Similar Documents at Salem |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0261998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 1.With 990115 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr ML18106A9831998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 2.With 981214 Ltr ML18106A9801998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 1.With 981214 Ltr ML18106A9641998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 2. with 981112 Ltr ML18106A9631998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 1. with 981112 Ltr ML18106A9151998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 2.With 981012 Ltr ML18106A9131998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 1.With 981012 Ltr ML18106A8751998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Generating Station,Unit 2.With 980915 Ltr ML18106A8741998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Unit 1.With 980915 Ltr ML18106A8161998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 1. W/980817 Ltr ML18106A8151998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 2. W/980817 Ltr ML18106A7151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 2. W/980715 Ltr ML18106A7141998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 1. W/980715 Ltr ML18106A6541998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 1. W/980615 Ltr ML18106A6531998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 2. W/980615 Ltr ML18106A6121998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Generating Station,Unit 1.W/980515 Ltr ML18106A6111998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Unit 2. W/980515 Ltr ML18106A5561998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem,Unit 1. W/980415 Ltr ML18106A4591998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem Unit 2. W/980415 Ltr ML18106A3771998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 1.W/980316 Ltr ML18106A3761998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 2.W/980316 Ltr ML18106A3281998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 2. W/980217 Ltr ML18106A3271998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 1. W/980217 Ltr ML18106A2721997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem,Unit 2. W/980115 Ltr ML18106A2711997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem Generating Station,Unit 1.W/980115 Ltr ML18106A2081997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 1. W/971212 Ltr ML18106A2071997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 2. W/971212 Ltr ML18102B6811997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 2.W/ 971117 Ltr ML18102B6801997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 1.W/ 971117 Ltr ML18102B6271997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Salem,Unit 2. W/971015 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A5031999-08-26026 August 1999 LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr ML18107A5201999-08-12012 August 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF). ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4691999-07-28028 July 1999 LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr ML18107A4441999-07-0606 July 1999 LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr ML18107A4211999-07-0202 July 1999 LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr ML18107A4331999-07-0101 July 1999 LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr ML18107A4321999-07-0101 July 1999 LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr ML18107A5211999-07-0101 July 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF). ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3951999-06-17017 June 1999 LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr ML18107A3661999-06-0909 June 1999 LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr ML18107A3551999-06-0202 June 1999 LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML18107A3541999-06-0101 June 1999 LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2931999-05-12012 May 1999 LER 99-002-00:on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With 990512 Ltr ML18107A2781999-05-10010 May 1999 LER 99-004-00:on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With 990505 Ltr ML18107A2791999-05-0404 May 1999 LER 99-003-00:on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With 990504 Ltr ML18107A2741999-05-0303 May 1999 LER 99-002-00:on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With 990504 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A3151999-04-30030 April 1999 Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1 ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A2351999-04-23023 April 1999 LER 99-001-00:on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With 990423 Ltr ML18107A2881999-04-0707 April 1999 Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18106B1471999-03-29029 March 1999 LER 99-001-00:on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with 990329 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0701999-02-16016 February 1999 LER 98-015-00:on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With 990216 Ltr ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML20205P1671999-01-31031 January 1999 a POST-PLUME Phase, Federal Participation Exercise ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML18106B0491999-01-28028 January 1999 LER 98-007-01:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With 990128 Ltr ML18106B0401999-01-18018 January 1999 LER 98-016-00:on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With 990118 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr 1999-09-30
[Table view] |
Text
"
I
, JAVERAGE DAILY 1 UNIT. POWER LEVEL'- ,
Docket No.- 50-311 J
Unit.Name Salem # 2 Date -Nov. 10,1984 Completedtby. J.'P. Ronafalvy Telephone 609-935-6000
. Extension '4455 Month October 1984 Day Average Daily Power Level Day Average Daily Power: Level (MWe-KET) (MWe-NET) 11' 966 17 -0 2 1105 18 0 3 1102 19' O 4 588 20 0:
5 0 21 0-6 0 ~ 22 0 7 0 23 'O 8 0 24 0-4 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 Pg. 8,1-7 R1 8411210326 841031 '
DR ADOCK 05000 g v- f
~
Ill
.Page 2.of 12 'l
.. ~ . . . . _ _ _ _ - . . _ , - ._ _ - . . . . . , , - - . . , , _ . .
