MONTHYEARBYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) BYRON 2023-0029, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements2023-06-0101 June 2023 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements BYRON 2023-0022, 2022 Annual Radiological Environmental Operating Report (AREOR)2023-05-0404 May 2023 2022 Annual Radiological Environmental Operating Report (AREOR) BYRON 2023-0002, Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2023-04-0606 April 2023 Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements BYRON 2023-0012, Cycle 26 Core Operating Limits Report2023-03-16016 March 2023 Cycle 26 Core Operating Limits Report BYRON 2022-0081, CFR72.48 Evaluation Summary Report2022-12-0909 December 2022 CFR72.48 Evaluation Summary Report BYRON 2022-0072, Steam Generator Tube Inspection Report for Refueling Outage 232022-10-27027 October 2022 Steam Generator Tube Inspection Report for Refueling Outage 23 BYRON 2022-0069, 2021 Regulatory Commitment Change Summary Report2022-10-13013 October 2022 2021 Regulatory Commitment Change Summary Report BYRON 2022-0071, Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment2022-10-13013 October 2022 Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Final Causal Report and Description of Corrective Action Assignment BYRON 2022-0065, Registration of Use of Cask to Store Spent Fuel2022-10-13013 October 2022 Registration of Use of Cask to Store Spent Fuel BYRON 2022-0063, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report for September 9, 2021 to September 8, 20222022-09-29029 September 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report for September 9, 2021 to September 8, 2022 BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) BYRON 2022-0059, Registration of Use of Cask to Store Spent Fuel2022-09-15015 September 2022 Registration of Use of Cask to Store Spent Fuel BYRON 2022-0045, Day Inservice Inspection Report for Interval 4, Period 2, (B2R23)2022-07-15015 July 2022 Day Inservice Inspection Report for Interval 4, Period 2, (B2R23) BYRON 2022-0026, Annual Radiological Environmental Operating Report2022-05-0505 May 2022 Annual Radiological Environmental Operating Report BYRON 2022-0030, Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Report2022-05-0303 May 2022 Materials Reliability Program: Topical Report for Primary Water Stress Corrosion Cracking Mitigation by Surface Stress Improvement (MRP-335, Revision 3-A) Report BYRON 2022-0028, Cycle 24 Core Operating Limits Report2022-04-28028 April 2022 Cycle 24 Core Operating Limits Report BYRON 2022-0016, Annual Dose Report for 20212022-04-0707 April 2022 Annual Dose Report for 2021 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline BYRON 2021-0063, Reactor Coolant System Pressure and Temperature Limits Report2021-09-28028 September 2021 Reactor Coolant System Pressure and Temperature Limits Report BYRON 2021-0064, Cycle 25 Core Operating Limits Report2021-09-28028 September 2021 Cycle 25 Core Operating Limits Report BYRON 2021-0032, 2020 Annual Radiological Environmental Operating Report (AREOR)2021-05-0606 May 2021 2020 Annual Radiological Environmental Operating Report (AREOR) BYRON 2021-0031, 2020 Annual Radioactive Effluent Release Report2021-04-21021 April 2021 2020 Annual Radioactive Effluent Release Report BYRON 2021-0027, Annual Dose Report for 20202021-03-30030 March 2021 Annual Dose Report for 2020 BYRON 2021-0023, Registration of Use of Cask to Store Spent Fuel2021-03-25025 March 2021 Registration of Use of Cask to Store Spent Fuel BYRON 2021-0024, 2020 Regulatory Commitment Change Summary Report2021-03-19019 March 2021 2020 Regulatory Commitment Change Summary Report BYRON 2021-0001, Day Inservice Inspection Report for Interval 4, Period 2, (B2R22)2021-01-13013 January 2021 Day Inservice Inspection Report for Interval 4, Period 2, (B2R22) BYRON 2020-0087, National Pollutant Discharge Elimination System (NPDES) Permit No. IL00483132020-12-16016 December 2020 National Pollutant Discharge Elimination System (NPDES) Permit No. IL0048313 BYRON 2020-0084, 10 CFR 72.48 Evaluation Summary Report2020-12-10010 December 2020 10 CFR 72.48 Evaluation Summary Report BYRON 2020-0085, 10 CFR 50.59 Summary Report2020-12-10010 December 2020 10 CFR 50.59 Summary Report BYRON 2020-0067, Cycle 22 Core Operating Limits Report2020-10-20020 October 2020 Cycle 22 Core Operating Limits Report BYRON 2020-0063, Independent Spent Fuel Storage Installation - Transmittal of Annual Radioactive Effluent Release Repo2020-10-0101 October 2020 Independent Spent Fuel Storage Installation - Transmittal of Annual Radioactive Effluent Release Repo BYRON 2020-0053, Steam Generator Tube Inspection Report for Refueling Outage 232020-09-10010 September 