Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211K8411999-09-0202 September 1999 Proposed Tech Specs Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band ML20210J1431999-07-29029 July 1999 Proposed Tech Specs Changes to ITSs ML20209D3651999-07-0808 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage ML20209C2081999-06-30030 June 1999 Proposed Tech Specs Re Temporary Change to CTS Without Action to Reduce Power ML20195G0331999-06-11011 June 1999 Proposed Tech Specs Pages,Revising TS 3.7.1.6 & Bases by Modifying LCO to Require Four ARVs to Be Operable, Eliminating Use of Required in Action Statements & Adding New Action for Three or More ARVs Inoperable ML20195F7961999-06-10010 June 1999 Proposed Tech Specs,Revising Z,S & Allowable Value Terms for Current TS Table 3.3-4,functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) ML20206Q9041999-05-11011 May 1999 Proposed Tech Specs 3/4.7.5, Ultimate Heat Sink, Proposing Addl Required Zcaion for Restoring Ultimate Heat Sink to Operable Status within Completion Time of 8 H ML20196K7321999-03-26026 March 1999 Proposed Tech Specs Converting to Improved Tech Specs ML20205A2111999-03-25025 March 1999 Markups of Current & Improved TS Re TS Conversion Application ML20207J2021999-03-0505 March 1999 Proposed Tech Specs Re Conversion to ITS Section 1,0,3.1, 3.2,3.3,3.4,3.6,3.7,3.8,3.9,4.0 & 5.0 ML20199G7281999-01-15015 January 1999 Proposed Tech Specs SR 4.7.3b Deleting During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases ML20199F4511999-01-12012 January 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable ML20198P1211998-12-29029 December 1998 Proposed Tech Specs to Incorporate Revised Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV ML20197H6701998-12-0808 December 1998 Proposed Corrected Tech Spec Page 4.0-2 Increasing Spent Fuel Storage Capacity ML20196G6161998-12-0202 December 1998 Proposed Tech Specs Section 3.3, Instrumentation ML20196B4901998-11-24024 November 1998 Proposed Tech Specs Pages & follow-up Items Re Proposed Conversion to TS Section 1.0,3.4,3.5 & 3.6,per 980828 RAI ML20155H6841998-11-0606 November 1998 Proposed Tech Specs Pages,Revising TS Bases Section 3/4.4.4, Relief Valves ML20155H6121998-11-0606 November 1998 Proposed Tech Specs Bases 3/4.7.1.2 Re Afws ML20154S5721998-10-23023 October 1998 Proposed Tech Specs Section 3.5.1,increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour ML20154S5911998-10-23023 October 1998 Proposed Tech Specs Sections 3.1, Reactivity Control Sys, 3.2, Power Distribution Sys, 3.4, RCS, 3.5, ECCS & 5.0, Administrative Controls ML20154R9321998-10-20020 October 1998 Proposed Tech Specs 3/4.3,changing ESFAS Functional Units 6.f,8.a & 8.b ML20153H0431998-09-24024 September 1998 Proposed Tech Specs Pages Re RAI on Application for Amend to License NPF-42,incorporating Changes to TS Sections 3.4 & 5.0 ML20236Y2771998-08-0505 August 1998 Proposed Tech Specs Sections 3.1,3.2,3.5,3.9 & 4.0 Converting to Improved Std Tech Specs ML20236R4781998-07-17017 July 1998 Proposed Tech Specs 3/4.7.5 Revising UHS by Adding Temporary New Action Statement ML20236G8321998-06-30030 June 1998 Proposed Tech Specs Re Section 3.6, Containment Sys ML20247F8611998-05-0808 May 1998 Proposed Tech Specs 3/4.3.2,Table 3.3-3,revising Functional Unit 7.b.,RWST Level low-low Coincident W/Safety Injection, by Adding New Action Statement ML20216J8291998-03-20020 March 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity & Increasing Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235 ML20202C4561998-02-0404 February 1998 Proposed Tech Specs 3/4.3 Re Changes to ESFAS Functional Units 6.f,8.a & 8.b ML20202D1251998-02-0404 February 1998 Proposed Tech Specs 3/4.2.4 Re Quadrant Power Tilt Ratio ML20199H3551998-01-28028 January 1998 Proposed Tech Specs 6.3 & 6.12,reflecting Position Change within