Final - Section a Operating Exam (Folder 3)
ML071410436
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 04/25/2007
From:
Division of Reactor Safety I
To:
Entergy Nuclear Operations, Vermont Yankee
Sykes, Marvin D.
Shared Package
ML062050096 List:
References
Download: ML071410436 (41)


Text

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title: Failure Mode:

Reference:

Task Number: 2020030201 Perform Reactor Coolant Temperature Check Temperatures out of spec for pump start OP 4110, Reactor Recirc System Surveillance, Rev 41 Task Performance:

AO/RO/SRO - RO/SRO X SRO Only - Sequence Critical:

Yes - No Time Critical:

Yes - No 3 Individual Performing Task:

Examiner:

Date of Evaluation: Activity Code:

Method of Testing: Simulation - Performance X Discuss Setting: Classroom

_. Simulator X Plant Performance Expected Completion Time:

15 minutes Evaluation Results: Performance: PASS - FAIL - Time Required:

Prepared by: Operations Training Instructor Date Reviewed by: SRO LicensedlCertified Reviewer Date Approved by: Operations Training Manager Date Directions:

Discuss the information given on this page with the operator being evaluated.

Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification.

If a step is preceded by an asterisk (*), it is a critical step.

If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure. i,, After providing the initiating cue, ask the individual "Do you understand the task?" Read to the person being evaluated: Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have. This JPM will be performed in the Simulator and you are to perform all actions.

You are requested to "talk-throuph" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task. Initial Conditions:

The plant is in Hot Shutdown with the Recirc Pumps secured.

ERFIS is available.

ca Initiating Cues: You have been directed by the CRS to complete the Reactor Coolant Temperature Check per OP 41 10 Section E in preparation for starting the idle Recirc Pump "A". Task Standards:

VYOPF 41 10.05 completed; identification that Recirc Pumps may not be started based upon temperatures. Required Materials:

OP 41 10, Reactor Recirc System Surveillance (latest revision)

VYOPF 41 10.05 (latest revision) Steam Tables Simulator Setup: Reset to IC 870 Ensure the following conditions are established with selected IC: 0 0 Recirc Pumps Secured 0 0 Plant in Hot Shutdown with steam dome pressure greater than 618 psig Insert mfPP-01 (failure of the ERFIS computer)

Insert override of PLC-2-166, RPV/SV/RV screen, CH.4) (ERFIS.PTS026)

Evaluation v Performance Steps TIME START: SATAJNSAT Step 1: Obtain procedure: review prerequisites, and Section E. Standard: OP 41 10 obtained; admin limits, prerequisites and Section E reviewed.

Interim Cue: If asked, all prerequisites are met. SAT/UNSAT CATAJNSAT SAT/UNSAT SATAJNSAT SAT/UNSAT Step 2: Standard:

Obtain copy of VYOPF 4110.05 Operator obtains copy of form. *Step 3: Identifv and record Recirc Loop A Temperature Standard: Operator identifies Recirc Loop A temperature on TR-2-165 (red pen) on CRP 9-4, and records temperature on form. *Step 4: Identifv and record Recirc Loop B Temperature Standard: Operator identifies Recirc Loop B temperature on TR-2-165 (blue pen) on CRP 9-4, and records temperature on form. *Step 5: Identifv and record reactor pressure Standard: Operator identifies reactor pressure on PI-2-56A or PR-6-96 (on CRP 9-5) and records on form. *Step 6: Identifv and record bottom head drain temperature.

Standard: Operator identifies bottom head drain temperature on PLC-2-166, RPV/SV/RV screen, CH.4 (ERFIS PT.S026), and records on form.

Evaluation Performance Steps SATAJNSAT

  • Step 7: Calculate saturation temperature.

Standard: Operator calculates saturation temperature using saturated steam tables.

Note: 14.7 psi must be added to the reactor pressure psig number to obtain psia number for use in steam tables. SATAJNSAT

  • Step 8: Determine and record difference between saturation temperature and vessel bottom head drain temperature Standard: Operator subtracts bottom head drain temperature from interpolated saturation temperature and records on form. SATAJNSAT
  • Step 9: Identifv difference between saturation temperature and bottom head drain temperature is greater than 145 deg F; inform CRS that pump may not be started Standard: Operator identifies that the temperature difference is greater than 145" F (-146"F), and in accordance with the Note on VYOPF 41 10.05, informs the CRS that the pump may &be started. Evaluator Note: If the operator did not add 14.7# to the pressure identified in step 5, then he would meet the requirement to start the pump with a delta T of -144°F. Since there is such a small margin (2°F) regardless of adding the 14.7# or not (based on instrument inaccuracies/tolerances

& interpolating the steam tables), the potential does exist that the candidate may come up with a differential temperature of 5145°F. The evaluator may use grade the performance of the candidate based on how he arrived to his conclusion. Interim Cue:

Inform the Operator that no further actions are necessary for this JPM.