2020 Steam Generator Tube Inspection Report for Refueling Outage 23 BYRON 2020-0025, Annual Dose Report 20192020-03-24024 March 2020 Annual Dose Report 2019 BYRON 2020-0015, Cycle 24 Core Operating Limits Report2020-03-17017 March 2020 Cycle 24 Core Operating Limits Report BYRON 2020-0010, Revision to Byron Station Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 172020-02-13013 February 2020 Revision to Byron Station Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 17 BYRON 2020-0008, 2019 Regulatory Commitment Change Summary Report2020-02-0707 February 2020 2019 Regulatory Commitment Change Summary Report BYRON 2019-0105, Post Examination Submittal Letter2019-11-26026 November 2019 Post Examination Submittal Letter BYRON 2019-0095, Registration of Use of Cask to Store Spent Fuel2019-10-10010 October 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0090, Registration of Use of Cask to Store Spent Fuel2019-09-18018 September 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0078, Registration of Use of Cask to Store Spent Fuel2019-08-22022 August 2019 Registration of Use of Cask to Store Spent Fuel BYRON 2019-0041, Revision to Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 162019-04-25025 April 2019 Revision to Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 16 BYRON 2019-0035, Submittal of 2018 Annual Radioactive Effluent Release Report2019-04-18018 April 2019 Submittal of 2018 Annual Radioactive Effluent Release Report BYRON 2019-0040, Cycle 22 Core Operating Limits Report2019-04-15015 April 2019 Cycle 22 Core Operating Limits Report BYRON 2019-0039, Annual Dose Report for 20182019-04-11011 April 2019 Annual Dose Report for 2018 BYRON 2019-0022, 2018 Regulatory Commitment Change Summary Report2019-03-13013 March 2019 2018 Regulatory Commitment Change Summary Report BYRON 2019-0015, Cycle 23 Core Operating Limits Report and Byron Station Unit 2 Cycle 21 Core Operating Limits Report2019-03-0707 March 2019 Cycle 23 Core Operating Limits Report and Byron Station Unit 2 Cycle 21 Core Operating Limits Report BYRON 2018-0130, Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22)2018-12-20020 December 2018 Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22) 2023-06-01
[Table view] |
Text
Byron Generating Station iE Exeton Generation www.exeloncorp.com February 27, 2015 LTR: BYRON 201 5-0026 File: 1.10.0101 (5A.101)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron tation, units 1 ana Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
Subject:
Response to Request for Additional Information (RAI) Regarding Pressure and Temperature Limits Reports (PTLRs), Byron Station, Units 1 and 2
References:
(1) Letter from F. A. Kearney (Exelon Generation Company, LLC) to U. S. NRC, Pressure and Temperature Limits Report (PTLR) for Measurement Uncertainty Recapture (MUR) Power Uprate, Byron Station, Units 1 and 2 dated February 13, 2014 (2) E-mail from J. S. Wiebe (U. S. NRC) to S. Gackstetter (Exelon Generation Company, LLC), RAI Regarding Pressure and Temperature Limits Reports (PTLRs), Byron Station, Units 1 and 2, dated January 29, 2015 In Reference 1, Exelon Generation Company, LLC, (EGC) provided the document Pressure and Temperature Limits Report (PTLR) for Measurement Uncertainty Recapture (MUR) Power Uprate, Byron Station, Units 1 and 2 to the Nuclear Regulatory Commission (NRC) in accordance with Technical Specifications 5.5.6 for Byron Station, Units 1 and 2.
In Reference 2, the NRC requested that EGC provide additional information to complete their review of the subject PTLR document (i.e., Reference 1). The NRC requested that EGC provide the requested information to the NRC on or before March 2, 2015.
The response to this request is provided in Attachment 1 to this letter. This letter contains no new regulatory commitments.
Should you have any questions concerning this matter, please contact Douglas Spitzer, Byron Regulatory Assurance Manager, at (815) 406-2800.
Respectfully,
/
7.
Fabe. Kea Site Vice President Byron Generating Station Attachment 1: Response to Request for Additional Information cc: NRC Regional Administrator, Region Ill NRC Senior Resident Inspector, Byron Station
ATTACHMENT 1 Response to Request for Additional Information Regulatory Basis Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix G requires that pressure-temperature (P-T) limits be developed to bound all ferritic materials in the reactor vessel (RV). Further, Sections I and IV.A of 10 CFR Part 50, Appendix G specify that all ferritic reactor coolant pressure boundary (RCPB) components outside of the RV must meet the applicable requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section III, Rules for Construction of Nuclear Facility Components.