Organization ML20198P5001998-01-15015 January 1998 Proposed Tech Specs Replacement Pages Clarifying Bases in 970-902 LAR Re Auxiliary Feedwater Sys ML20198Q9411997-11-0606 November 1997 Proposed Tech Specs Bases Section 3/4.8.1,3/4.8.2 & 3/4.8.3 for Installation of Spare Battery Chargers ML20217K2181997-10-17017 October 1997 Proposed Tech Specs 4.5.2b,revising Surveillance Requirement to Vent ECCS Pump Casings ML20217B6161997-09-19019 September 1997 Proposed Tech Specs Bases Section B3/4.9.2,adding Info Re Role of Source of Power Supplied to One Source Range Neutron Flux Monitor in Determining Operability of Monitor in Mode 6 ML20216F7311997-09-0606 September 1997 Proposed Tech Specs,Alleviating Need for Enforcement Discretion Granted by NRC on 970905 ML20216F6911997-09-0505 September 1997 Proposed Tech Specs,Requesting NRC Exercise Discretion Re Compliance W/Srs 4.8.1.1.2.g.2)c)2,4.8.1.1.2.g.3)d) & 4.8.1.1.2.g.4)d) ML20216D1551997-09-0202 September 1997 Proposed Tech Specs,Adding Requirements for Essential Svc Water Flowpaths to turbine-driven AFW Pump ML20196J4071997-07-29029 July 1997 Proposed Tech Specs Revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation ML20141G7721997-07-0303 July 1997 Proposed Tech Specs Section 5.3.1 Incorporating Addl Info Into TS 6.9.1.9, Colr ML20154Q2441997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20151T0151997-05-15015 May 1997 Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs ML20195J8241997-05-15015 May 1997 Proposed Tech Specs Re Rev to Increase Spent Fuel Pool Storage Capacity ML20198J6551997-05-15015 May 1997 Proposed Tech Specs Re Response to RAI on Proposed Conversion to Ists,Section 3.8, Electrical Power Sys ML20138B9121997-04-23023 April 1997 Proposed Tech Specs,Revising TS 3/4.9.4 Containment Bldg Penetrations & Associated Bases Section to Allow Selected Containment Isolation Valves to Be Opened Under Administrative Controls During Periods of Core Alterations ML20137X3371997-04-15015 April 1997 Proposed Tech Specs 6.8.5.d Re Reactor Coolant Pump Flywheel Insp Program ML20147F8241997-03-21021 March 1997 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insp Program ML20137C2031997-03-19019 March 1997 Proposed Tech Specs Bases Pp Reflecting Corrections to Ref Made on Those Pp ML20137B9371997-03-18018 March 1997 Proposed Tech Specs,Revising TS Section 5.3.1,fuel Assemblies to Allow Use of Alternate Zr-based Fuel Cladding Matl ZIRLO ML20137B9141997-03-18018 March 1997 Proposed Tech Specs,Revising TS SR 4.5.2.c to Clarify When Containment Entry Visual Insp Is Required ML20134Q0811997-02-17017 February 1997 Proposed Tech Specs,Revising TS 1.7, Containment Integrity, TS 3/4.6.1, Containment Integrity & TS 3/4.6.3, Containment Isolation Valves 1999-09-02
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K8411999-09-0202 September 1999 Proposed Tech Specs Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band ML20210J1431999-07-29029 July 1999 Proposed Tech Specs Changes to ITSs ML20209D3651999-07-0808 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage ML20209C2081999-06-30030 June 1999 Proposed Tech Specs Re Temporary Change to CTS Without Action to Reduce Power ML20195G0331999-06-11011 June 1999 Proposed Tech Specs Pages,Revising TS 3.7.1.6 & Bases by Modifying LCO to Require Four ARVs to Be Operable, Eliminating Use of Required in Action Statements & Adding New Action for Three or More ARVs Inoperable ML20195F7961999-06-10010 June 1999 Proposed Tech Specs,Revising Z,S & Allowable Value Terms for Current TS Table 3.3-4,functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) ML20206Q9041999-05-11011 May 1999 Proposed Tech Specs 3/4.7.5, Ultimate Heat Sink, Proposing Addl Required Zcaion for Restoring Ultimate Heat Sink to Operable Status within Completion Time of 8 H ML20196K7321999-03-26026 March 1999 Proposed Tech