MONTHYEARML24185A0912024-07-0101 July 2024 Acceptance of LAR to Revise TS Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumptions in the Accident Analyses ML24116A2532024-04-25025 April 2024 Final Request for Additional Information for LAR to Revise SR 3.8.1.2 Note 3 (EPID: L- 2023-LLA-0135) ML24045A1502024-02-15015 February 2024 Verbal Authorization for Alternative Relief Request-09 ML24045A0862024-02-12012 February 2024 Final RAI for Alternative RR-09 ML23348A3472023-12-12012 December 2023 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Minnesota Regarding a Prairie Island Nuclear Generating Plant, Units 1 & 2, Amendment ML23335A1152023-12-0101 December 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Request for Additional Information LAR to Revise TS 3.7.8 Required Actions ML23312A0882023-11-0808 November 2023 Acceptance of Request to Revise Alternatives 1-RR-5-10 and 2-RR-5-10 ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23207A1962023-07-26026 July 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Requested Licensing Action Request to Revise Technical Specification 3.7.8 Required Actions ML23075A2802023-03-16016 March 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Relief Requests 1-RR-5-15 and 2-RR-5-15 to Use Subsequent ASME Code Edition and Addenda ML23065A0592023-02-27027 February 2023 NRR E-mail Capture - (External_Sender) Prairie Island Request for Pre-application Meeting for Proposed LAR to Change TS 3.7.8, Condition B Required Actions ML23018A2952023-01-18018 January 2023 Acceptance of Requested Licensing Action to Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) (EPID L-2022-LLA-0184) (Email) ML22167A0452022-06-16016 June 2022 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Request to Adopt TSTF-277 ML22166A4112022-06-15015 June 2022 NRR E-mail Capture - Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-08, PIV Leakage ML22160A6022022-06-0909 June 2022 NRR E-mail Capture - Draft Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, 24-Month Operating Cycle Amendment ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML22045A4972022-02-14014 February 2022 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Unit 2 - Acceptance of Alternative Request Alternative Related PIV Leakage Monitoring ML21347A0082021-12-10010 December 2021 NRR E-mail Capture - Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested License Amendment Standard Emergency Plan and Consolidated Emergency Operations Facility ML21321A0452021-11-10010 November 2021 Request for Additional Information: Prairie Island 24-Month Cycle Amendment Request ML21302A1252021-10-29029 October 2021 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action RTS Power Range Amendment ML21305A0102021-10-29029 October 2021 NRR E-mail Capture - Request for Additional Information Prairie Island Cooling Water Amendment ML21252A0152021-09-0202 September 2021 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Change in the Maximum Surveillance Intervals from 24 Months to 30 Months ML21252A0122021-08-30030 August 2021 NRR E-mail Capture - Request for Additional Information Amendment Request to Adopt TSTF-471 and 517-T for Prairie Island ML21133A2502021-05-13013 May 2021 NRR E-mail Capture - Prairie Island - Acceptance Review of TSTF-471 and TSTF-571-T ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20253A2782020-09-0909 September 2020 E-Mail Submitting Proposed New License Condition ML20254A1162020-09-0909 September 2020 Draft License Transmittal E-Mail ML20223A0632020-08-10010 August 2020 Email Shpo Comment Letter: Proposed License Amendment for the Prairie Island Independent Spent Fuel Storage Installation ML20192A1442020-07-0707 July 2020 NRR E-mail Capture - Request for Additional Information Prairie Island License Amendment Request to Adopt TSTF-505 ML20163A4282020-06-10010 June 2020 Email from MPCA Comment Letter - Prairie Island ISFSI ML20154K7632020-06-0202 June 2020 NRR E-mail Capture - Revision 2 to the Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20135G8212020-05-14014 May 2020 NRR E-mail Capture - Revision to the Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20112F4582020-04-21021 April 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Low Temperature