Terminating Cue: Temperatures identified as not within limits for starting the Recirc Pumps; CRS informed Evaluator Comments:

System: 202001 WA: 2.1.7 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification: Title: Perform Shutdown CRO Rounds Failure Mode:

Reference:

Task Number: 2997230301 4 Out of Spec readings OP 0150, Conduct of Operations and Operator Rounds, Rev.169, LPC 1 Task Performance:

AO/RO/SRO - RO/SRO X SRO Only - Sequence Critical:

Yes - No 2 Time Critical:

Yes - No 3 Individual Performing Task:

Examiner:

Date of Evaluation: Activity Code:

%" Method of Testing: Simulation - Performance X Discuss Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 15 minutes Evaluation Results: Performance: PASS - FAIL - Time Required:

Prepared by: Operations Training Instructor Date Reviewed by: SRO LicensedKertified Reviewer Date Approved by: Operations Training Manager Date Directions:

Discuss the information given on this page with the operator being evaluated.

Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat".

Comments are required for any "Unsat" classification.

If a step is preceded by an asterisk (*), it is a critical step.

If a critical step is slupped or performed unsatisfactorily, then the individual has failed the Job Performance Measure. After providing the initiating cue, ask the individual "Do you understand the task?" Read to the person being evaluated: Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have. This JPM will be performed in the Simulator and you are to perform all actions. You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task. Initial Conditions:

The plant is in Cold Shutdown.

A Computer fault has rendered ERFIS inoperable. Troubleshooting is in progress.

Initiatinp Cues: You have been directed by the CRS to complete the 06-12 Shutdown CRO round sheet (VYOPFO150.04) on CRP 9-3 and CRP 9-4.

ERFIS & the ability to take electronic rounds are not available and manual log entries must be performed. Task Standards: VYOPF 0150.04 completed for CRP 9-3 and 9-4; identification of 4 out of spec readings.

Required Materials:

OP 0150, Conduct of Operations and Operator Rounds (latest revision) VYOPF 0150.04 (latest revision) Simulator Setup: Reset to IC 871 (malfunctions inserted for 00s readings)

Ensure the plant is in Cold Shutdown Performance Steps Evaluation TIME START: SATAJNSAT Step 1: Obtain procedure: review prerequisites, Section A. Standard:

OP 0150 obtained; admin limits, prerequisites and Section A reviewed.

Interim Cue: If asked, all prerequisites are met.

SATAJNSAT Step 2: Obtain COPY of VYOPF 0150.04 Standard: Operator obtains copy of form. Examiner Cue: Once the operator finds the form, provide them a copy. k SATAJNSAT

  • Step 3: Completes the log for panel 9-3 and 9-4 and identifies the following readings out of spec. Standard: Operator identifies:

CRP 9-4, Reactor Water Cleanup Inlet Conductivity, HIGH out of spec CRP 9-3, RWCS A/B HPCI BUSLOGIC FAIL 3-N-9, Annunciator Energized CRP 9-3, Torus water temperature (TI-16-19-33C), HIGH out-of-spec CRP 9-3, TI-16-19-33UA Instrument Check, HIGH out-of-spec SATAJNSAT *Step 4: Logs are taken IAW OP 0150 Section A. standards Standard:

All round sheet entries shall be neatly recorded using a black ink pen. . Entry errors will corrected by drawing a single line through the error initialing . Abnormal or unusual readings shall be circled, and identified by the letter . All circled readings shall be reported to the CRS. the correction and recording the correct reading, if applicable.

number designated in the appropriate turnover section and next to the reading.

SATAJNSAT

  • Step 5: Standard:

Communicates Out-Of-Spec readings to CRS Operator communicates the 4 00s readings to CRS. Interim Cue: Inform the Operator that no further actions are necessary for this JPM. TIME mSH: Terminating Cue: Logs readings complete; CRS informed of 00s readings Evaluator Comments:

System: N/A WA: 2.1.33 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Reference:

Task Number: 3517290105 Perform DW Temperature Profile Surveillance OP 41 15, Primary Containment Surveillance, Rev 43 Task Performance:

AO/RO/SRO - RO/SRO _. Only - SE Only 3 Sequence Critical:

Yes - No 3 Time Critical:

Yes _. No Individual Performing Task:

Examiner:

Date of Evaluation: Activity Code:

Method of Testing: Simulation - Performance X Discuss Setting: Classroom - Simulator X Plant Performance Expected Completion Time:

15 minutes Evaluation Results:

Performance:

PASS - FAIL - Time Required:

Prepared by: Operations Training Instructor Date Reviewed by: SRO LicensedKertified Reviewer Date Approved by: Operations Training Manager Date Directions: Discuss the information given on this page with the operator being evaluated.

Allow time for him to ask questions before beginning performance of the task.

As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat".

Comments are required for any "Unsat" classification.