. OPERATING DATA REPORT Docket No. 50-311 Date Nov. 10,1984 Telephone 935-6000 Completed by J. P. Ronafalvy Extension 4455 Operating Status
- 1. Unit Name Salem No. 2 Notes
- 2. Reporting Period October 1984
- 3. Licensed Thermal Power (MWt) 3411
- 4. Nameplate Rating (Gross MWe) 1162
- 5. Design Electrical Rating (Net MWe) 1115
- 6. Maximum Dependable Capacity (Gross MWe)1149
- 7. Maximum Dependable Capacity (Net MWe) 1106
- 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
- 9. Power Level to Which Restricted, if any (Net MWe) N/A
- 10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
- 11. Hours in Reporting Period 745 7320 26761
- 12. No. of Hrs. Reactor was Critical 81.2 3386.0 15094.6
- 13. Reactor Reserve Shutdown Hrs. 0 1442.9 3533.6
- 14. Hours Generator On-Line 81.2 3194.8 14612.1
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (Mim) 276166 10255964 43727036
- 17. Gross Elec. Energy Generated (MWH) 94330 3409360 14277650
- 18. Net Elec. Energy Generated (MWH) 84749 3206994 13524242
- 19. Unit Service Factor 10.9 43.6 54.6
- 20. Unit Availability Factor 10.9 43.6 54.6
- 21. Unit Capacity Factor (using MDC Net) 10.3 39.6 45.7
- 22. Unit Capacity Factor (using DER Net) 10.2 39.3 45.3
- 23. Unit Forced Outage Rate 89.1 56.4 36.9
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
N/A
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
4-85
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved Initial Criticality 6/30/80 8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81 8-1-7.R2 Page 3 of 12
r E
E UNIT SHUTDOWN AND FOWER REDUCTIONS Docket No. 50-311 REPORT MONTH October 1984 Unit Name Salem No.2 .
1 Date Nov. 10,1984 J.P. Ronafalvy Telephone 609-935-6000 g Completed by 4455-Extension 7 Method of Duration Shutting License Cause and Corrective E Action to No. Date Type Hours Reason Down Event System Component Reactor Report- Code 4 Code 5 Prevent Recurrence L 1 2 HA GENERA Stator Windings84-300 10-04 F 663.7 A 3 -
?
J h
N s
E t
=
r 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 A-Equipment Failure-explain 1-Manual Instructions Salem as i F: Forced 2-Manual Scram. for Prepara- Source S: Scheduled B-Maintenance or Test
' C-Refueling 3-Automatic Scram. tion of Data
" D-Regulatory Restriction 4-Continuation of Entry Sh6ets y E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report P
G-Operational Error-explain 9-Other lLER) File H-Other-explain (NUREG 0161) 5
$ m El a
b o
I C
. u 1 l MAJOR PLANT MODIFICATIONS DOCKET NO.: 450-311 REPORT MONTH OCTOBER'1984 UNIT NAME: Salem 2 I' ATE: November 10, 1984 C OMPLETE) BY: J. Ronafalvy TELEPHONE: 609/935-6000 X4455-
- DCR NO. PRINCIPLE SYSTEM SUBJECT
/
2SC-1332 Chilled Water Install'an additional suction gattge no greater than 40 PSI for-21 and 22 Chilled Water
~ Pumps.
'l t
Page 5 of 12_ ,
, , e - -- - - - , , - - . . . -- r ,--
- v. _ . '.
MAJOR PLANT MODIFICATIONS- . DOCKET NO.: 50-311 REPORT MONTH OCTOBER 1984 UNIT.NAME: Salem 2 DATE: November 10, 1984-COMPLETED BY: J. Ronafalvy
-TELEPHONE:- 609/339-4455 DCR NO. -10CFR 50.59 SAFETY EVALUATION
- 2SC-1332' This change takes into account the ASME. Section' XI recommendations for the gauges to be no.more-- than four (4) times the reference value. No unreviewed safety or environmental questions are involved.
- ' Design Change Request t
h .
4 i
i 1
1 1
l l
i-Page 6 of 12
- m. . - -
3 7
PSE&G SALEM GENERATING STATION ..
J SAFETY RELATED WORK ORDER LOG .
SALEM' UNIT 2, WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 942842 SIC COMMON R45'S FAILURE DESCRIPTION: CHANNEL INDICATORS FAIL;-PRINTERS INDICATE TRANSIENT.
