. .. . . . . .
6 O.
7 ~ ~ ' ' ' ' ' ' ~ ~ ' ' ' ' ' '
~ ~ ~ ' ' ' ~ ' ~ " ' ~ '
8 9
I0 . . . . . _ _ _ . _ . _ . . _ . . . . . . _. _ _ . . . . . . . _ _ _ , . , _ , . . . _ , , , ,
i1 ' ~~
i 12 13 0. . . . . . . . . . . . . .. . ... . . . . . . . . . . .
14 15 -
16 ... . . . . _ .
I7 18 19 ._
20 0. ,
21 22 ~
23 24 25 ' ~
26 27 0.
28 ~
29 30 31 .
AVG MO DISCHARGE SIGNATURE OF RESPONSIBLE OFFICIAL -,@ =- n E C. 6 dch ?.FeD4r.
r o Once a week t
...._...e ~e- m. ,-
y-------
pdem4 m d'M e am wwe 4 e neee *- e. . ,
i O l e
4 4 e ' 'l 4
1 1
- 1 O
t e
eq l
SECTION II CHEMICAL DISCHARGES f
00
- G 9
4 Gh.
._. . ._ .._ .. ~ ._ ._ _ . . - _ . , _ . . .
- II-CHEMICAL DISCHARGES }
L In accordance with Section 3.1.1(a)-1 of the Farley Environmental Technical Specifications, the following chemicals, -
which will be listed in FPC Form 67, were used in Unit No.1. operations-during 1980:. .
Sulfuric . Acid (93%)
Sodium Hydroxide (50%)
Hydrazine (35%), ,
Chlorine Ammonium Hydroxide .
t Nalsperse 7348 Dispersant, l k
4 h
f y a t
i P
i f
i g y -w-==v-mvv v v' t vr e q y 93 y.. ,,m.y ._,.,.g
4 SECTION III HERBICIDE APPLICATION ON TRANSMISSION LINE RIGHTS-0F-WAY This Section is submitted to fulfill the requirement of Section 3.1.1(b)-5 of the Environmental Technical Specifications for Farley fluclear Plant.
G i .
I l
l l
l t
i
.t f
4 l
t
o.
i III-Herbicide Application on Transmission Line Rights-of-Way I. Introduction In accordancs with Section 3.1.1(b)-5 of the Farley Environmental Technical Specifications .(ETS), .the purpose is to insure that the herbicide spraying program for rights-of-way maintenance does not result in any significant environmental impact due to either spray drifting out of the target area or the improper application of
. s pecific herbicides.
II. Discussion: ,
The use of herbicides on transmission line corridors associated with the Farley Nuclear Plant .was in accordance with the specifications contained in Section 3.1.1(b)-5 of the ETS.
There was no spray program associated with Farley to Pickard-South 230 Ky transmission line or the Farley to Webb to Pickard- -
230 Ky transmission line for the 1980 calendar year.
During the period May_30-June 1,1980, herbicide spraying operations were conducted on a portion of..the Farley to Snowdoun 500 KV trans-- .
mission line.. A total of 56.5 acres were sprayed using Tordon 101
~
a nd Garlon 3A which are EPA approved. l A record of the herbicide application is maintained in the South-east Division Office and is available for inspection.
III. Conclusion Utilization of herbicides was in accordance with Section 3.1.1(b)-5 o f the Farley ETS.
1 b
, , , ,,. r . . - -, - . . ~ ., , . ~ , - - ,-, .- v-., m..-... m +
4 SECTION IV MISCELLAtlE0VS REPORTS 4 As Required by Section 5.6.la., Part A flote: These reports were sent to EPA and/or AWIC as required by NPDES Pemit.