If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?" Read to the person being evaluated: Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have. This JPM will be performed in the Simulator and you are to simulate the actions, You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task. Initial Conditions:

The reactor is operating at 100% power at steady state conditions. Drywell Air Temperature has been trending up slowly. Initiating Cues: You have been requested by the CRS to perform a Drywell Temperature profile per OP 41 15, Section F. CRP 9-25 temperatures, RRU lineup data, and RBCCW data, has been taken. Task Standards:

Drywell Temperature averages calculated. Required Materials:

VYOPF 41 15.05, Drywell Temperature Profile; OP 41 15, Primary Containment Surveillance Simulator Setup:

Any 100% Power IC Evaluation TIME START:

SATAJNSAT SATAJNS AT Performance Steps Step 1: Obtain Procedure Standard:

OP 4115 obtained and Section F reviewed.

Step 2: Obtain VYOPF 4115.05 Standard:

VYOPF 41 15.05 obtained. Interim Cue: Provide Operator with VYOPF 41 15.05. Form will be partially filled in with RRU lineup, RRU Return temperatures, and RBCCW lineuphemperatures completed.

SATAJNSAT SATAJNSAT SATAJNSAT SATAJNSAT SATKJNSAT

  • Step 3: Record Drywell Temperature computer points for elevations 250', c 270', 270-315', and > 315'. Standard: Individual records the following computer points: MO-20, MO-21, MO 22, MO-23, MO-24, MO-14, MO-15, MO-16, MO-17, MO-12, MO-13.
  • Step 6: Record Drvwell Temperatures from Steam Leak Detection Touch Screen monitor for elevations

< 270', 270'-315', and > 315'. Standard:

Steam Leak Detection Touch Screen Monitor, CRP-9-21, Drywell screen selected and the following channels recorded: Channel 1,2,3,4,15,16,17,5,6,7

  • Step 7: Calculate Drywell average temperatures for elevations:

250', < 270', 270-315', and > 315', and record. Standard: Drywell average temperatures for elevations: 250', < 270', 270-3 15', and > 3 15'. calculated and recorded.

Step 8: Verifv Drywell average temperatures within Acceptance Criteria Standard: Drywell average temperatures checked against Acceptance Criteria for each elevation.

Step 9: Standard: Sign, Date and Time form VYOPF 4 1 15.05 signed, timed and dated.

TIME FINISH: Terminating Cue: VYOPF 4115.05 completed and given to the SWCRS Evaluators Comments:

System: 295028 WA's: EA2.01 System: 295012 K/A's: AA2.01 System Generic WA's: 2.4.48,2.2.12,2.1.19 Examinee Handout Initial Conditions:

The reactor is operating at 100% power at steady state conditions. Drywell Air Temperature has been trending up slowly.

Initiating Cues: You have been requested to perform a Drywell Temperature profile per OP 41 15, Section F. CRP 9-25 temperatures, RRU lineup data, and RBCCW data has been taken.

Re p\CtceNEd Ro Ad ru, I13 J Pro A I 2 'Tempate DRYWELL TEMPERATURE PROBE LOCATIONS Identify any out of service temperature probe with INOP and ensure a WR is submitted. CRP 9-25 TR 1-149 Place a 4 Mark If RRU In Operation Point 1. RRU 1 Return \3c\ OF 5. RRU 1 Disch OF RRU 1 A 4 B OF RRU 2 A 4 B OF RRU 3 A 4 B 4 B OF RRU 4 AT B 2. RRU 2 Return 143 OF 6. RRU 2 Disch 3. RRU 3 Return $45 OF 7. RRU 3 Disch 4. RRU 4 Return \42 OF 8. RRU 4 Disch RBCCW HX IN SERVICE (A or B) A. Calculate the average temperature for each Drywell elevation.

A RBCCW HEAT EXCH OUTLET cP'l.m\ OF (MOOS or M009) A = Sum of all operable sensors B = number of all operable sensors DRYWELL TEMPERATURE FOR ELEV. 250' IN VICINITY OF RECIRCULATION PUMPS r&C (DBD-OIHVAC-04 1-01 ) MO-20 \2&5 OF MO-22 \=OF Acceptance Criteria:

Max. 11350F 2. DRYWELL TEMPERATURE FOR ELEV. BELOW 270' COMPUTER POINT STEAM LEAK DETECTION TOUCHSCREEN MONITOR (M0-2 0 +M0-2 2 / 2 ) = \3O 5 OF 'I TN CRP 9-21 (DRYWELL SCREEN)

= = 126.8 l-w \28*5OF MO-22 I31.80~ CHANNEL 1 (\q.yoF T MO-21 \W°F MO-23 \=OF 2 AVG 3 1 4.6OF (<270') Acceptance Criteria:

Max. Avg. <150°F 4 &OF MO-24 mF TI-16-19-30B (DW)

\28.YOF TR-16-19-45 (DW) \ \o OF 3. DRYWELL TEMPERATURE FOR ELEV. 270' TO 315' COMPUTER POINT l-?_-Pc & /~0-14 \\6,6 OF M0-15 \2L\.\ OF MO-16 \-OF I MO-17 \29,8 OF STEAM LEAK DETECTION TOUCHSCREEN MONITOR CRP 9-21 mLL SCKhm) CHANNEL 15 1\39 OF T = 16 \\9.GoF AVG 17 \23.8OF (270'-315') Acceptance Criteria:

Max. Avg. ~185OF 4. DRYWELL TEMPERATURES ABOVE ELEV.