ERRORS CORRECTIVE ACTION: RE-ENTERED FILE PARAMETERS FOR UNIT 1; REPLACED' LIMIT SWITCH AND Q8 ON CSM PL BOARD 2R4SB- _
0099128268 SIC 2 AIRLOCK SEAL FLOW INDICATOR (100' EL.)
FAILURE DESCRIPTION: IMPROPER FUNCTION DURING' SURVEILLANCE-TESTING CORRECTIVE ACTION: IMPROPER PLACEMENT OF BLOCKING TAG (CORRECTED) 0099098776 SIC 2 N-44
' FAILURE DESCRIPTION: N-44 SPIKES' PERIODICALLY CORRECTIVE ACTION: REPLACED GAIN POT. AND RESET DRAWER 009908397 SIC 2 EXCORE POWER RANGE CHANNELS FAILURE DESCRIPTION: DELTA'I CALIBRATION REQUIRED m
j CORRECTIVE ACTION: REPLACED MODULE 20M CAPACITORS o
,y 0099099187 SIC 2 CHANNEL 2R12B o.
m FAILURE DESCRIPTION: NO_ INDICATION.IN CONTROL ROOM-CORRECTIVE ACTION: LOCAL CONTROLLER' SEAT: RING ADJUSTED REPLACED THUMBWHEEL
- i
J h
-SALEM UNIT 2' .
WO NO DEPT UNIT EQUIPMENT IDENTIFICATION -
009902081
- SIC 2 NO. 22 LOOP Tave INDICATOR FAILURE DESCRIPTION
- ERRATIC READINGS CORRECTIVE ACTION: REPLACED AMP BOARD AND. MOTOR MOVEMENT 5AND f RECALIBRATED.
e 0099024713 SIC 2 2R12B i FAILURE DESCRIPTION: CHANNEL APPEARS FAILED CORRECTIVE ACTION: NEW PINS INSTALLED; SETPOINTS. ADJUSTED' 0099099217 SIC 2 OVERPOWER RECORDER CHANNEL N-43 FAILURE DESCRIPTION: CHANNEL CONTINUALLY. FAILS AT 120% POWER' CORRECTIVE ACTION: REPLACED-SERVO ASSEMBLY AND RECALIBRATED
! 84-08-24-001-3' SMD- 2 NO. 23 CHARGING PUMP FAILURE DESCRIPTION: CONSTANT OVERFLOW FROM THE SEAL WATER' TANK-CORRECTIVE ACTION: REPACKED #3 CYLINDER l.m 84-09-28-061-2 SMD 2 23 ACCUMULATOR PRESSURE ' ALARM i j-a FAILURE DESCRIPTION: ALARM IS SOUNDING WITH-SATISFACTORY PRESSURE; co S CORRECTIVE ACTION: REPLACED CARAST 2 IN RACK 111 AND 112-t
^'
- m y--.
y.
. SALEM. UNIT 2 - <
v.:
JWO NO - DEPT UNIT EQUIPMENT IDENTIFICATION
. . ~
0099100002 SIC 2 22 S/G PRESSURE CHANNEL II FAILURE DESCRIPTION: READING LOWER THAN OTHER CHANNELS CORRECTIVE ACTION: RECALIBRATED.PRESSURELINDICATORS FOR-CHANNELS 1, 2, AND 3 84-09-14-021-7 SIC 2 21 S/G STEAM FLOW CHANNEL I FAILURE DESCRIPTION: SPIKE OCCURS SOMETIMES CAUSING THE FEED' REG.iVALVE TO GO FULL OPEN REPLACED RELAY FX512A- '
CORRECTIVE ACTION: -
84-09-13-021-1 ~
. SIC 2 24 LOOP Tave FAILURE DESCRIPTION: READING LOW.
CORRECTIVE ACTION: REPLACED RELAY TX412AB-IN RACK-'126- .
84-09-12-079-1 "
SIC- 2 #22 FAN COIL LEAK DETECTOR
~
FAILURE DESCRIPTION: 2LC731A/B OUT OF SPEC.
CORRECTIVE ACTION: REPLACED C2 AND C3; PERFORMED - 2IC-2'.10.'169.'
r
-m j 84-05-30-592-1 ,
o SIC 2 NIS N-42 FAILURE' DESCRIPTION: CONTROL ROOM. INDICATION 6%'> IR'S g CORRECTIVE ACTION: REPLACED PCB;" INDICATOR RECALIBRATED-
-w K.
s u_____ __m ____ _ _ _ _ _ _ - _. - _ *
. - . . . . ..- --._- - . . ..-.....,.---.~.
.-._ .- - - - . - . . . . - . ~ . . - . . ..
. , - . . ~ -.
.!W- ^f!
I
^ SALEM: UNIT-2 N . .. '
4
'(-
i EQUIPMENT IDENTIFICATION-WO NO DEPT UNIT 84-09-29-027 SMD- 2 26 SERVICE WATER PUMP PIPING ,
FAILURE DESCRIPTION: PIPE ELBOW HAS A LEAK-
+
s.