Overpressure Protection ML20083F4202020-03-20020 March 2020 NRR E-mail Capture - Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20077L4632020-03-17017 March 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 -Acceptance of Requested Licensing Action Request to Adopt TSTF-529 ML20052C7582020-02-21021 February 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Westinghouse NSAL-09-05 and NSAL-09-05 ML20035F1552020-02-0404 February 2020 NRR E-mail Capture - Request for Additional Information Monticello and Prairie Island Alternative Requests to Adopt Code Cases N-786-3 and N-789-3 (Epids: L-2019-LLR-0078 and L-2019-LLR-0079) ML20022A1762020-01-22022 January 2020 NRR E-mail Capture - Prairie Units 1 and 2 - Acceptance of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements ML20021A1832020-01-21021 January 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2 ML19316A0172019-11-0101 November 2019 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Integrated Leak Rate Test Extension Request ML19253B9642019-09-10010 September 2019 NRR E-mail Capture - Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Relief Request Adoption of Code Case N-786-3 ML19233A0032019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Prairie Island Relief Requests 1-RR-10 and 2-RR-10 ML19193A0142019-07-0909 July 2019 NRR E-mail Capture - Acceptance of Prairie Island Nuclear Generating Plant, Units 1 and 2 Relief Request Nos. 1-RR-5-10 and 2-RR-5-10 Related to Reactor Vessel Inspection Intervals) ML19057A1652019-02-26026 February 2019 NRR E-mail Capture - Request for Additional Information Prairie Island 50.69 Amendment Request ML19057A4212019-02-26026 February 2019 NRR E-mail Capture - Acceptance of Prairie Island Reactor Vessel Capsule Removal Schedule Request ML19008A3562019-01-0707 January 2019 NRR E-mail Capture - Prairie Island Nuclear Generating Plant - Audit Plan Related to the License Amendment Request to Implement 10 CFR 50.69 ML18351A0142018-12-14014 December 2018 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Classification of Certain Fuel Handling Equipment ML18347A3282018-12-12012 December 2018 E-Mail from M. Krick/Sses SSES ISFSI (Conversation Held on December 12, 2018) ML18313A0832018-11-0707 November 2018 NRR E-mail Capture - Request for Additional Information Prairie Island NFPA-805 License Condition Modification Amendment Request ML18235A2982018-08-23023 August 2018 NRR E-mail Capture - Request for Additional Information Prairie Island TSTF-425 License Amendment Request 2024-07-01
[Table view] |
Text
PrairieIslandNPEm Resource From: Stacie Sakai Sent: Monday, July 28, 2008 5:33 PM To: 'Gene.Eckholt@xenuclear.com' Cc: Richard Plasse; Billy Rogers
Subject:
Scoping and Screening Audit Schedule and Documentation List Attachments: Prairie Island S&S Audit Schedule Rev 1.doc; Prairie Island Scoping Audit Documentation List.doc
- Gene, Attached is the schedule for the upcoming Prairie Island scoping and screening methodology audit schedules for August 4-8, 2008. Also attached is a list of documents that we will be reviewing on site.
If you have any questions, feel free to contact Bill Rogers at 301-415-2945 or myself at 301-415-1884.
Stacie Stacie S. Sakai Reactor Systems Engineer Engineering Review Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation 301.415.1884 Stacie.Sakai@nrc.gov 1
Hearing Identifier: Prairie_Island_NonPublic Email Number: 747 Mail Envelope Properties (A39E93AC528D144995E76C6AB82D5D9703549A0F93)
Subject:
Scoping and Screening Audit Schedule and Documentation List Sent Date: 7/28/2008 5:32:52 PM Received Date: 7/28/2008 5:32:00 PM From: Stacie Sakai Created By: Stacie.Sakai@nrc.gov Recipients:
"Richard Plasse" <Richard.Plasse@nrc.gov>
Tracking Status: None "Billy Rogers" <Billy.Rogers@nrc.gov>
Tracking Status: None
"'Gene.Eckholt@xenuclear.com'" <Gene.Eckholt@xenuclear.com>
Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 547 7/28/2008 5:32:00 PM Prairie Island S&S Audit Schedule Rev 1.doc 46586 Prairie Island Scoping Audit Documentation List.doc 40954 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Prairie Island Scoping and Screening Methodology Audit Schedule 8/4/08-8/8/08 Monday 8/4 A.M. ! 10:00 A.M. Entrance meeting, introductions, and audit logistics.