315' COMPJJTER POINT STEAM LEAK DETECTION TOUCHSCREEN MONITOR CRP 9-21 (DRYWELL SCREbN)

MO-12 \\~.QoF CHANNEL 2 = \\8.6 :E TAvG= MO-13 \\q.a "F 7 (\q.O°F (>315') r - Acceptance Criteria:

Max. Avg. 527O0F Evaluated By Date Reviewed By Date Page 1 of 1 VYOPF ,4115.05 OP 4115 Rev. 43 Shitt Technical Advisor (Print/Sign) a Shitt Manager (Print/Sign)

LPC #6 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title: Failure Mode: N/A

References:

Locate and Determine Radiological Requirements for Inspection of RCU Valve V12-19A (CU-19A)

AP 0541, "Access to High and Very High Radiation Areas," Rev. 9 OP 21 12, "RWCU System", Rev.66 AP 0503, Establishing and Postinp - Restricted Areas", Rev.27, LPC 1 Task Number: 2990100301 Task Performance:

AO/RO/SRO - RO/SRO Only X SE Only - Sequence Critical:

Yes - No X Time Critical:

Yes - No X Individual Performing Task: Examiner:

Date of Evaluation: Activity Code:

Method of Testing: Simulation X Performance - Discuss Setting: Classroom - Simulator - Plant X Performance Expected Completion Time:

10 minutes Evaluation Results:

Performance:

PASS - FAIL - Time Required:

Prepared by: Operations Training Instructor Date Reviewed by:

SRO LicensedKertified Reviewer Date approved by: Operations Training Supervisor Date Directions:

Discuss the information given on this page with the operator being evaluated.

Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification.

If a step is preceded by an asterisk (*), it is a critical step.

If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure. After providing the initiating cue, ask the individual "Do you understand the task?" Read to the person being evaluated: Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have. This JPM will be performed in the Plant and you are to simulate the actions. You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task. Initial Conditions:

"a 0 0 0 The previous shift prepared the "A" RCU Pump for startup in preparation for swapping operating pumps per OP 21 12, Section B Abnormal indications were observed during the initial start attempt of RCU Pump "A" You have been requested to verify that valve CU-19A (RCU Pump "A" suction valve) is positioned properly for a pump start.

Initiating Cues: Locate CU-19A using plant reference materials and identify the area radiological conditions.

Also identify any access requirements for entering this area to verify the position of the valve.

Task Standards:

Valve location identified in High Radiation Area, and associated AP 0541 requirements determined Required Materials:

0 0 0 OP 21 12, "Reactor Water Cleanup System" (latest revision)

AP 0503, "Establishing and Posting Restricted Areas" (latest revision) AP 0541, "Access to High and Very High Radiation Areas" (latest revision)

'mulator Setup: N/A TIME START:

SATAJNSAT Step 1: Obtain Procedure OP 2112 and review admin limits, precautions, and prereuuisites Standard:

OP 21 12 obtained; admin limits, precautions, and prerequisites reviewed ~ ~~ ~ ~~ Interim Cue: Inform Operator that all prerequisites are SAT SATPUNSAT Step 2: Review appropriate section of the procedure for positioninp of the suction valve Standard: Identifies and reviews Section B, Step 6.a.2.

SATAJNSAT

  • Step 3: Using OP 2112 Appendix A, identify the location of CU-19A Standard: Locates Appendix A of OP 21 12 (RWCU Valve Lineup), and determines CU- 19A located in RCU A Pump Room (page 2 of 7) b . Examiner Note: If the candidate states they know where the valve is located, ask them to verify the valve location via procedure.

SAT/UNSAT *Step 4: Refer to RWP OR AP 0541 to determine access requirements for the area - Standard:

Identifies the following requirements:

0 One of the following:

An RWP covering the scope of the work RP notification prior to entry (asking for the RWP constitutes the RP notification) o Continuous dose rate monitoring, or o Integrated dose rate device with alarm, or 0 Continuous RP technician coverage. Examiner Note:

When asked for RWP, provide RWP 07-0001 l(Genera1 Operations Support, Tagging, System Lineup Duties).

SAT/UNSAT

  • Step 5: Refers to Survey Map for the appropriate area OR Refers to AP 0503 Form VYAPF 0503.01 (High and Verv High Radiation Protection Area Logsheet) held bv Rad Protection and Locate RCU 'A' pump room Standard:

Requests and refers to appropriate survey map Interim Cue: When operator requests survey map, provide the completed survey map.