I i
P I
l
- I l
l l
l 1
ALABAMA POWER COMPAtlY 603 N O R T H 18T H S T R E ET - P. O. Bo x 2641 BIRMINCHAM. ALABAtAA 25291 - (205) 323-5341 January 10, 1980 Mr. James W.y W arr, Chief -
Alabama Water Improvement Commission Perry Hill Office Park 3815 Interstate Court Montgomery, Alabama 35109
Dear Mr. Warr:
Re: Farley fluclear Plant itPDES Permit flo. AL 0024619 In accordance with Part II.A.2 of the referenced permit, we a re submitting a report on a non-compliance that occurred as indicated by an analysis perfonned on January 3,1980, for the steam generator blowdown (discharge point 003). Analysis of the effluent showed an i ron concentration of 1.8 mg/1.
I The plant is continuing to recover from the extended outage which ended flovember 5,1979. During the first sixteen days of December, the unit underwent various tests and experienced equipment f ailures which resulted in a number of power escalations and reductions.
These unusual operating conditions are apparently the cause of this .
violation.
The iron concentration has dropped from 5.4 mg/l for the flovember sample to 1.8 mg/l for the December sample. The iron concentrations should continue to drop as the unit continues to recover from the extended outage.
Yours y truly ,
o(
! En v^ nmen t n Research Services FVB/y bec: fir. R. P. ItcDonald Mr. H. O. Thrash fir. W. M. Jackson lir. F. V. Brown File: T(7) 1305 /
H E L P i N G D EV E L O P A L A B A f.t A l
ALADAMA POWER COMPANY 600 N OR T H 1ST H ST R E ET - P. O. D ois 26 41 BIRMINGHAM, ALABAMA 35291 - (205) 323 5341 March 20, 1980 t
Mr. James W. ifarr, Chief Alabama Water Improvement Commission Perry Hill Office Park 3815 Interstate Court Montgomery, Alabama 35109
Dear Mr. Warr:
Re: Farley Nuclear Plant's NPDES Permit No. AL0024619 In accordance with Part II.A.2 of the referenced permit, we are t
submitting a non-compliance report for violations which occurred at the '
h Farley Nuclear Plant. During the period of March 8,1980, to March 11,
} 1980, approximately 300,000 gallons oT water were released from the metal cicaning waste holding pond, discharge point 008, into the Chattahoochee River. The iron concentration of this water was found to be 1.55 mg/l .
This non-compliance occurred because the heavy rain which occurred d0 ring this period cause'd the pond to overflow. To help prevent the recurrence:
of this violation, the height of the dam has been raised to give. increassd -
vol,ume in the holding pond.
The steam generator blowdown, discharge point 003A, was found f by analyses performed M February 27, 1980, to have an iron concentration
)
. of 3.01 mg/l and a copper concentration of 1.19 mg/l . This . non-complia nce j
was caused because Unit i has experienced several shutdowns recently, and
- air in-leakages which were reported early continue' t;o bea problem. As part of the Company's effort to eliminate these violat' ions, the Company is attempting to locate and repair these leaks.
If you have any questions, please call me.
Yours tr.uly,
);-t- / -7
./.,cs , Joh n E . Do rs e tt a General Manager, Power Generation Services FVB/y ,
H E L T I N G D CV EL0 P AL A D A M A
{,
.y z
4 .
.+ . ;
- ALADAMA POWER COMPANY SCO N OR T H 187 H STR E ET - P. o. Som 25 41 -
BIRMINGHAM, ALASAMA 35291 - (235) 323 5341 ,
Ray 16, 1980 - .
. . t
' Mr. James W. Warr, Chief ,
Alabama Water Improvement Commission '
Perry Hill Office Park '
3815 Interstate Court Montgomery, Alabama 36109 .
Dear Mr. Warr:
aRe: Farley Nuclear Plant .
JNPDES Pernit No. ALOO24619.
.In accordance with Part II.A.2 of the referenced' permit, we .
.are submitting a noncompliance report for a violation which occurred at the referenced plant. 'Ihe steam generator blowdown, discharge point 003B, was sampled on May 1,1980. The sample was analyzed on May 8.1980, and .
~
> vac found to contain iron at a concentration of 1.23 ppm.