! Applicant presentation consisting of a general overview of the following topics:
- Technical references used for scoping and screening.
- Program tools used for LRA development.
- Implementing procedures and guidance.
- Training requirements and quality practices used during LR development (including audits and self assessments).
P.M. ! Scoping and Screening Methodology (a)(1) and (a)(3) - Detailed review of scoping and screening methodology, applicable to the mechanical discipline and using the main steam system as an example, including the following topics: implementing procedures; source information; identification of SSCs within scope; electronic databases; definition of safety-related; design bases events consideration; identification of intended functions; scoping boundaries and license renewal drawings; identification of SCs subject to AMR; and documentation of results in scoping and screening reports.
! Daily Review of Audit activities 1
Tuesday 8/5 A.M. ! Continuation of the Scoping and Screening Methodology (a)(1) and (a)(3) applicable to the mechanical discipline as required.
! Scoping and Screening Methodology (a)(1) and (a)(3) - Differences applicable to the structural discipline using the turbine building as an example.
P.M. ! Scoping and Screening Methodology (a)(2) - Detailed review of scoping and screening methodology, applicable to the mechanical discipline and using the main steam system as an example, including the following topics: implementing procedures and bases documents; source information; electronic databases; identification of SSCs within scope; development of scoping boundaries and license renewal drawings; identification of SCs subject to AMR; and documentation of results in scoping and screening reports.
! Daily Review of Audit activities.
Wednesday 8/6 A.M. ! Continuation of Scoping and Screening Methodology (a)(2) applicable to the mechanical discipline as necessary.
! Scoping and Screening Methodology (a)(2) - differences applicable to the structural discipline using the turbine building as an example.
! Scoping and Screening Methodology (a)(1), (a)(2), and (a)(3) applicable to the electrical/I&C discipline. Include review of fuse holders and tie wraps.
! Evaluation of consumables, plant insulation (mirrored, system, reactor vessel), overhead handling systems, and staged equipment/replacement parts, as applicable.
P.M. ! Sample review of residual heat removal system and screenhouse (breakout session).
! Plant tour to view examples of (a)(2) scoping boundaries including seismic anchors, equivalent anchors, and the potential for spatial interaction.
! Daily Review of Audit activities.
2
Thursday 8/7 A.M. ! Training activities associated with LRA development.
! Quality activities associated with LRA development.
! Aging management quality assurance elements (corrective actions, confirmation process, and administrative controls).
- Review of individual aging management programs quality assurance attributes - corrective actions, confirmation process, and administrative controls.
P.M. ! Continuation of A.M. activities, as necessary.
! 4:30 P.M. Pre-final brief with license renewal project team.
Friday 8/8 A.M. ! 9:30 A.M. Final briefing of audit activities and status.
3
Prairie Island License Renewal Scoping and Screening Methodology Audit Documentation List
! Engineering reports and procedures which contain requirements or guidelines for the implementation of scoping and screening methodology.
! 10 CFR 54.4(a)(1) plant evaluations and implementing procedures.
! 10 CFR 54.4(a)(2) plant evaluations and implementing procedures.
! 10 CFR 54.4(a)(3) plant evaluations, implementing procedures and any specific analyses performed.
! License renewal drawings.
! System design basis documents and system and component level scoping and screening reports for selected systems and structures: Main Steam, Residual Heat Removal, Turbine Building, Screenhouse.
! Description of the design basis events included in the UFSAR, and all other additional events (e.g. high energy line break, fire, high wind, earthquakes, flooding, tornadoes),
which were evaluated during the scoping process.
! Qualified equipment/component list (Q-List) and corresponding development process.
! Quality assurance program attributes used in license renewal process.
! Training lesson plans or descriptions provided to the applicant=s personnel for implementation of the license renewal process.
! Plant and industry operating experience used to determine the scope of 10 CFR 54.4(a)(2) SSCs.