IF operator requests RP to provide .01 form, provide filled out form to the operator.

TIME FINISH: Terminating Cue: Valve CU-19A determined in a High Radiation Area, and AP 0541 requirements identified Yvaluator Comments:

  • a,. System: 299000 WA: 2.3.1

". Task Identification:

Title: Failure Mode:

Reference:

Task Number: Task Performance: Sequence Critical:

Time Critical: VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 PAR Rased on Plant Conditions (Shelter) - NIA OP 351 1 Off-Site Protective Action Recommendations, Rev 23 3441703,34470603 AOROISRO - RO/SRO - SRO Only 2 Yes - No 3 Yes2 No- Operator Performing Task: Examiner:

Date of Evaluation: Activity Code:

  • el Method of Testing: Simulation

__ Performance Discuss

___ Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance:

PASS - FAIL - Time Required:

Prepared by: Operations Training Instructor Date Reviewed by: SRO LicensedCertified Reviewer Date Approved by: Operations Training Superintendent Date

. . Directions: Discuss the information given on this page with the operator being evaluated.

Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat".

Comments are required for any "Unsat" classification.

If a step is preceded by an asterisk (*), it is a critical step.

If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure. After providing the initiating cue, ask the operator "Do you understand the task?" Read to the person being evaluated: Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have. This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task. Initial Conditions:

A large break LOCA has occurred. The following plant data is available:

0 Rx water level is 30" and stable with both Core Spray pumps running. 0 Containment RAD level is 2000 Whr and stable. 0 Torus pressure is 20 psig and decreasing slowly.

0 Containment isolation valves AC-6 and AC-6B have failed to close. Rad levels in the Reactor building are between 10 and 500 mR/hr. 0 No report of rad levels at the site boundary or beyond at this time.

0 A stack release is in progress.

The Stack Gas High Range Rad monitor is reading 5OOmWhr 0 The Shift Supervisor has declared a General Emergency and the EOF has not yet been manned. InitiatinP Cues: You are to make the initial PAR based on plant conditions per OP 351 1. You have 15 minutes to complete this task. Task Standards:

OP 351 1 Att. 9.5, complete. Required Materials:

OP 35 11 and Att. 9.5 OP 3513 Att.

9.7 -wmdator Setup: N/A [ERRS data can be obtained in EOF (classroom)]

. Evaluation Performance Steps TIME START: SATAJNSAT Step 1: Obtain Procedure OP 3511 and review precautions.

Standard:

Operator obtains and reviews procedure.

SAT/UNSAT

  • Ster, 2: Using Att. 9.4 determines wind direction from meteorological data. Standard:

Operator records current upper wind direction on Att. 9.4 NOTE: MET DATA is variable in the simulator and may be different in the same IC from day to day. Evaluators should verify correct wind direction and down wind towns prior to JPM. Operator may chose to reference OP 3513 Att. 9.7 for guidance on obtaining MET data from ERRS (15 minute average).

kv SAT/UNSAT

  • Step 4: Is there substantial core damage in progress or proiected.

Standard:

Operator answers NO to "substantial core damage" decision block due to containment rads ~4000 R/Hr, Core Spray pumps running. SAT/UNSAT *Step 5: Is there simificant release underway.

Standard:

Operator answers NO to "significant release" decision block due to stack radiation levels of ~4000 lU*3i-, and no high rads in Reactor building and low rad levels at the site boundary, SATAJNSAT

  • Step 6: Recommend shelter of towns Vernon, Hinsdale and any towns 5 miles downwind (refer to Att. 9.1 of OP 3511). Standard:

Operator determines correct PAR and completes OP 351 1 Att. 9.5, section 1:

Plant Conditions SATKJNSAT Step 7: If available, a second individual should independently verify the PAR. The verification may be performed bv the individual who is approvinp the PAR (PED, TSC Coordinator, or Site Recovery Manager). Standard: Operator requests second check. Interim Cue:

I concur with your PAR.

SAT/UNSAT

  • Step 8: Record appropriate PAR information in Section I of OP 3511 Att. 9.5. - Standard: Operator records PAR data on OP 351 1 Att. 9.5. Interim Cue: Provide operator with a blank copy of OP 351 1 Att. 9.5, if asked. *,r SATAJNSAT Step 9: Review PAR with the Site Recovery ManaPer or senior manager in charpe to obtain approval.

Standard Operator requests approval of PAR from Shift Manager. Interim Cue:

15 MINUTE CLOCK STOPS HERE. The Shift Manager states that he will complete the remainder of the procedure.

TIME FINISH: Terminating Cue: Operator completes PAR within 15 minutes.

Evaluators Comments:

System: 295038 KIA: 2.4.44 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title: Failure Mode:

Reference:

Task Number: xxxxxx Review Containment Purge and Vent Hours Log VYOPF 2115.04 in preparation for scheduled containment purge.

Containment Purge and Vent Operation Limit exceeded with containment required.