As clarified in Regulatory Information Summary (RIS) 2014-11, Information on Licensing Applications for Fracture Toughness Requirements for Ferritic Reactor Coolant Pressure Boundary Components (ADAMS Accession No. ML14149A165), reactor vessel materials with the highest reference temperature may not always produce the most limiting P-T limits because the consideration of stress levels from structural discontinuities (such as nozzles) may produce a lower allowable pressure.
Request for Additional Information (RAI):
Describe how the P-T limit curves for Byron Units 1 and 2 consider all ferritic pressure boundary components of the reactor vessel that are predicted to experience a neutron fluence exposure greater than lxi 017 n/cm2 [n/cm
] (E> 1 MeV) at the end of the licensed operating period.
2 If the current P-T limit curves do not consider all ferritic pressure boundary components of the reactor vessel that are predicted to experience a neutron fluence exposure greater than lxi 017 2 (E> 1 MeV) at the end of the licensed operating period, provide appropriately revised P-T n/cm limit curves to the NRC as required by Technical Specification 5.6.6.
Response to RAI:
The P-T limit curves submitted in Reference 1 for Byron Units 1 and 2 incorporate all reactor vessel materials predicted to achieve projected neutron fluence values greater than lxi 0 2 (E> 1 MeV) prior to the end of the applicability term of the curves. As documented in n/cm Reference 1, the Byron Unit 1 P-T limit curves are applicable through 32 effective full power years (EFPY) and the Byron Unit 2 P-T limit curves are applicable through 30.5 EFPY.
The P-T limit curves contained in Reference 1 used fluence values calculated as part of the Measurement Uncertainty Recapture (MUR) power uprate evaluation. The neutron fluence values calculated at 32 EFPY for Byron Units 1 and 2 are summarized in Tables 1 and 2 of this Attachment, respectively. As shown in Tables 1 and 2, the materials predicted to achieve projected neutron fluence values greater than lxi 17 n/cm 2 at 32 EFPY include the nozzle shell, intermediate shell and lower shell forgings, as well as the nozzle shell to intermediate shell forging circumferential welds and the intermediate to lower shell forging circumferential welds at Byron Units 1 and 2. These materials have been included in the P-T limit curve assessment submitted in Reference 1.
Page 1 of 2
ATTACHMENT 1 Response to Request for Additional Information Table 1 Byron Unit 1 Calculated Neutron Fluence Projections at the Reactor Vessel CladlBase Metal Interface at 32 EFPY uence Reactor Vessel Material (11cm E 1.0_Me Outlet Nozzle to Nozzle Shell Welds (Lowest Extent) 5,OSEtl6 Inlet Nozzle to Nozzle Shell Welds (Lowest Extent) 670E-l6 Nozzle Shell Forging 5.98E+l8 Nozzle Shell to Intermediate Shell Foring (nc umferential Weld 5.98E+lS Intermediate Shell Forine l.7?E+19 Intermediate to Lower Shell Forging Circumferential Weld 1.72E+19 - -
Lower Shell Forging L77E÷19 Lower Shell Forging to Bottom Head Ring Circumferential Weld L72E+15 Table 2 Byron Unit 2 Calculated Neutron Fluence Projections at the Reactor Vessel Clad/Base Metal Interface at 32 EFPY (a)
Reactor Vessel Material Fluence (u/cm ,E-> 1.OMe)
Outlet Nozzle to Nozzle Shell Welds (Lowest Extent) 4,49 E 16 Inlet Nozzle to Nozzle Shell Welds (Lowest Extent) 5.92E16 Nozzle Shell Forging 5.49E18 Nozzle Shell to Intermediate Shell Forging Circumferential Weld 5 ,49E-- 18 Intermediate Shell Forging 1,76E19 Intermediate to Lower Shell Forging Circumferential Weld L7OE19 Lower Shell Forging L76E-19 Lower Shell Forging to Bottom Head Ring Circumferential Weld 1 ,59El 5 Note:
(a) Although the Byron Unit 2 P-T limit curves are only applicable through 30.5 EFPY, the 32 EFPY neutron fluence values can conservatively be used to determine the extent of the lxi 017 n/cm 2
fluence threshold.
References:
(1) Letter from F. A. Kearney (Exelon Generation Company, LLC) to U. S. NRC, Pressure and Temperature Limits Report (PTLR) for Measurement Uncertainty Recapture (MUR) Power Uprate, Byron Station, Units 1 and 2, dated February 13, 2014 (ADAMS Accession No.
ML14044A019).
Page 2 of 2