Specs Converting to Improved Tech Specs ML20205A2111999-03-25025 March 1999 Markups of Current & Improved TS Re TS Conversion Application ML20207J2021999-03-0505 March 1999 Proposed Tech Specs Re Conversion to ITS Section 1,0,3.1, 3.2,3.3,3.4,3.6,3.7,3.8,3.9,4.0 & 5.0 ML20199G7281999-01-15015 January 1999 Proposed Tech Specs SR 4.7.3b Deleting During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases ML20199F4511999-01-12012 January 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable ML20198P1211998-12-29029 December 1998 Proposed Tech Specs to Incorporate Revised Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV ML20207J9621998-12-18018 December 1998 Rev 1 to TRM for Wolf Creek Generating Station,Unit 1 ML20197H6701998-12-0808 December 1998 Proposed Corrected Tech Spec Page 4.0-2 Increasing Spent Fuel Storage Capacity ML20196G6161998-12-0202 December 1998 Proposed Tech Specs Section 3.3, Instrumentation ML20196B4901998-11-24024 November 1998 Proposed Tech Specs Pages & follow-up Items Re Proposed Conversion to TS Section 1.0,3.4,3.5 & 3.6,per 980828 RAI ML20195E7671998-11-10010 November 1998 Rev 0 to EPP 01-2.4, Core Damage Assessment Guidance ML20155H6121998-11-0606 November 1998 Proposed Tech Specs Bases 3/4.7.1.2 Re Afws ML20155H6841998-11-0606 November 1998 Proposed Tech Specs Pages,Revising TS Bases Section 3/4.4.4, Relief Valves ML20154S5911998-10-23023 October 1998 Proposed Tech Specs Sections 3.1, Reactivity Control Sys, 3.2, Power Distribution Sys, 3.4, RCS, 3.5, ECCS & 5.0, Administrative Controls ML20154S5721998-10-23023 October 1998 Proposed Tech Specs Section 3.5.1,increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour ML20154R9321998-10-20020 October 1998 Proposed Tech Specs 3/4.3,changing ESFAS Functional Units 6.f,8.a & 8.b ML20153H0431998-09-24024 September 1998 Proposed Tech Specs Pages Re RAI on Application for Amend to License NPF-42,incorporating Changes to TS Sections 3.4 & 5.0 ML20236Y2771998-08-0505 August 1998 Proposed Tech Specs Sections 3.1,3.2,3.5,3.9 & 4.0 Converting to Improved Std Tech Specs ML20236R4781998-07-17017 July 1998 Proposed Tech Specs 3/4.7.5 Revising UHS by Adding Temporary New Action Statement ML20236G8321998-06-30030 June 1998 Proposed Tech Specs Re Section 3.6, Containment Sys ML20247F8611998-05-0808 May 1998 Proposed Tech Specs 3/4.3.2,Table 3.3-3,revising Functional Unit 7.b.,RWST Level low-low Coincident W/Safety Injection, by Adding New Action Statement ML20216J8291998-03-20020 March 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity & Increasing Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235 ML20202D1251998-02-0404 February 1998 Proposed Tech Specs 3/4.2.4 Re Quadrant Power Tilt Ratio ML20202C4561998-02-0404 February 1998 Proposed Tech Specs 3/4.3 Re Changes to ESFAS Functional Units 6.f,8.a & 8.b ML20199H3551998-01-28028 January 1998 Proposed Tech Specs 6.3 & 6.12,reflecting Position Change within Organization ML20198P5001998-01-15015 January 1998 Proposed Tech Specs Replacement Pages Clarifying Bases in 970-902 LAR Re Auxiliary Feedwater Sys ML20198Q9411997-11-0606 November 1997 Proposed Tech Specs Bases Section 3/4.8.1,3/4.8.2 & 3/4.8.3 for Installation of Spare Battery Chargers ML20217K2181997-10-17017 October 1997 Proposed Tech Specs 4.5.2b,revising Surveillance Requirement to Vent ECCS Pump Casings ML20217B6161997-09-19019 September 1997 Proposed Tech Specs Bases Section B3/4.9.2,adding Info Re Role of Source of Power Supplied to One Source Range Neutron Flux Monitor in Determining Operability of Monitor in Mode 6 ML20216F7311997-09-0606 September 1997 Proposed Tech Specs,Alleviating Need for Enforcement Discretion Granted by NRC on 970905 ML20216F6911997-09-0505 September 1997 Proposed Tech Specs,Requesting NRC Exercise Discretion Re Compliance W/Srs 4.8.1.1.2.g.2)c)2,4.8.1.1.2.g.3)d) & 