CORRECTIVE ACTION: REPLACED SPOOL' PIECE-l 009900264-7 ,
1 SMD 2 21 COMPONENT COOLING PUMP :
FAILURE DESCRIPTION:- OUTBOARD SEAL LEAKING', n.
- t CORRECTIVE ACTION
- REBUILT OUTBOARD SEAL- 3 i
0099100614 u.
SMD 2 21 COMPONENT COOLING PUMP .
! FAILURE DESCRIPTION: INBOARD BEARING LEAKS OUT l
CORRECTIVE ACTION: REPL' ACED OUTBOARDLBEARING- -
0099099616 4 SMD 2 ' #11. SERVICE WATER PUMP STRAINER ^
i
! FAILURE DESCRIPTION: PACKING LEAK
~ ~'
CORRECTIVE' ACTION: REPACKED AND REPLACED PACKING GLAND- - ,-
i l
4 1 m. '
1 LQ ~ ,
4 O 'b O
m..
.p PJ 4 .. --
4
. . -, . , . - . . - . , , . . - ~ - ~
.~ .
1 SALEM GENERATING STATION-MONTHLY OPERATING
SUMMARY
- UNIT NO. 2 OCTOBER 1984 Unit No. 2 began the period operating at full power. It remained at full power until 10/04/84 when, at 0915 hours0.0106 days <br />0.254 hours <br />0.00151 weeks <br />3.481575e-4 months <br />, the Unit tripped as a result of generator differential relay protection actuation. Mode 5 was entered on 10/05/84 at 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />. Investigations to determine the extent of damage to the Generator were conducted. A high potential test was performed indicating distress in the Phase C windings in addition to the failed coil behind the header box in the Phase A winding. Due to the extent of damage to the Generator, it has been decided to replace'the generator with the General Electric Generator originally intended for Hope Creek Unit 2. This decision will result in an expected return to service for No. 2 Unit- on April 1, 1985. The Unit will be refueled during this outage.
Sixty-eight (68) new fuel assemblies will' arrive on site by 11/29/84.
The Component Cooling Water System has been dechromated and released for inspections and work. Jul outage on "C" Vital Bus is in progress.
The Reactor Coolant System has been depressurized. As a result of MSR inspections, work similar to that performed during'the last Unit 1 outage will be required. The No. 22 Service Water Header outage was commenced. On 10/23/84, the Annual Emergency Exercise was conducted testing the emergency preparedness capabilities of PSE&G and outside agencies.
1 1
i l
l I
Page 11 of 12 l
I #. .L , , _
m.
s REFUELING INFORMATION DOCKET.NO.: 50-311~
COMPLETED' BY:- J. Ronafalvy UNIT-NAME:- Salem 2 DATE: ' November 10,-1984
. TELEPHONE: J 609/935-6000
. EXTENSION : : 4455 Month -October 1984
.l. ~ . Refueling information has changed from 'last month:
YES X NO 2..- Scheduled date for next refueling: -October-4, 1984
- 3. Scheduled date for: restart following re. fueling:'. Apri101, 1985-4.. A) Will Technical Specification changes or other license amendments be required?- .
YES- X *- NO B) Has the reload tuel_ design been reviewed by the Station'
. Operating Review Committee?
YES NO X*
If no, when is it scheduled? December 1984
- 5. Scheduled date (s) for. submitting proposed licensing action:
December 1984 (if additional submittal is required) *
- 6. Important licensing considerations associated with refueling:
NOME
- 7. Number of Fuel Assemblies:
A) Incore 193 B) In Spent Fuel Storage 72.
- 8. Present licensed spent fuel storage capacity:- 1170 Future spent fuel storage capacity: 1170
- 9. Date of last refueling that can be discharged to spent fuel pool. assuming the present licensed capacity: March 2004 8-1-7.R4
- A request for- Technical Specification change that is required for Salem.2 Cycle 3 operation was transmitted to the NRC in our~ letter dated 10/15/84. The actual reload analysis for Cycle 3 is in progress and if further Technical Specification changes are required,.they will ' '
be submitted in December-1984.
r.
Page 12 of 12 )
I _ . , - - , , , - . . . - . . - . , . - , , . . - . , , . - , . _ . - - - , . - . - . . . -
j IF'!!ilBit i (l") l Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station gg4 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of October 1984 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders Operating Summary Refueling Intormation Sincerely yours, J. M. Zupko, Jr.
General Manager - Salem Operations JR:sbh cc: Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosure 8-1-7.R4 f.h l
\\
The Energy People 16 21T)(20W 1181