OP 21 15, "Primary Containment," Rev.

78 Task Performance:

AO/RO/SRO - RO/SRO Only X SE Only - Sequence Critical:

Yes - No X Time Critical:

Yes - No X Individual Performing Task:

Examiner:

Date of Evaluation:

  • I. Activity Code:

Method of Testing: Simulation X Performance - Discuss Setting: Classroom - Simulator - Plant X Performance Expected Completion Time:

10 minutes Evaluation Results:

Performance:

PASS - FAIL - Time Required:

Prepared by: Operations Training Instructor Date Reviewed by: SRO LicensedCertified Reviewer Date

"*. Approved by: Operations Training Supervisor Date Directions:

Discuss the information given on this page with the operator being evaluated.

Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk

(*), it is a critical step.

If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure. After providing the initiating cue, ask the individual "Do you understand the task?" Read to the person being evaluated: Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have. This JPM will be performed in the Plant and you are to simulate the actions. You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing. Inform me upon completion of this task. Initial Conditions:

The plant is at 100% power. Initiating Cues: You are the CRS. Perform supervisory review of VYOPF 21 15.04, "Containment Purge and Vent Hours Log" prior to a scheduled purge estimated to last 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />. Task Standards:

1. Review of VYOPF 21 15.04, "Containment Purge and Vent Hours Log" has been completed.
2. Recognizes that the "Total Duration This Year" (column D) will not allow a 9 hour1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> purge to be completed without exceeding 90 hour0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> limit. Shift Management has been notified. Required Materials:

OP 21 15, "Primary Containment,"

Rev. 78 VYOPF 21 15.04, "Containment Purge and Vent Hours Log" Simulator Setup:

NIA TIME START: SAT/UNSAT Step 1: Standard:

Obtain Procedure OP 2115 OP 21 15 precautions, limitations, and Section B. obtained and reviewed

~- ~~ ~ Interim Cue: Provide OP 21 15 (partial) and completed VYOPF 21 15.04 SAT/UNSAT *Step 2: Reviews VYOPF 2115.04 Standard: Identifies error on the form which would cause the scheduled containment purge, if performed, to exceed the 90 hour0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> limit. Evaluator Note:

If calculation error of "Total Duration This Year" is not found then the purge would be permitted SATJWSAT *Step 3: Notifies SM if 9 hour1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> purge were performed the limit would be exceeded Standard:

SM is notified that a 9 hour1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> purge would exceed the limits TIME mISH: Terminating Cue: Review of form completed.

SM notified of error on form.

Evaluator Comments:

System: w. WA: 2.3.9 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title: Failure Mode: - NIA

Reference:

Task Number: 3420040302/03 Review Switching and Tagging Order AP 0140, Vermont Yankee Local Control Switching Rules, Rev.26, LPC 3 EN-OP- 102, Protective and Caution Tagging, Rev.4 Task Performance:

AO/RO/SRO - RO/SRO - SRO Only X Sequencecritical:

Yes X No Time Critical:

Yes __ No 2 Individual Performing Task:

Examiner:

Date of Evaluation: Activity Code:

Method of Testing: Simulation X Performance - Discuss Setting: Classroom - Simulator - Plant 3 Performance Expected Completion Time:

30 minutes Evaluation Results: Performance: PASS - FAIL - Time Required:

Prepared by: Operations Training Instructor Date Reviewed by:

SRO LicensedKertified Reviewer Date Approved by: Operations Training Supervisor Date Directions: Discuss the information given on this page with the operator being evaluated.

Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification.

If a step is preceded by an asterisk (*), it is a critical step.

If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Perf'ormance Measure. After providing the initiating cue, ask the individual "Do you understand the task?" Read to the person being evaluated: Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have. This JPM will be performed in the Plant and you are to simulate all actions. You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task. Initial Conditions:

The plant is operating normally. The "A" CRD Pump has been secured due to indications of a clogged suction filter (F-27-A).

The 'B' CRD pump is in service. si* Initiating Cues: You are to perform the technical review of a Switching and Tagging Order for change-out of the "A" CRD Pump Suction Filter. The Computerized Switching and Tagging Software program is not available. Ensure tagging sequence is in accordance with recommended tagging order per EN-OP- 102 Attachment 9.2. Actual tags are not required to be reviewed.

Task Standards:

CRD Pump "A" Suction Filter adequately isolated per Switching and Tagging Order to allow filter change-out.

Rewired Materials: AP 0125, Plant Equipment AP 0140, Vermont Yankee Local Control Switching Rules (latest revision)

OP 21 11, Control Rod Drive System (latest revision) EN-OP-102, Att.

9.3, 9.4 P&ID G-191170 TIME START:

SAT/UNSAT Step 1: Reviews Att. 9.3 and obtains appropriate P&ID Standard:

Once operator finds P&ID, provide a copy Reviews scope of work on Att. 9.3 and obtains P&ID G191170 Interim Cue: ~ ~ Interim Cues: 1. Provide Operator with a copy of EN-OP-102, if requested. 2. Provide prepared ATT. 9.3 and 9.4 to the operator.