4.8.1.1.2.g.4)d) ML20216D1551997-09-0202 September 1997 Proposed Tech Specs,Adding Requirements for Essential Svc Water Flowpaths to turbine-driven AFW Pump ML20196J4071997-07-29029 July 1997 Proposed Tech Specs Revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation ML20141G7721997-07-0303 July 1997 Proposed Tech Specs Section 5.3.1 Incorporating Addl Info Into TS 6.9.1.9, Colr ML20151T0151997-05-15015 May 1997 Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs ML20198J6551997-05-15015 May 1997 Proposed Tech Specs Re Response to RAI on Proposed Conversion to Ists,Section 3.8, Electrical Power Sys ML20154Q2441997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20195J8241997-05-15015 May 1997 Proposed Tech Specs Re Rev to Increase Spent Fuel Pool Storage Capacity ML20138F3371997-04-30030 April 1997 Rev 0 to Offsite Dose Calculation Manual ML20138B9121997-04-23023 April 1997 Proposed Tech Specs,Revising TS 3/4.9.4 Containment Bldg Penetrations & Associated Bases Section to Allow Selected Containment Isolation Valves to Be Opened Under Administrative Controls During Periods of Core Alterations ML20137X3371997-04-15015 April 1997 Proposed Tech Specs 6.8.5.d Re Reactor Coolant Pump Flywheel Insp Program ML20147F8241997-03-21021 March 1997 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insp Program ML20137C2031997-03-19019 March 1997 Proposed Tech Specs Bases Pp Reflecting Corrections to Ref Made on Those Pp 1999-09-02
[Table view] |
Text
- - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ . - _ _ . . - _ _ _ _ _
s- Plant Manager o
r-i n
M m
m n .
s -Super of Maint -Supt of Operations -Supt of Tech Supp -Supt of Plant Supp -Supt of Regulatory, c p Quality and Admin
- 5 -Maint Sves Supvr -Ops Coord - Ops -Reactor Eng Supvr ' -Fire Prot Spee* Services
! -4 '."~ . . E r. , [-Shif t Supervisor ' "- ^
' -;;!r :: ' ':: "n; Cp;e
".".M C::: S ue ..- -Supervising Opr - Ex ' :: ' ;; "- - -
""M 0;;;d Sup.- -Reactor Operator -l&C Supervisor Ct!:f cf Security
- 0:::::::m Cupa- -Station Operator - Er.;;..;;;/ Cse; S; ...i, Op; C ps -SedeteGpecialeet
! PA' ;;hs ;; A: -Utliity Helper lS O Ceu..:;.. :;; - L:; :.. ... .i
" F"?/ 'upr- -l0 0 Speciaiiss - S;;;;;;..; -6
":': :y "." ch -Ops Coord - Planning -;LC Touimician -O;;; ..
S!d;; Er:=2n and Projects '
- .
- .;, ;;o;po. --Sete-Emerg Planning i -Engineer / Spec ~&eed-Computer Eng - C ; ; . ."." m . . i G o ., . . ^'==-'st'-
-Maint Supp Supvr -Surv Coord -
[. ..!*;r- One C . A.m;,.;
- M.e.c,_h,frtspus
.....- 2 t e ;: - . a .;lj n
[- ^C:.. ;; ."::;;::---
. .:r ' As.; 3.p. Con.p Gp. -Document Cont Sw
-_r__'.....
-......o.,...
"." ;;; . a . .; c
-4ike Chemistry C;mpe::: Ope. ".. ., .. . - ~ . Opr m '
8 C h.. . ... ;. i Sups ?.:n 0;pr Sy: e' eft: c, n i .-W;.i, ;;;pr -::;'/Ciion. Toui. -0Z; 0;.T.... [..v. Spec- - Administrative Sepve-
-Electrical Sepv --Utmei ': :go. --Comp Sye Tech -'"'--5
- [' 5 ; u .;;e i Uf":y 9?pr C:::';
hHealth Phys' l "":Sup;. .;;;; -Results Ena Seewe-
- F/Ciiem sech "r:r't E ;; !*'!
- - U;.l.;p .'
- :'; : "cre!!: En;; lE)
S4e o Oa C.kt,J Rc r revisej gess; n , *For technical matters of an immediate nature the respective individual reports directly to the Plant Manager.
' #This position requires an SRO License.
8505140206 DR 8505 " '
ADOCK 05000 82 PDR i
a F h
i IUNPMH GR apt. of -apt. of myalenty, 02dity
-apt. of Maritmare -apt. of Qxrtims TEdnEal agxrt -apt. Of Plmt Saxrt arl Muhhtrtive ServiCEE
-Maint Sayiaes Spr -qs (hwrl - QE i & actor ByheEriy -Fire Protectbrf -Bragmcy Planh3
-Stift SPEEVNCE
-Maht Snxrt apr -apavisiry Qr -Irstnnet & Ontrols -Seaarity* D00aDEnt Ontrol
- M Ifi m bal &rtzr Qr tas
- nmtrbal -Utility Iblev asults Buiariy Mainstrtim histry
-qs (hwrlipdxr -
PlamirJM &alth Rijsis*
-BrjrApacialst
-arveillalce (hwr1
- Rr tidnbal mttas of m imodlate nature tiu repective irlivillal reprts dirmtly to the Plmt Mmayr.
