ML20065S245

From kanterella
Revision as of 12:24, 30 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Proposed Tech Specs Permitting Interim Increase in Spent Fuel Storage Capacity in Unit 1 Spent Fuel Pool from 2040 Fuel Assemblies to 2500 Fuel Assemblies
ML20065S245
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/06/1994
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20065S243 List:
References
NUDOCS 9405170231
Download: ML20065S245 (1)


Text