3. If operator asks to review AP 0125, provide copy.

SATKJNSAT

  • Step 2: Reviews the prepared taaout (Att. 9.4) with the valves, associated positions and sequence necessary to tag out the "A" CRD Pump Suction Filter Standard:

The operator reviews the tagout and identifies that following valves, positions and sequence are incorrect.

Errors are in BOLD. SEO Component Position 1 CRDlV3 -3 5A (inlet isolation)

CLOSED 2 CRDN3 - 158A (outlet isolation)

CLOSED 3 CRDN3- 156A (vent) OPEN 4 CRDN3-157A (drain) OPEN 6 CRDlV3 - 159A (filter bypass) OPEN 5 CRDP-38-1A C/S (Pump Ctrl Sw) CAUTION Error #1 - the sequence for V3-156A and V3-157A is reversed.

Error #2 - Valve V3-158A is the filter bypass not the outlet isolation.

It should be open. Error #3 - Valve V3-159A is the outlet isolation and should be closed and sequenced

  1. 2. Interim Cues: Once the problems are identified, tell the operator to make the changes necessary to complete the required work (as stated in ATT. 9.3). ~aminer Note: Sequencing shall be as follows: (i.e. 35A sequenced before 159A, 159A sequenced before 157A, etc.).

SAT/UNSAT

  • Step 3: Makes corrections Standard:

Operator makes changes to the Tags On / Placement section of the form with the following corrections:

The final tagout shall read as follows: *= Component Position Location 1 CRD/V3 -3 5A

  • CLOSED RB 232/SW Cnr/CRD Pump Rm 2 CRDN3-159A" CLOSED RE3 232/SW CnrKRD Pump Rm 3 CRD/V3 - 1 5 7A
  • OPEN RB 232/SW Cnr/CRD Pump Rm 4 CRD/V3 - 1 56A
  • OPEN RE3 232/SW Cnr/CRD Pump Rm 6 CRD/V3-15 8A OPEN RB 232/SW Cnr/CRD Pump Rm 5 CRD/P-38-1A/lB C/S CAUTION CRB 272/control dCRP9-5 *Note: The only sequence-critical elements are 1,2,3,4. Sequence tags #5 and #6 can be done at any point. Werim Cue: Once the operator states the corrections are complete, the JPM is complete.

If the applicant simply identifies that the tagout is wrong and needs to be redone then direct the applicant to note any discrepancies on the form and then return it. i TIME FINISH: Terminating Cue: Appropriate components/positions identified and EN-OP-150 Att. 9.3 and 9.4 errors corrected to allow for change-out of the CRD Pump "A" Suction Filter.

Evaluator Comments:

System: 201001 KIA: 2.2.13 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title: Failure Mode: N/A

Reference:

Task Number: 3420260302/3 Review Completed Surveillance and Take Action for Out of SDec Data OP 4124, "Residual Heat Removal System Surveillance Procedure," Rev.

110 Task Performance:

AO/RO/SRO

__ RO/SRO Only X SE Only - Sequence Critical:

Yes - No X Time Critical:

Yes - No X Individual Performing Task: Examiner:

Date of Evaluation:

\a, Activity Code: Method of Testing: Simulation X Performance - Discuss Setting: Classroom - Simulator - Plant X Performance Expected Completion Time: 15 minutes Evaluation Results: Performance:

PASS - FAIL - Time Required:

Prepared by: Operations Training Instructor Date Reviewed by: SRO LicensedKertified Reviewer Date Approved by: Operations Training Supervisor Date Directions:

Discuss the information given on this page with the operator being evaluated.

Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification.

If a step is preceded by an asterisk (*), it is a critical step.

If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure. After providing the initiating cue, ask the individual "Do you understand the task?" Read to the person being evaluated: Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have. This JPM will be performed in the Plant and you are to simulate the actions. You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task. Initial Conditions:

The RHR Loop "A" Valve Operability Test has been submitted to you for review and signature. InitiatinP Cues:

Review the provided surveillance data and sign as Shift Manager.

All other paperwork related to the surveillance has been reviewed and approved.