- Ihh pcsition rapirES m SD lI3MO.
FIGIE 6.2-2 thit Otgmiztin
-Justification for changes to Technical Specifications 4.5.3.2 footnote and 4.1.2.3.2 footnote.
These changes will allow the switchover of fluid system trains without being forced into an ACTION statement. These changes are acceptable for'the following reasons:
- 1. The addition to the footnote allows operation with 2 charging pumps for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> provided 2 cold overpressure mitigation systems are operable (e .g. , two PORV's or two RHR suction relief valves). One PORV or RHR suction relief valve can adequately relieve the capacity of one charging pump. Requiring two systems to be operable ensures that the capability of two charging pumps can be relieved assuming no single failure.
- 2. The action of switching over to the opposite train is of a short duration and is a controlled evolution (the technical specification allows 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to accomplish the switchover). During the switchover the operator will be monitoring the systems affected by the switchover and should notice abnormalities of operation and be able to take appropriate corrective action, hence minimizing the need for automatic miti-gation.-
- 3. The short duration required for the switchover and allowed by technical specifications minimizes the possibility of an initiating event and a single failure occurring in conjunction with the switchover. The act of running a second charging pump is not considered an initiator since the evolution is monitored and controlled and total charging flow will be maintained consistent with system charging requirements by regulation of charging flow.
KG&E requests these changes to be incorporated into Wolf Creek's Technical Specification for issue with the full power license.
. ~
EMERGENCY CORE COOLING SYST5MS SURVEILLANCE REOUIREMENTS s
4.5.3.1 The ECCS subsystem shall be demonstrated OPERABLE per the applicable requirements of Specification 4.5.2.
4.5.3.2 All centrifugal charging pumps and Safety Injection pumps', except the above allowed OPERABLE pumps, shall be demonstrated inoperable
- by verifying that the motor circuit. breakers are secured in the open position within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after entering MODE 4 from MODE 3 or prior to the temperature of one or more of the RCS cold legs decreasing below 325*F whichever comes first, and at least once_per 31 days thereafter.
N '
- An inoperable pump may be energized for testing or for filling accumulators provided the discharge of the pump has been isolated from the RCS by a closed isolation valve with power removed from the valve operator, or by a manual isolation valve secured in the closed position, rm M eb.wy3 p-ps.,,way be cPettn%G 4e w Vo Fwo 00 hw' prov4J A*. p ru.w< as c f spec.bw kco
.3.4,9. 3 et<e $ dis {.e d wi#c~f re/mee co ne[ca s/n/emed5.
WOLF CREEK - UNIT 1 3/4 5-8
REACTIVITY CONTROL SYSTEMS CHARGING PUMP - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 One centrifugal charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency power source. ,
APPLICABILITY: MODES 4, 5, and 6.
ACTION: [ '
With no centrifugal charging pump OPERABLE or capable of being powered from an OPERABLE emergency power source; suspend all operations involving CORE ALTERATIONS or positive reactivity changes.
s SURVEILLANCE REQUIREMENTS
}
4.1.2.3.1 The above required centrifugal charging pump shall be demonstrated OPERABLE by verifying, on recirculation flow, that the pump develops a dif-ferential pressure of greater than or equal to 2400 psid when tested pursuant to Specification 4.0.5.
4.1.2.3.2 All centrifugal charging pumps, excluding the above required OPERABLE pump, shall be demonstrated inoperable
- at least once per 31 days, except when the reactor vessel head is removed, by verifying that the motor circuit breakers are secured in the open position.
- An inoperable pump may be energized for testing or for filling accumulators provided the discharge of the pump has been isolated from the RCS by a closed isolation valve with power removed from the valve operator, or by a manual isolation valve secured in the closed position. T*wo c6seg.~3 paps .my be OPER A BLG for wp 40 +Wo (0 b6ues prov,Jed Me. p ru e.M c,,,5 ef S pe ci O t** d se, 3.*f.q. 4 si,re. Qid.e d w a + b.d .-e6t=c.e. c., .tcAN., A h me d s.
WOLF CREEK - UNIT 1 3/4 1-9
,.