~ . .; - Q .. ......;.x y :..
Unit two is presently undergoing a preoperational test.' During
- this test period, the cycling of the steam system temperature causes ".
. the iron oxide coating to break loose. The majority of this odde coating has 'pn on the interior surfaces of the steam generators since it was manusactured. This problem along with the difficulty of chemical control .
during cycling caused the noncompliance. The preoperational testing should be completed in May, 1980. '
.If you have any questions, please contet me.
Yours truly, j I
f#4 WVM C. 'BEdinger, Jr,.d, tandr Environmental ant /Research Services rvB/y bec: Mr. J. E. Dorsect Mr. H. O. Thrash Mr. O. D. Kings 1cy, Jr.
Dr. W. M. Jackson Mr. W. R. Bayne
, File: T(7) 1306 .
H E 1. PI N G .DEVEL0 P A 1. A D A M A.
j l ' -]
L, '
- Alabims Powtr Comp:ny - [ ~
600 North 18th Street '
Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 323-5341 '
i.
51 -
Alabama Power thesouthem electricsystem
)
- 0ctober 9, 1980 Farley Nuclear Plant l NPDES Permit No. AL0024619 l p
Mr. James W. Warr o Alabama Water Improvement Commission .
Public Health Services Building Montgomery,' Alabama 36130 .
Dear Mr. Warr:
j .
I L In accordance'with Part II.A.2 of the re0renced permit, we
- ! are submitting a noncompliance report for a ' violation which occurred 1
at the referenced plant. An analysis performed on September 19,.1980, indicated a concentration of 9.80 mg/l total iron and 1.59 mg/l total i copper for the Unit One Steam Generator. Blowdown (discharge point 003A) .
- As Mr. F. V. Brown discussed with Mr. J. P. Martin, the blowdown was to '
! be resampled before this noncompliance report was to be submitted. Upon resampling on September 27, 1980, the blowdown was found to have a concentration of 0.88 mg/l total iron and 0.14 mg/l copper.
! After reviewing the operation of the unit prior to sampling, 4
- we can detennine no apparent cause for the original values obtained.
The plant routinely checks for air inleakage and no abnormalities were observed. Based upon the data of the second sample and the state of the unit on September 19, 1980, we are forced to conclude that the sample analyzed was not indicative of the discharge for this point.
If you have any questions, please contact us.
- Very truly yours,
{ $ N 2 ft YD C. Biddinger, Jr., Manager
.l Environmental and Research Services l i p FVB:y d
c
1 . . ._ .- _ _ _
Alabama Power C mpany 600 North 18th street Post office Box 2S41 Birmingham. Alabems 35291 Telephone 205 323-5341 L
AlabamaPower the southerrt electnc sys:etn January 15, 1981 Farley Nuclear Plant '
NPDES Permit No. ALOO24619 Mr. James'W. Warr Alabama Water Improvement Comission 2721 Gunter Park Drive West Public Health Service Building Montgomery, Al 36130
Dear Mr. Warr:
~
In accordance with Part IIA 2 of the referenced peimit, we are submitting a noncompliance report for a violation which occurred at-the referenced plant. An analysis of a sample taken on November 4,1980 ;
indicated a concentration of 1.7 mg/l total iron for the Unit One !
Steam Generator Blowdown (discharge point 003A).
At the time of' the violation, the plant was experiencing slight '
fluctuations in reactor power. As a result' of these fluctuations, .
changing flow rates broke iron oxides from the walls of the piping and vessels within the steam supply system. The duration of this condition is not known; however, the plant was shut down November 7,1980 ,
]
for refueling. !
Following refueling, Unit I will be returned to full power operation. This steady operating condition should minimize the possibility 1 l
i
' of another violation. We regret the late reporting of this violation.
It was not discovered until the data was edited for the quarterly reports.
If you nave any questions, please contact us.
Very truly yours, f _
M) .
)
' v. Biddinger,gd e., Ma ger Environmental and nesearch Services I l SAJ:y 1
-