Task Standards:

00s closure time for RHR-65A valve noted on surveillance; 7-day LCO identified per TS 3.5.A.4.b Required Materials:

0 0 0 OP 4124, "Residual Heat Removal System Surveillance Procedure" (latest revision)

VYOPF 4124.01A, "RHR Loop 'A' Valve Operability Test" (latest revision)

VY Technical Specifications (Section 3.5 for each applicant) Simulator Setup:

N/A TIME START:

SAT/UNSAT Step 1: Obtain Procedure OP 4124 (Residual Heat Removal System Surveillance Procedure) and review procedure Standard:

OP 4124 precautions, limitations, and Section E. obtained and reviewed Interim Cue: Provide completed OP 4124 and VYOPF 4124.01A, for RHR Loop "A" SAT/UNSAT

  • Step 2: Review log. sheet data for sheets provided Standard:

Identifies RHR-65A closure time 00s SATRJNSAT SAT/UNSAT SATAJNSAT "Step 3: Standard:

Reviews Acceptance Criteria 1 and 2 on log. sheet RHR-65A slow closure time fails Acceptance Criteria 2

Identifies OP 4124 criteria for operability

  • Step 5: Standard:

Refer to Technical Specifications Section 3.5 Locates 3.5.A.4.b as the applicable specification SAT/UNSAT "Step 6: Identifies 7-dav LCO Standard:

Seven-day LCO per TS 3.5.A.4.b identified TIME FINISH: Terminating Cue: Valve closure time identified as 00s and correct LCO entered. Evaluator Comments:

System: WA: 2.1.12 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title: Failure Mode:

Reference:

Task Number: xxxxxxx Perform a Core Thermal Hydraulics Limits Evaluation MFLPD has exceeded its Administrative Limit OP 4401 "Core Thermal Hydraulics Limits Evaluation", Rev.34 Task Performance:

AO/RO/SRO - RO/SRO - SRO Only X Sequencecritical:

Yes X No Time Critical:

Yes - No 2 Individual Performing Task: Ex miner: Date of Evaluation: Activity Code:

Method of Testing: Simulation X Performance - Discuss Setting: Classroom

_. Simulator - Plant Performance Expected Completion Time: 15 minutes Evaluation Results: Performance:

PASS - FAIL - Time Required:

Prepared by: Operations Training Instructor Date Reviewed by: SRO LicensedCertified Reviewer Date Approved by: Operations Training Supervisor Date Directions: Discuss the information given on this page with the operator being evaluated.

Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification.

If a step is preceded by an asterisk (*), it is a critical step.

If a critical step is slupped or performed unsatisfactorily, then the individual has failed the Job Performance Measure. After providing the initiating cue, ask the individual "Do you understand the task?" Read to the person being evaluated: Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have. This JPM will be performed in the Plant and you are to simulate all actions. You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task. Initial Conditions:

The plant is at 100% power. Initiating Cues: You are required to perform the Daily Core Thermal Hydraulics Limit Evaluation.

Task Standards:

Daily Core Thermal Hydraulics Limit Evaluation performed IAW OP 4401, MFLPD identified as exceeding the Administrative limit and communicated to the Shift Manager and Reactor Engineering.

Required Materials:

OP 4401, Core Thermal Hydraulics Limit Evaluation (latest revision)

TIME START: SAT/UNSAT Step 1: Obtains and reviews procedure OP 4401 Standard:

Procedure obtained and reviewed.

~~ Interim Cues: Provide Operator with a copy of OP 4401 When asked to print out a 3D Monicore Case, provided candidate with 3D Monicore Case to be used for this JPM.

SAT/UNSAT

  • Step 2: Completes Form VYOPF 4401.01 Standard:

Operator completes form and identifies that Item #5 - MFLPD is out of spec. '?valuator Note:

Look at standard form and compare candidate's results with what is expected. Interim Cues:

Whedif asked to verify all control rods positions on the 3D Monicore Case are correct, inform the candidate that control rod positions are correct (VYOPF4401.01 Step 2). Whedif asked to check the APRM gains, inform the candidate that the gains have been verified SAT and are all 21.0 (VYOPF4401.01 Steps 7 and 9D). Whedif asked for the Administrative Limits, provide the candidate with a copy of the Thermal Limit Status Board (VYOPF4401.01 Step 8). SATAJNSAT

  • Step 3: Verifv MFLCPR, MFLPD and MAPRAT from Steps 4 - 6 are less than or equal to Administrative Limits posted on Thermal Limit Status Board. If not, contact Reactor EngineerinP.

Standard: Operator identifies that IvFLPD at location 29-14-15 has exceeded the Administrative limit . Contacts Reactor Engineering and informs them of the MFLPD Administrative Limit being exceeded. Interim Cues:

Acknowledge as Reactor Engineering

SATAJNSAT Step 4:Notifies Shift Manager of MFLPD has exceeding the Administrative Limit.

Standard:

Notifies Shift Manager Interim Cues: ~ ~ ~~ ~- Acknowledge as the Shift Manager SATAJNSAT

  • Step 5: Verify the Acceptance Criteria below are satisfied.

If A, B, C or D below are not satisfied, enter applicable Tech. Spec. LCO. Standard: Operator verifies that MFLCPR, MFLPD and MAPRAT are all 51 and that APRM Gain is 21.0 (provided from earlier cue). Subsequently, all Tech Spec Acceptance Criteria has been satisfied (No T.S. violation).

Terminating Cue: Once the operator completes the form and identifies the thermal limit Administrative Limit violation, the JPM is complete.

TIME FTNISH: Evaluator Comments:

system: WA: 2.1.7